Production Capacity planning Pool structure report - robinfeng/beashelp GitHub Wiki
池结构报表
Navigation: Production > Capacity Planning: Pool Structure Report No contents entries on this page Contents The pool structure list is used for production planning and monitoring. Operation sequences are assigned to pools, they can be moved from one pool to another. In the pool list only the current pool ( usually Pool 1) is visible.
Field Description Field Meaning Resource which resource is used Description optional description Pool size Total pool size ( pool limit) Total (h) Totally available Free (h) Thereof free Avail. Material available?
More functions Function Meaning Add from Pool from which tool the operation is added Move To Move into a subordinated pool. For example from 1 to 2. The employee can no longer access this operation. The operation is now in the subordinated pool, it can only be started when the first pool has been worked off. If there was no pool 2, it will be created by this action.
Buttons Button Meaning Group Displays sorting by groups Sort replaces right click function in the respective field for sorting
see Pool Control
返回 主页