Production > Capacity Planning - robinfeng/beashelp GitHub Wiki

产能计划



Navigation: Production: Capacity Planning No contents entries on this page Contents beas supports a fully featured capacity calculation

Based on the priorities, machine capacities, factory calendars and many other factors, the latest possible start date for a work order is calculated. The calculation is performed automatically. The start of the complete work order, for each production item and also for each individual operation is determined. All types of resources can be reserved and the utilization can be represented graphically.

The simple backward scheduling method dispatches work orders only on the basis of the factory calendar and does not check the resource limits, whether another work order has been dispatches for the same day. Therefore overloads can occur. To avoid this, the APS must be used, which can take into account existing time reservations. The material availability can provide additional checks, so that the associated operation is started first, when material is available.

The capacity calculation is a core function that is used to the same extent for rough planning, MRP run, schedule specification and APS. Any methods can be set for APS in Calculation Methods . The standard package includes Default Calculation Methods which can then be used in APS planning .

Pool control uses the result of capacity planning and informs the employee in the shop about the operations that must be completed. For more general information, see Pool Control. Pool control is automatically updated and can be recalculated using Pooling/Scheduling.

linktraining Overview on various methods of capacity planning with beas