Production > Capacity planning > APS > Planning view - robinfeng/beashelp GitHub Wiki

计划视图



Navigation: Production > Capacity Planning > APS: Planning View No contents entries on this page Contents The planning view provides the following possibilities:

  1. Filter production orders by resource usage and other criteria
  2. Sort production orders
  3. Plan and dispatch production orders
  4. Change/set flags

Multiple selection and mass operations are supported. see Multiple selection.

Column description see APS work order list

Planning tab Button Meaning Gannt Open the Gannt view, display all work orders, for which the column "OK"- was checked. see APS work order list Resources Opens a selection screen, which resource to be taken into account in planning. Note: all manufacturing assemblies are displayed, which contain one of the selected resource. Filter works by work orders, not by assemblies. Example: Work order 5 Assembly 10 - Resource 1001 Assembly 20 - Resource 1002

Filter by "Resource 1001" In this case, assemblies 10 and 20 are displayed. Filter Opens filter settings ( priority, document number, start-/delivery date, project etc) Mark The selected work order is marked ( In the first column of the production list a hooklet is set (OK) Manual sorting Active:you may sort the work order by drag and drop. It is possible to select multiple entries and to move the highlighted area. To do so, keep the Ctrl key pressed and use the left mouse button to select multiple entries. To select a range, click on the first entry, hold the Shift key and click the last entry with the left button. Sorting save save the current sorting. Explanation on sorting: If 2 production orders start simultaneously and both require the same resources, the first production order receives the free resource first and the second can only be scheduled afterwards. The sequence therefore determines which production order receives the free resources first. Calculate Starts the scheduling of all marked work orders

Field Description Calculation Shows the current calculation type. The orange reference arrow opens the setting APS Calculation types View Current view (default) The orange reference arrow opens the settings of planning view Sorting Select from different sortings. see APS edit planning Collective action Set hooklet, to perform the action selected in lower field for all marked work orders Delivery date Select delivery date, with click on the red/black icon the change is applied to all marked work orders Start date Select start date, with click on the red/black icon the change is applied to all marked work orders Production type Select production type, with click on the red/black icon the change is applied to all marked work orders

Assembly tab Button Meaning Block A blocked work order is not dispatched, it has no calculated start or end date,no times are reserved. You cannot select the work order via FDC or posting screens. Unlock Work order is released for planning Block scheduling planning is blocked Release planning planning is released Unplanned Set all marked work orders to unplanned Planned Set all marked work orders to planned. More detailed settings: Calculation types: eg."do not reschedule planned work orders". Open Opens the selected work order Structure view Opens the structure view for the selected work order

Field Meaning Collective action Perform the selected action for all marked work orders

Work Order tab Button Meaning MRP block Scheduling in MRP is blocked for the selected assembly MRP unlock Scheduling in MRP is released for the selected assembly Time receipt block Time receipts for the selected assembly are allowed Time receipt unlock Time receipts for the selected assembly are not allowed Goods mvmnts block Postings on the selected assembly are allowed Goods mvmnts unlock Postings on the selected assembly are not allowed

Field Meaning Collective action Perform the selected action for all marked work orders Delivery date If a date is entered and clicked on the "replace" icon, for the selected work orders the previously set dates ( planned start and finish time) are replaced. Start date see delivery date

Reports tab Button Meaning Shortage Open a list of shortages for the selected work order Material requirement Open the material requirement list for the selected work order Dispatches show all dispatches of all resources for the selected work orders. See dispatches

Filter works by work orders, not by assemblies.

Example: Work order 5 Assembly 10 - Resource 1001 Assembly 20 - Resource 1002

If now, work order 5, assembly 10 is selected, all dispatches for resource 1001 and resource 1002 are displayed.

Pool tab Button Meaning Calculate Calls the function pooling Administrate Open Pool structure list

Below, all work orders are displayed in the production list