External production
No contents entries on this page
Contents
Per default external production is ordered as service item: Purchase Order with service item
if additional material is needed for the external production order: Purchase Order with service item and provision
Process: an external production is worked off in the following steps:
Preparation create service items, set up warehouse, operation and resource. Create external operation, assign suppliers and items
Pricing is indicated in the configuration wizard
Work Order is created
Purchase Order is created
Incoming Goods are posted
Provision parts are posted
linktraining Example video External operation with provision
The following procedure is not recommended: Purchase Order as a Service Order. This is available only for compatibility Reasons.
hmtoggle_plus1Time reservation and lead time
An external work order can also reserve times on its stored resource. All calculations are made exactly as with a normal routing position. However an external production does not normally have a resource limit. To deactivate observation of resource limits, go to "Observe resource limits" in the resource
Pure lead times (the time from purchase order to delivery) can be specified as follows:
With consideration of the factory calendar: Mach+labor time (if quantity-dependent) or setup time (not quantity-dependent) Specification in hours. To specify in days: Open the corresponding resource Specify the planned capacity / day = 1 hour Now 1 hour in the external operation sequence corresponds to a day.
Without consideration of the factory calendar: If you do not want to consider the factory calendar, the lead time is specified in idle time (in hours). 24 hours correspond to one day.
see Pricing and transport costs