Production Capacity planning APS Planning view APS production list - robinfeng/beashelp GitHub Wiki

APS 生产列表


Navigation: Production > Capacity Planning > APS > Planning View: APS production list No contents entries on this page Contents Only work orders are displayed, which correspond to the above chosen filter settings, and which require at least one of the selected resources. The structure of the production can be freely defined via right click window settings. There are many more columns available and can be displayed. The definition applies to the current planing view. Further filtering and sorting is possible at any time by right click on a column heading.

In Edit APS planning views - Field description 4 more fields can be defined to be displayed here. see Field description

Default setting at delivery Field Meaning OK if marked, work order is selected and will be considered for the current action Document Number of work order document Position Word order position Work order Work order number Type Production type Item Item Blocked if active, the item cannot be scheduled Planned already planned ? Printed already printed ? In work hmtoggle_plus1 Work order already started?

Active, if there are time receipt messages for the work order.

IMPORTANT: refers to the complete work order not only the assembly.

Start fix Fixed start date Schedule automatically Work order is automatically rescheduled, if relevant information is changed MRP Visibility in MRP: if active, released for material scheduling Scheduling Capacity planning: if disabled, resources are not reserved Time Disable: no display in pool list, order time receipt blocked Booking Disable: Material postings on this BOM item are blocked Start structure Planned date: if red, in past Start date Actual planned start of assembly production ( calculated) End date Actually calculated end date Delivery date Delivery date of work order Material OK When calculated before scheduling Active if there are planned receipts or sufficient stock. When calculated after scheduling Active if there are planned receipts or sufficient stock, or if material can be replenished in time. Even if planned receipt would be too late, this check box is active.

If „Material OK“ is not active, in APS-list – right click information on shortage can be displayed. This report shows, which production receipts or purchases are too late and to which date material could be ordered. Material on stock Flagged, if the required material is on stock and could be withdrawn for the work order. Material is allocated following the order of the APS list. Planned receipts from purchase or production are not taken into account. Too late Flagged, if stock is not sufficient or if there is no receipt in due time. This check is only performed, if "material control after scheduling" is activated. See APS planning types Last calculation Type of last calculation. The ID of the last calculation for this work order is displayed. (forward, backwards, etc. ). If the work order was not calculated at last calculation due to settings, "fixed" will be entered there. see APS-calculation types Priority Priority of the work order. see Priorities Quantity Quantity to be produced Version Item version Print date Print date Warehouse Assembly warehouse = planned warehouse for posting in the assembly Material warehouse Material warehouse: from which warehouse will be the first BOM item charged off

back to Planning view