Tom Beckett - PFLD-Archives/Meridian-Depthworks-Archives GitHub Wiki

Tom Beckett

Tom Beckett was a Reactor Operations engineer at Meridian Depthworks Centre and one of the four personnel who manually ejected the S.F.R. fuel cells during the 1987 Thermal Runaway.

Tom Beckett
Full name Tom Beckett
Affiliation Parafield Scientific Innovators, Reactor Operations
Occupation R:O engineer
Location Sector B
Education Bachelors in Electrical Engineering, Masters in Control Systems, Meridian Technical Institute
Status Critical (1987), fate unrecorded
First appearance 1987/10-18/Log-MDC-Meltdown-News.md

Biography

Beckett was the Hex-Triad calibration specialist on his shift, responsible for keeping the six C-2500 units in nanosecond alignment. He joined Parafield in 1981 straight out of Meridian Technical Institute and built a reputation for catching symmetry drift before the instruments flagged it.

He was one of four personnel who entered the reactor environment during the October 1987 Thermal Runaway and manually ejected all four fuel cells within the synchronization window after the failed primary SCRAM. The ejection stalled the reactor and saved the superstructure.

He was transported to the hospital in extremely critical condition. No further records have been recovered.

Personality

Meticulous to the point of superstition about calibration rituals. Quiet in meetings, loud during drills. Trusted Moreau's calls without question.

Relationships

Appearances

  • LOGS/1987/10-18/Log-MDC-Meltdown-News.md (in main repo)
  • LOGS/1987/10-13/PSI-SCRAM-1987-1013.md (in main repo)
  • LOGS/1987/10-13/PSI-EJECT-1987-1013.md (in main repo)
  • LOGS/1987/10-13/PSI-EJECT-1987-1013-TARTARUS.md (in main repo)

Cat-Characters Cat-Operations