u14 2 fixed split route - yasufumi-nakata/mind-upload GitHub Wiki

Wiki: U14-2 fixed-split route packet

A row-specific packet for the exploration-versus-confirmation rerun row

This learning page is generated for GitHub Wiki. The public portal is managed on mind-upload.com.

  • Updated: 2026-04-04 / Role: U14-2 route packet

Role Of This Page

This page fixes the current public route for U14-2 at the level of one question, one intended EEG route anchor, one bounded first artifact, and one funding bridge.

Accuracy Notes

This page does not claim broad rerun robustness or confirmatory readiness. It only records what the present EEG route can honestly close first.

Back To Public Pages

Related Wiki Pages


U14-2 fixed-split route packet

This page does not change the current public six-question batch. It makes only the sixth active row more explicit, so readers can see why U14-2 stays after U14-4, why D01 Acquisition delay of wireless EEG now stays only as a gated support entry point, and what the next public-safe artifact can honestly close.

What still stays fixed after the 14:10 JST actual-pull reread on April 4, 2026

  • An actual-pull recheck at 2026-04-04 14:10 JST after mind-upload@cafeab4bc2a5, EEG-DATA@e0695bcac83d, and auto-research-funds@a4852d89376c still keeps U14-2 sixth and still keeps D01 only as the planned gated-support split-governance floor for this row.
  • The newest pulled deltas remain carry-forward rather than route replacement. mind-upload tightens glossary excitability and ionic terms on top of the earlier EEG foundation-model source-status split without widening the route, EEG-DATA still reports 30,930 merged-unique rows, 28,893 high-confidence rows, 24,909 immediate rows, and 24,539 high-confidence immediate rows after the newest metadata deep dives, and auto-research-funds adds JELA Diakonia scholarship cards without changing the practical shortlist.
  • None of those additions replaces the present rerun-entry structure. The newest carry-forwards do not change the fact that D01 still sets only the latency / split-boundary floor, D13 still stays the first public-open rerun support family, and D08 still stays the validation-heavy support family kept one step later.
  • Browser-level live checks in this run still returned HTTP/2 200 for the current public entry pages and this row packet with Last-Modified: Sat, 04 Apr 2026 04:18:04 GMT; the checked front-door pages already surfaced 2026-04-04 12:02 JST wording while this row packet still surfaced 2026-04-04 09:05 JST wording before this source sync. A fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient (items=206, projects=2, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, Doumei=0, Kenkyu no Susume=0), so no new Todoist item was justified for this row in this sync.

What still stays fixed after the 09:05 JST actual-pull reread on April 4, 2026

  • An actual-pull recheck at 2026-04-04 09:05 JST after mind-upload@e571567f017d, EEG-DATA@fbbb0d8c01e0, and auto-research-funds@d7f6fb9bc158 still keeps U14-2 sixth and still keeps D01 only as the planned gated-support split-governance floor for this row.
  • The newest pulled deltas remain carry-forward rather than route replacement. mind-upload now just carries the earlier 08:07 JST route-hold sync on top of a recent pretraining-overlap audit, EEG-DATA still reports 30,929 merged-unique rows, 28,892 high-confidence rows, 24,909 immediate rows, and 24,539 high-confidence immediate rows after the OpenNeuro ds007020 deep dive, and auto-research-funds adds deeply reviewed April 4 scholarship updates without changing the practical shortlist.
  • None of those additions replaces the present rerun-entry structure. The newest carry-forwards do not change the fact that D01 still sets only the latency / split-boundary floor, D13 still stays the first public-open rerun support family, and D08 still stays the validation-heavy support family kept one step later.
  • Browser-level live checks in this run still returned HTTP/2 200 for the current public entry pages and this row packet with Last-Modified: Sat, 04 Apr 2026 00:11:41 GMT; the checked front-door pages already surfaced 2026-04-04 08:07 JST wording while this row packet still surfaced 2026-04-04 01:04 JST wording before this source sync. A fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient (items=206, projects=2), so no new Todoist item was justified for this row in this sync.

What still stays fixed after the 01:04 JST actual-pull reread on April 4, 2026

  • An actual-pull recheck at 2026-04-04 01:04 JST after mind-upload@9b6a8b971ba0, EEG-DATA@56d765da60b, and auto-research-funds@3c8569e28 still keeps U14-2 sixth and still keeps D01 only as the planned gated-support split-governance floor for this row.
  • The newest pulled deltas remain carry-forward rather than route replacement. mind-upload now carries the earlier 00:06 JST route reread plus field-level artifact-stack disclosure tightening, EEG-DATA still reports 30,921 merged-unique rows, 28,884 high-confidence rows, 24,900 immediate rows, and 24,530 high-confidence immediate rows after deepening Numbers and PRIOS, and auto-research-funds adds current coverage for 搌盟è‚Č成䌚 and ç ”ç©¶ăźă™ă‚ă‚ć„šć­Šé‡‘ without changing the practical shortlist.
  • None of those additions replaces the present rerun-entry structure. The newest carry-forwards do not change the fact that D01 still sets only the latency / split-boundary floor, D13 still stays the first public-open rerun support family, and D08 still stays the validation-heavy support family kept one step later.
  • Browser-level live checks in this run still returned HTTP/2 200 for the current public entry pages and this row packet with Last-Modified: Fri, 03 Apr 2026 21:11:06 GMT; the checked row packet still surfaced Updated: 2026-04-02 before this source sync even though the front-door pages already surfaced the 2026-04-04 01:04 JST basis. A fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient (items=206, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, Keio graduate scholarship=2, G-7=1, ENEOS=1, ćŒç›ŸäŒš=0, ç ”ç©¶ăźă™ă‚ă‚=0), so no new Todoist item was justified for this row in this sync.

What still stays fixed after the 23:08 JST actual-pull reread on April 2, 2026

  • An actual-pull recheck at 2026-04-02 23:08 JST after mind-upload@f5d1d1dd1683, EEG-DATA@ee1463d28288, and auto-research-funds@ec24a355abbc still keeps U14-2 sixth and still keeps D01 only as the planned gated-support split-governance floor for this row.
  • The newest pulled deltas remain carry-forward rather than route replacement. mind-upload clarifies the causal-versus-human-proxy bridge outside the current six, EEG-DATA now reports 30,896 merged-unique rows, 28,859 high-confidence rows, and 24,882 directly usable rows after candidate-curation refinement plus the OpenNeuro ds007615 deep dive, and auto-research-funds adds Geo-Kagaku current cards without changing the practical shortlist.
  • None of those additions replaces the present rerun-entry structure. The latest carry-forwards do not change the fact that D01 still sets only the latency / split-boundary floor, D13 still stays the first public-open rerun support family, and D08 still stays the validation-heavy support family kept one step later.
  • Browser-level live checks still returned HTTP/2 200 for the current public entry pages with Last-Modified: Thu, 02 Apr 2026 13:12:21 GMT, and a fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient, so this page only refreshes the row-specific route-hold wording.

What still stays fixed after the 12:04 JST actual-pull reread on April 2, 2026

  • An actual-pull recheck at 2026-04-02 12:04 JST after mind-upload@dceb8bc, EEG-DATA@04b7fda167e, and auto-research-funds@4442e348a still keeps U14-2 sixth and still keeps D01 only as the planned gated-support split-governance floor for this row.
  • The newest pulled deltas remain carry-forward rather than route replacement. mind-upload syncs a spectroscopy front door outside the current six, EEG-DATA now reports 30,888 merged-unique rows, 28,851 high-confidence rows, and 24,506 immediate rows after THINGS-EEG, an OSF orientation route, and a rat ECoG deep dive, and auto-research-funds only refreshes repository stats.
  • None of those additions replaces the present rerun-entry structure. The newest visual, auditory, and animal carry-forwards do not change the fact that D01 still sets only the latency / split-boundary floor, D13 still stays the first public-open rerun support family, and D08 still stays the validation-heavy support family kept one step later.
  • Browser-level live checks still returned 200 for the current public entry pages with Last-Modified: Thu, 02 Apr 2026 02:37:04 GMT, and a fresh read-only Todoist audit still showed the existing funding-task coverage as sufficient, so this page only refreshes the row-specific route-hold wording.

What was rechecked for this row

  • D01 Acquisition delay of wireless EEG still fixes the intended latency-first measurement route, but the current IEEE DataPort page is subscription-gated and its visible package is still a delay/synchronization dataset with README_en plus device/run .mat files rather than a rerun family by itself.
  • The current funding bridge remains narrow and unchanged: Kura Fund stays first, Nakatani Foundation research grant stays next-cycle watch, and Secom General Research Grant stays an urgency-watch route only.
  • The public six-question batch also stays unchanged: U13-2 / U13-5 / U0-2 / U0-3 / U14-4 / U14-2.

Why U14-2 still stays sixth

  • It is the operational rerun-governance row that should come only after U14-4 has already made the disclosure fields concrete.
  • If this row fails, broader confirmatory-readiness wording should stay blocked because the route would still be missing a measurable split boundary.
  • The row can close a narrow contract artifact with EEG alone before any stronger rerun-robustness language is attempted.

Why D01 stays in scope only as a gated support anchor

Candidate What it helps with Why it is not the first public anchor
D01 Acquisition delay of wireless EEG (10.21227/dv1p-vq18, subscription-gated support) It still fixes the intended latency-first split boundary, which is enough to keep the exploration vs confirmation question in scope if access is available. The current IEEE DataPort page is subscription-gated, and the visible package is still a latency floor rather than a rerun family, so it no longer counts as an immediate public anchor in this run.
D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications (10.17632/vyczny2r4w, immediate) It is the first required public-open support family for richer split-violation examples and a broader rerun family once the first contract has been fixed. It is better as a rerun support family than as the first bounded split anchor, so it stays secondary.
D08 Simultaneous human intracerebral stimulation and HD-EEG, ground-truth for source localization methods (10.21227/7may-9q56, immediate) It gives a stronger validation-style benchmark that may later support more explicit negative-case and rerun-audit examples. It is too validation-heavy and not as direct a split-governance entry point as the current latency route, so it stays support rather than primary for U14-2.

The public-open rerun family and the validation-heavy family should not be read as interchangeable here either. D13 is the first split-violation example family this row would need next, while D08 is better kept for stronger validation-style failure trails after the first fixed-split contract is already frozen.

What the first artifact can honestly close now

Artifact piece What it closes now What still stays outside the claim
Fixed-split rerun contract A bounded rule for freezing the split between exploratory and confirmatory outputs on the current public route. Any statement that the route already supports broad confirmatory readiness or rerun robustness.
Negative-case trail A narrow record of what happens when the split rule is violated or the rerun fails to hold under the fixed contract. Any claim that a few logged failures already generalize into a field-wide rerun policy.
Split-violation checklist A public-safe checklist for what evidence must be logged when exploratory outputs are kept outside confirmatory wording. Any theory-level conclusion that goes beyond the present EEG artifact.

First-pass KPI bundle and stop rule

Item Current row-level fixation
First-pass KPI bundle fixed-split compliance rate, rerun success rate, explore-to-confirm carryover gap
Stop rule Do not widen this row if split violations remain necessary to preserve the result or if the explore-to-confirm carryover gap collapses on rerun.

Funding wording that still fits

Route Submission wording that stays honest Why it still fits this row
Kura Fund A fixed-split rerun contract for a bounded EEG verification route toward the mind-upload hypothesis The row still reads as a young-researcher rerun-discipline package rather than a solved reproducibility claim.
Nakatani Foundation research grant (next-cycle watch) Exploration-versus-confirmation contract design for bounded EEG reruns The row remains plausible only as a later-cycle reproducibility package once the current closed cycle reopens.
Secom General Research Grant (next-cycle watch only) Latency-aware fixed-split and failure-trail auditing for EEG reruns The March 31, 2026 12:00 JST deadline has already passed in this run, so the route remains useful only as a carried-forward watch note rather than a live planning lane.

External dependency tasks that stay outside this session

  • D13-backed split-violation examples across richer public benchmarks are still needed before the row can support broader rerun wording.
  • A broader rerun family is still needed before the route can claim stronger confirmatory readiness.
  • Any broad rerun-robustness or confirmatory-readiness interpretation remains outside the present EEG-only route.

What changed in this run

  • The public batch did not change.
  • The main change in this sync is that U14-2 now carries the same 2026-04-04 09:05 JST route basis as the latest front-door reading and records that the live row packet had still been stuck at the earlier 2026-04-04 01:04 JST wording before this source update.
  • The row still records the anchor-choice rationale, one compact first-pass KPI bundle, and one explicit stop rule instead of leaving them implicit.
  • This is still a route-setting update, not a solved-claim update.