u14 4 card contract route - yasufumi-nakata/mind-upload GitHub Wiki
Wiki: U14-4 card-contract route packet
A row-specific packet for the disclosure-first reproducibility row
This learning page is generated for GitHub Wiki. The public portal is managed on mind-upload.com.
- Updated: 2026-04-04 / Role: U14-4 route packet
Role Of This Page
This page fixes the current public route for U14-4 at the level of one question, one intended EEG route anchor, one bounded first artifact, and one funding bridge.
Accuracy Notes
This page does not claim field-wide reproducibility, deployment readiness, or standards adoption. It only records what the present EEG route can honestly close first.
Back To Public Pages
Related Wiki Pages
- Wiki: Current public six route brief - The compact six-row public route.
- Wiki: Deep focus notes - The wider six-row working note.
- Wiki: Grant and dataset playbook - The fixed funding and anchor map.
U14-4 card-contract route packet
This page does not change the current public six-question batch. It makes only the fifth active row more explicit, so readers can see why U14-4 still stays before U14-2, why D01 Acquisition delay of wireless EEG now stays only as a gated support entry point, and what the next public-safe artifact can honestly close.
What still stays fixed after the 14:10 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 14:10 JSTaftermind-upload@cafeab4bc2a5,EEG-DATA@e0695bcac83d, andauto-research-funds@a4852d89376cstill keepsU14-4fifth and still keepsD01only as the planned gated-support disclosure floor for this row. - The newest pulled deltas remain carry-forward rather than route replacement.
mind-uploadtightens glossary excitability and ionic terms on top of the earlier EEG foundation-model source-status split without widening the route,EEG-DATAstill reports30,930merged-unique rows,28,893high-confidence rows,24,909immediate rows, and24,539high-confidence immediate rows after the newest metadata deep dives, andauto-research-fundsaddsJELA Diakoniascholarship cards without changing the practical shortlist. - None of those additions replaces the present rerun-entry structure. The newest carry-forwards do not change the fact that
D01still sets only the latency / measurement floor,D13still stays the first public-open rerun support family, andD08still stays the validation-heavy support family kept one step later. - Browser-level live checks in this run still returned
HTTP/2 200for the current public entry pages and this row packet withLast-Modified: Sat, 04 Apr 2026 04:18:04 GMT; the checked front-door pages already surfaced2026-04-04 12:02 JSTwording while this row packet still surfaced2026-04-04 09:05 JSTwording before this source sync. A fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient (items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Doumei=0,Kenkyu no Susume=0), so no new Todoist item was justified for this row in this sync.
What still stays fixed after the 09:05 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 09:05 JSTaftermind-upload@e571567f017d,EEG-DATA@fbbb0d8c01e0, andauto-research-funds@d7f6fb9bc158still keepsU14-4fifth and still keepsD01only as the planned gated-support disclosure floor for this row. - The newest pulled deltas remain carry-forward rather than route replacement.
mind-uploadnow just carries the earlier08:07 JSTroute-hold sync on top of a recent pretraining-overlap audit,EEG-DATAstill reports30,929merged-unique rows,28,892high-confidence rows,24,909immediate rows, and24,539high-confidence immediate rows after theOpenNeuro ds007020deep dive, andauto-research-fundsadds deeply reviewed April 4 scholarship updates without changing the practical shortlist. - None of those additions replaces the present rerun-entry structure. The newest carry-forwards do not change the fact that
D01still sets only the latency / measurement floor,D13still stays the first public-open rerun support family, andD08still stays the validation-heavy support family kept one step later. - Browser-level live checks in this run still returned
HTTP/2 200for the current public entry pages and this row packet withLast-Modified: Sat, 04 Apr 2026 00:11:41 GMT; the checked front-door pages already surfaced2026-04-04 08:07 JSTwording while this row packet still surfaced2026-04-04 01:04 JSTwording before this source sync. A fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient (items=206,projects=2), so no new Todoist item was justified for this row in this sync.
What still stays fixed after the 01:04 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 01:04 JSTaftermind-upload@9b6a8b971ba0,EEG-DATA@56d765da60b, andauto-research-funds@3c8569e28still keepsU14-4fifth and still keepsD01only as the planned gated-support disclosure floor for this row. - The newest pulled deltas remain carry-forward rather than route replacement.
mind-uploadnow carries the earlier00:06 JSTroute reread plus field-level artifact-stack disclosure tightening,EEG-DATAstill reports30,921merged-unique rows,28,884high-confidence rows,24,900immediate rows, and24,530high-confidence immediate rows after deepeningNumbersandPRIOS, andauto-research-fundsadds current coverage forćçèČæäŒandç ç©¶ăźăăă愚ćŠéwithout changing the practical shortlist. - None of those additions replaces the present rerun-entry structure. The newest carry-forwards do not change the fact that
D01still sets only the latency / measurement floor,D13still stays the first public-open rerun support family, andD08still stays the validation-heavy support family kept one step later. - Browser-level live checks in this run still returned
HTTP/2 200for the current public entry pages and this row packet withLast-Modified: Fri, 03 Apr 2026 21:11:06 GMT; the checked row packet still surfacedUpdated: 2026-04-02before this source sync even though the front-door pages already surfaced the2026-04-04 01:04 JSTbasis. A fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient (items=206,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Keio graduate scholarship=2,G-7=1,ENEOS=1,ćçäŒ=0,ç ç©¶ăźăăă=0), so no new Todoist item was justified for this row in this sync.
What still stays fixed after the 23:08 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 23:08 JSTaftermind-upload@f5d1d1dd1683,EEG-DATA@ee1463d28288, andauto-research-funds@ec24a355abbcstill keepsU14-4fifth and still keepsD01only as the planned gated-support disclosure floor for this row. - The newest pulled deltas remain carry-forward rather than route replacement.
mind-uploadclarifies the causal-versus-human-proxy bridge outside the current six,EEG-DATAnow reports30,896merged-unique rows,28,859high-confidence rows, and24,882directly usable rows after candidate-curation refinement plus theOpenNeuro ds007615deep dive, andauto-research-fundsaddsGeo-Kagakucurrent cards without changing the practical shortlist. - None of those additions replaces the present rerun-entry structure. The latest carry-forwards do not change the fact that
D01still sets only the latency / measurement floor,D13still stays the first public-open rerun support family, andD08still stays the validation-heavy support family kept one step later. - Browser-level live checks still returned
HTTP/2 200for the current public entry pages withLast-Modified: Thu, 02 Apr 2026 13:12:21 GMT, and a fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient, so this page only refreshes the row-specific route-hold wording.
What still stays fixed after the 12:04 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 12:04 JSTaftermind-upload@dceb8bc,EEG-DATA@04b7fda167e, andauto-research-funds@4442e348astill keepsU14-4fifth and still keepsD01only as the planned gated-support disclosure floor for this row. - The newest pulled deltas remain carry-forward rather than route replacement.
mind-uploadsyncs a spectroscopy front door outside the current six,EEG-DATAnow reports30,888merged-unique rows,28,851high-confidence rows, and24,506immediate rows afterTHINGS-EEG, an OSF orientation route, and a rat ECoG deep dive, andauto-research-fundsonly refreshes repository stats. - None of those additions replaces the present rerun-entry structure. The newest visual, auditory, and animal carry-forwards do not change the fact that
D01still sets only the latency / measurement floor,D13still stays the first public-open rerun support family, andD08still stays the validation-heavy support family kept one step later. - Browser-level live checks still returned
200for the current public entry pages withLast-Modified: Thu, 02 Apr 2026 02:37:04 GMT, and a fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient, so this page only refreshes the row-specific route-hold wording.
What was rechecked for this row
D01 Acquisition delay of wireless EEGstill fixes the intended latency-first wireless EEG measurement route, but the current IEEE DataPort page is subscription-gated and its visible package is still a latency/synchronization dataset withREADME_enplus device/run.matfiles rather than a rerun benchmark by itself.- The current funding bridge remains narrow and unchanged:
Kura Fundstays first,Nakatani Foundation research grantstays next-cycle watch, andSecom General Research Grantstays an urgency-watch route only. - The public six-question batch also stays unchanged:
U13-2 / U13-5 / U0-2 / U0-3 / U14-4 / U14-2.
Why U14-4 still stays fifth
- It is the disclosure-first row that should turn abstract reproducibility language into concrete card fields before the route asks for an operational split contract in
U14-2. - If this row fails, broader reproducibility wording should stay blocked because the route would still be missing a concrete disclosure floor.
- The row can close a narrow documentation artifact with EEG alone before any stronger standards or deployment language is attempted.
Why D01 stays in scope only as a gated support anchor
| Candidate | What it helps with | Why it is not the first public anchor |
|---|---|---|
D01 Acquisition delay of wireless EEG (10.21227/dv1p-vq18, subscription-gated support) |
It still fixes the intended latency-first measurement route, which is enough to keep the disclosure-first rerun question in scope if access is available. | The current IEEE DataPort page is subscription-gated, and the visible package is still a latency floor rather than a rerun benchmark, so it no longer counts as an immediate public anchor in this run. |
D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications (10.17632/vyczny2r4w, immediate) |
It is the first required public-open rerun family once the first card fields have been fixed on a narrower latency route. | It is better as a rerun support family than as the first bounded disclosure anchor, so it stays secondary. |
D08 Simultaneous human intracerebral stimulation and HD-EEG, ground-truth for source localization methods (10.21227/7may-9q56, immediate) |
It gives a stronger measurement-grounding example that may later help leak-audit or validation-field design. | It is too validation-heavy and not as direct a disclosure-first entry point as the current latency route, so it stays support rather than primary for U14-4. |
The public-open rerun family and the validation-heavy family should not be read as interchangeable. D13 is the first rerun-example support family this row would need next, while D08 is better kept for grounded validation-field examples after the first card contract is already fixed.
What the first artifact can honestly close now
| Artifact piece | What it closes now | What still stays outside the claim |
|---|---|---|
Filled Model Card / Dataset Card examples |
A bounded example set showing how latency, measurement, and rerun fields should be filled for the current public batch. | Any statement that card completeness alone proves field-wide reproducibility or deployment readiness. |
Disclosure-first rerun checklist |
A narrow operational checklist that links card fields to a rerun contract instead of leaving them as passive metadata. | Any claim that the checklist already functions as a broadly adopted standard. |
Latency-field mapping note |
A public-safe explanation of why latency and measurement provenance must appear as concrete contract fields. | Any theory-level conclusion that goes beyond the present EEG artifact. |
First-pass KPI bundle and stop rule
| Item | Current row-level fixation |
|---|---|
First-pass KPI bundle |
required-card fill rate, rerun success rate, leak-audit coverage |
Stop rule |
Do not widen this row if fuller cards do not improve rerun traceability or if leak-audit fields remain missing in negative-case examples. |
Funding wording that still fits
| Route | Submission wording that stays honest | Why it still fits this row |
|---|---|---|
Kura Fund |
A disclosure-first reproducibility contract package for a bounded EEG verification route toward the mind-upload hypothesis |
The row still reads as a young-researcher disclosure package rather than a solved reproducibility claim. |
Nakatani Foundation research grant (next-cycle watch) |
Card-integrated rerun documentation for a bounded EEG verification route |
The row remains plausible only as a later-cycle reproducibility package once the current closed cycle reopens. |
Secom General Research Grant (next-cycle watch only) |
Latency-aware disclosure and rerun-contract audit for EEG verification artifacts |
The March 31, 2026 12:00 JST deadline has already passed in this run, so the route remains useful only as a carried-forward watch note rather than a live planning lane. |
External dependency tasks that stay outside this session
D13-backed rerun examples are still needed before the row can support broader reproducibility wording.- Leak-audit exemplars are still needed before the route can move from disclosure discipline to stronger standards language.
- Any field-wide reproducibility, standards-adoption, or deployment-readiness interpretation remains outside the present EEG-only route.
What changed in this run
- The public batch did not change.
- The main change in this sync is that
U14-4now carries the same2026-04-04 09:05 JSTroute basis as the latest front-door reading and records that the live row packet had still been stuck at the earlier2026-04-04 01:04 JSTwording before this source update. - The row still records the anchor-choice rationale, one compact first-pass KPI bundle, and one explicit stop rule instead of leaving them implicit.
- This is still a route-setting update, not a solved-claim update.