Aluminum Frame Vision One Package - zentoolworks/cnckits GitHub Wiki

STEP Y-01

STEP Y-01: Here is the acrylic board.

STEP Y-02

STEP Y-02: 6x M3x6 screws and 6x M3 nuts.

STEP Y-03

STEP Y-03: 3x TB6560 Driver Board.

STEP Y-04

STEP Y-04: Installed 3x TB6560 Driver Board.

STEP Y-05

STEP Y-05: 3x M3x6 screws, 3x M3 nuts and 3x spacer for installing Arduino Uno board.

STEP Y-06

STEP Y-06: Arduino Uno board.

STEP Y-07

STEP Y-07: Installed Arduino Board.

STEP Y-08

STEP Y-08: 1x Arduino Shield with 3x hardness wires.

STEP Y-09

STEP Y-09: Assemble ardrino board with arduino shield.

STEP Y-10

STEP Y-10: Hardness wire (black, green, blue, and red) plugs into arduino shield.

STEP Y-11

STEP Y-11: Wire up the 6-holes plug on driver board with wire color (black, red, blue, and green).

STEP Y-12

STEP Y-12: 2x M3x6 screws and 2x M3 nuts for installing DC Spindle Control.

STEP Y-13

STEP Y-13: DC Spindle Control.

STEP Y-14

STEP Y-14: Assembled DC Spindle Control.

STEP Y-15

STEP Y-15: Switch to 115V on Mean Well LRS-350-48 power supply of DC Spindle.

STEP Y-16

STEP Y-16: Wire up Mean Well Power Cord LRS-350-48 of DC Spindle (L-Brown, N-Blue)

STEP Y-17

STEP Y-17: Wire up the 2-holes plug on spindle control with wire (black and red).

STEP Y-18

STEP Y-18: Wire up the 3-holes plug on spindle control with wire (yellow, blue and green).

STEP Y-19

STEP Y-19: Plug both 2-hole (DC Spindle) and 3-hole (Spindle power supply) in spindle control board.

STEP Y-20

STEP Y-20: Switch to 115V on Mean Well 12V power supply of control package.

STEP Y-21

STEP Y-21: 2x M3x6 screws and 2x M3 nuts for installing DC Spindle Control.

STEP Y-22

STEP Y-22: Bundle 3x driver board red wires together and connect it in V+. Black wires are in V-.
Blue wire of Power Cord connects in N. Brown wire of power cord connects in L.

STEP Y-23

STEP Y-23: Wire up the 2-holes plug on driver board with wire (black and red).

STEP Y-24

STEP Y-24: Finished assembly.

STEP Y-25

STEP Y-25: When you receive the package of Vision one and control package, there's a bag of 12x M4 Screw.

STEP Y-26

STEP Y-26: Installed control package board.

STEP Y-27

STEP Y-27: 12x M4 Screw & 12x M4 washer.

STEP Y-28

STEP Y-28: Tighten M4 screw and washer on those two gantry.

STEP Y-29

STEP Y-29: 8x M6 Screw & 8x M6 Washer.

STEP Y-30

STEP Y-30: Tighten M6 screw and washer on those two gantry.

STEP Y-31

STEP Y-31: Completed.