mind upload rq solvability bridge - yasufumi-nakata/mind-upload GitHub Wiki
Mind-upload RQ Solvability Bridge
One question, one anchor family, one funding lane, one stop line
This learning page is generated for GitHub Wiki. The public portal is managed on mind-upload.com.
- Updated: 2026-04-04 / Role: Current RQ-to-EEG-and-funding bridge
Role Of This Page
This page fixes the current deepening queue and the next-watch queue at the level of one research question, one EEG-DATA anchor family, one honest funding theme, and one explicit external-dependency boundary.
Accuracy Notes
This is not a solved-claim update. It records only bounded artifacts that can honestly be closed now under current public-open or gated-support anchors.
Back To Public Pages
Related Wiki Pages
- Wiki: Current public six route brief - The compact public-facing route for the six rows currently being deepened.
- Wiki: RQ60 EEG feasibility page - The wider 60RQ judgment page.
- Wiki: Grant and dataset playbook - The row-by-row route from RQ to dataset anchor and funding lane.
- Wiki: RQ-by-RQ deep dossiers - The longer working dossiers for one-RQ-at-a-time execution.
- Wiki: U7-1 route packet - The cleanest public-open A-tier synchronization packet outside the current six.
- Wiki: U7-2 route packet - The adjacent timing-metric packet that turns the same synchronization family into explicit release-block thresholds without changing the headline queue.
- Wiki: U1-2 route packet - The next narrow inverse-estimation uncertainty packet outside the current six.
- Wiki: U4-2 route packet - The current minimal causal-intervention packet outside the current six.
- Wiki: U8-1 route packet - The current bounded closed-loop delay-tolerance packet outside the current six.
Mind-upload RQ Solvability Bridge
This page answers one narrow question: for the rows that are actually worth deepening now, what can EEG-DATA honestly close, what still needs outside support, and what funding theme still fits without overstating the claim.
It does not try to re-scan all 60RQ items at once. The working style on this site is now deepen one row at a time, not summarize everything at the same depth.
What still stays fixed after the 17:07 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 17:07 JSTaftermind-upload@dc8ec5dc5e62,EEG-DATA@f115f11c2da4, andauto-research-funds@8d0f5128fcdcstill leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement:
mind-uploadsplits barrier-side human-proxy roles outside the current six without widening the route,EEG-DATAdeepens theEEGIS imagined speechmetadata while still keeping30,930merged-unique rows,28,893high-confidence rows, and24,909immediately usable rows in the current README snapshot, andauto-research-fundsadds theUehiro ethics foundationlegacy sync while now reporting8,616aid IDs,4,319rows, and3,971official-source rows without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow:
D10remains the only clear public-open primary anchor, whileD03 / D02 / D01still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement: the barrier-role split tightens outside-current-six human-proxy discipline, the newest imagined-speech metadata deepening improves speech-side support-space navigation, and the legacy-funding sync improves adjacent runway context, but none of them repairs the recall-validity gap under
U13-5, replaces the cross-session identity-drift floor underU0-2 / U0-3, or displaces the currentD11 / D08 / D05 / D20next-watch family. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Sat, 04 Apr 2026 07:12:56 GMT, and the checked bodies still surfaced2026-04-04 14:10 JSTwording across all five checked pages before this source sync. - Official-window spot checks keep the same practical bridge:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipstill stays the2026-04-09must-arrive side route,Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,JSM=0,Doumei=0,Kenkyu no Susume=0), so no new task was added in this session. - This source sync still does not widen the current queue or claim surface. It only carries forward the same queue while aligning the front door, the bridge, the playbook, and the first-row packet to the same bounded
17:07 JSTbasis.
What still stays fixed after the 14:10 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 14:10 JSTaftermind-upload@cafeab4bc2a5,EEG-DATA@e0695bcac83d, andauto-research-funds@a4852d89376cstill leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement:
mind-uploadtightens glossary excitability and ionic terms on top of the earlier EEG foundation-model source-status split without widening the route,EEG-DATAdeepensneuroTUM Cybathlon,Zenodo TSA v7.8, andpoetry EEGmetadata while still keeping30,930merged-unique rows,28,893high-confidence rows,24,909immediate rows, and24,539high-confidence immediate rows, andauto-research-fundsaddsJELA Diakoniascholarship cards without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow:
D10remains the only clear public-open primary anchor, whileD03 / D02 / D01still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement: the glossary and source-status tightening improve front-door discipline, the newest EEG metadata deep dives improve support-space navigation, and the new adjacent scholarship cards keep runway context readable, but none of them repairs the recall-validity gap under
U13-5, replaces the cross-session identity-drift floor underU0-2 / U0-3, or displaces the currentD11 / D08 / D05 / D20next-watch family. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html, and the current-six row packets; the checked headers now returnLast-Modified: Sat, 04 Apr 2026 04:18:04 GMT, and the checked bodies still surfaced2026-04-04 12:02 JSTwording on the front door plus2026-04-04 09:05 JSTon the older current-six row packets before this source sync. - Official-window spot checks keep the same practical bridge:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipstill reads as the annualmid-January to early-Aprilwindow and continues to be handled as the2026-04-09must-arrive side route,Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Doumei=0,Kenkyu no Susume=0), so no new task was added in this session. - This source sync still does not widen the current queue or claim surface. It only carries forward the same queue while aligning the front door, playbook, and the entire current-six row packet set to the same bounded
14:10 JSTbasis.
What still stays fixed after the 12:02 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 12:02 JSTaftermind-upload@f84f6e53753b,EEG-DATA@017ae806c4dd, andauto-research-funds@d4024a5b8a1astill leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement:
mind-uploadsynchronizes the EEG recording-frame contract across public pages without widening the route,EEG-DATAdeep-dives capacity-for-movement EEG datasets while still keeping30,929merged-unique rows,28,892high-confidence rows,24,908immediate rows, and24,538high-confidence immediate rows, andauto-research-fundsstill just carries the earlier11:04 JSTfunding addendum without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow:
D10remains the only clear public-open primary anchor, whileD03 / D02 / D01still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement: the recording-frame tightening improves front-door technical discipline, the movement-capacity deep dive improves support-space navigation, and the funding carry-forward keeps the shortlist readable, but none of them repairs the recall-validity gap under
U13-5, replaces the cross-session identity-drift floor underU0-2 / U0-3, or displaces the currentD11 / D08 / D05 / D20next-watch family. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Sat, 04 Apr 2026 02:19:09 GMT, and the checked bodies already surfaced2026-04-04 11:04 JSTwording onissue / brief / bridge / playbookwhileu13-2-brain-minus-prior-route.htmlstill surfaced2026-04-04 09:05 JSTwording before this source sync. - Official-window spot checks keep the same practical bridge:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipstill reads as the annualmid-January to early-Aprilwindow and continues to be handled as the2026-04-09must-arrive side route,Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Doumei=0,Kenkyu no Susume=0), so no new task was added in this session. - This source sync still does not widen the current queue or claim surface. It only carries forward the same queue while aligning the front door, playbook, and the first-row packet to the same bounded
12:02 JSTbasis.
What still stays fixed after the 11:04 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 11:04 JSTaftermind-upload@812e1650bae1,EEG-DATA@1deac45c75a2, andauto-research-funds@9741ee45a025still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement:
mind-uploadtightens glossary bridge-witness terminology without widening the route,EEG-DATAcollapses duplicate EEG-fMRI override rows and now keeps30,929merged-unique rows,28,892high-confidence rows,24,908immediate rows, and24,538high-confidence immediate rows while leaving the currentD10 / D03 / D02 / D01family unchanged, andauto-research-fundsadds legacy coverage for current-cycle funding cards without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow:
D10remains the only clear public-open primary anchor, whileD03 / D02 / D01still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement: the duplicate-override cleanup improves inventory hygiene, the glossary tightening improves front-door reading discipline, and the legacy-card expansion improves funding context, but none of them repairs the recall-validity gap under
U13-5, replaces the cross-session identity-drift floor underU0-2 / U0-3, or displaces the currentD11 / D08 / D05 / D20next-watch family. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Sat, 04 Apr 2026 01:14:45 GMT, and the checked bodies still surfaced2026-04-04 09:05 JSTwording before this source sync. - Official-window spot checks keep the same practical bridge:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipstill reads as the annualmid-January to early-Aprilwindow and continues to be handled as the2026-04-09must-arrive side route,Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2), so no new task was added in this session. - This source sync still does not widen the current queue or claim surface. It only carries forward the same queue while adding a bounded
11:04 JSTfront-door and playbook sync.
What still stays fixed after the 09:05 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 09:05 JSTaftermind-upload@e571567f017d,EEG-DATA@fbbb0d8c01e0, andauto-research-funds@d7f6fb9bc158still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement:
mind-uploadnow just carries the earlier08:07 JSTroute-hold sync on top of a recent pretraining-overlap audit,EEG-DATAstill keeps30,929merged-unique rows,28,892high-confidence rows,24,909immediate rows, and24,539high-confidence immediate rows while treatingOpenNeuro ds007020as a limited rest-side support note and keepingHeartBEAMplus figshareEEG at rest and with TMSonly as backup families, andauto-research-fundsadds deeply reviewed April 4 scholarship updates while still keepingJGC-Sonly as an adjacent runway without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow:
D10remains the only clear public-open primary anchor, whileD03 / D02 / D01still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement:
OpenNeuro ds007020stays a limited rest-side note,HeartBEAMstays a stronger backup/watch candidate, and figshareEEG at rest and with TMSstays a narrow perturbation backup, but none of them repairs the recall-validity gap underU13-5, replaces the cross-session identity-drift floor underU0-2 / U0-3, or displaces the currentD11 / D08 / D05 / D20next-watch family. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html, and the current-six row packets; the checked front-door headers now returnLast-Modified: Fri, 03 Apr 2026 23:18:55 GMT, and the checked bodies already surfaced2026-04-04 08:07 JSTwording. The current-six row packets returnedLast-Modified: Sat, 04 Apr 2026 00:11:41 GMTand still surfaced2026-04-04 01:04 JSTwording before this source sync. - Official-window spot checks keep the same practical bridge:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipstill reads as the annualmid-January to early-Aprilwindow and continues to be handled as the2026-04-09must-arrive side route,Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2), so no new task was added in this session. - This source sync still does not widen the current queue or claim surface. It only carries forward the same queue while aligning the current-six row packets to the already-published front door.
What still stays fixed after the 08:07 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 08:07 JSTaftermind-upload@418c8f5d0ef9,EEG-DATA@dc6d833b83e9, andauto-research-funds@58d8738be5d5still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement:
mind-uploadtightens the front-door human-proxy comparison,EEG-DATAstill keeps30,929merged-unique rows,28,892high-confidence rows,24,909immediate rows, and24,539high-confidence immediate rows while promotingHeartBEAMand figshareEEG at rest and with TMSonly as backup families, andauto-research-fundsadds theJGC-Sforeign-student scholarship only as an adjacent runway without displacing the practical shortlist. - The route-safe reading also stays deliberately narrow:
D10remains the only clear public-open primary anchor, whileD03 / D02 / D01still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement:
HeartBEAMis useful as a stronger backup/watch candidate, but it still does not repair the recall-validity gap underU13-5, replace the cross-session identity-drift floor underU0-2 / U0-3, or displace the currentD11 / D08 / D05 / D20next-watch family. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,u13-2-brain-minus-prior-route.html, andu13-5-perception-to-recall-route.html; the checked headers now returnLast-Modified: Fri, 03 Apr 2026 22:10:18 GMT, while the checked bodies still surfaced the earlier2026-04-04 01:04 JSTwording before this source sync. - Official-window spot checks keep the same practical bridge:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipstill reads as the annualmid-January to early-Aprilwindow and continues to be handled as the2026-04-09must-arrive side route,Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Keio graduate scholarship=2,G-7=1,ENEOS=1,Doumei=0,Kenkyu no Susume=0), so no new task was added in this session.
What still stays fixed after the 01:04 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 01:04 JSTaftermind-upload@9b6a8b971ba0,EEG-DATA@56d765da60b, andauto-research-funds@3c8569e28still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas remain carry-forward rather than route replacement:
mind-uploadnow carries the earlier00:06 JSTroute reread plus field-level artifact-stack disclosure tightening,EEG-DATAdeepens the public OpenNeuro metadata forNumbersandPRIOSwhile still keeping30,921merged-unique rows,28,884high-confidence rows,24,900immediate rows, and24,530high-confidence immediate rows, andauto-research-fundsadds current coverage forćçèČæäŒandç ç©¶ăźăăă愚ćŠéwithout displacing the practical shortlist. - The route-safe reading also stays deliberately narrow:
D10remains the only clear public-open primary anchor, whileD03 / D02 / D01still stay gated-support anchors in public wording because no newest pulled head turns those three routes into immediate public anchors. - The newest repo-wide carry-forward still does not create a stronger row-level replacement:
NumbersandPRIOSimprove support-space specificity, but they do not repair the recall-validity gap underU13-5, replace the cross-session identity-drift floor underU0-2 / U0-3, or displace the currentD11 / D08 / D05 / D20next-watch family. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,u13-2-brain-minus-prior-route.html, andu13-5-perception-to-recall-route.html; the checked headers now returnLast-Modified: Fri, 03 Apr 2026 15:13:06 GMT, while the checked bodies still surfaced the earlier2026-04-04 00:06 JSTwording before this source sync. - Official-window spot checks keep the same practical bridge:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive),Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Keio graduate scholarship=2,G-7=1,ENEOS=1,ćçäŒ=0,ç ç©¶ăźăăă=0), so no new task was added in this session.
What still stays fixed after the 00:06 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 00:06 JSTaftermind-upload@84d84fb5a82d,EEG-DATA@b468ecc5f8c0, andauto-research-funds@eccee095a939still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadnow just carries the earlier23:06 JSTroute reread addenda,EEG-DATAaddsfast mapping semantic integration EEG datasetwhilesummary.jsonnow reports30,921merged-unique rows,28,884high-confidence rows,24,900immediate rows, and24,530high-confidence immediate rows, andauto-research-fundsaddsIizuka current card and Korean legacy syncwithout replacing the currentD10 / D03 / D02 / D01family or the headline next-watchD11 / D08 / D05 / D20family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns
D03 / D02 / D01into immediate public anchors, so public-safe wording still keepsD10as the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks before this source sync still returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html,u13-2-brain-minus-prior-route.html, andu13-5-perception-to-recall-route.html; the checked bodies still surfaced22:04 JSTonbrief / bridge / U13-2and22:04/22:05 JSTonissuerather than a new queue or claim. - Official window spot checks in this run still keep the practical bridge narrow:
Kura Fundremains open (2026-02-02 - 2026-04-17 17:00),Nakatani Foundation graduate scholarshipremains open (2026-04-01 - 2026-05-25 15:00),Kashinome Scholarshipstays a student-runway side route (2026-01-14 - 2026-04-09 must arrive),Nakatani Foundation research grantremains closed / next-cycle watch, andSecom General Research Grantremains closed for the current cycle (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Keio graduate scholarship=2,G-7=1,ENEOS=1), so no new task was added in this session. - This source sync still does not widen the current queue or claim surface. It only carries forward the same queue onto the actual latest pulled heads, the latest live public bodies, official windows, and Todoist sufficiency check.
What still stays fixed after the 23:06 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 23:06 JSTaftermind-upload@ec7a7dd713e9,EEG-DATA@46f6b56c693c, andauto-research-funds@b3d3c531729astill leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadnow just carries the earlier22:04 JSTroute-hold sync,EEG-DATAaddsmotion sicknessandswallowing EEGdatasets whilesummary.jsonnow reports30,920merged-unique rows,28,883high-confidence rows,24,899immediate rows, and24,529high-confidence immediate rows, andauto-research-fundsdeepensKIRII / Pigeon / Nakato / Takashimascholarship coverage plus a22:04 JSTfunding addendum without replacing the currentD10 / D03 / D02 / D01family or the headline next-watchD11 / D08 / D05 / D20family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns
D03 / D02 / D01into immediate public anchors, so public-safe wording still keepsD10as the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks in this run returned
HTTP/2 200formind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html, and the current-six row packets; the checked headers now returnLast-Modified: Fri, 03 Apr 2026 13:18:48 GMT, the front-door pages plusU13-2already surfaced22:04 JST, and the other five row packets still surfaced the earlier2026-04-02 / 23:08 JSThold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow:
Kura Fundremains open (2026-02-02 - 2026-04-17 17:00),Nakatani Foundation graduate scholarshipremains open (2026-04-01 - 2026-05-25 15:00),Kashinome Scholarshipstays a student-runway side route (2026-01-14 - 2026-04-09 must arrive),Nakatani Foundation research grantremains closed / next-cycle watch, andSecom General Research Grantremains closed for the current cycle (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Keio graduate scholarship=2,G-7=1,ENEOS=1), so no new task was added in this session. - This source sync still does not widen the current queue or claim surface. It only carries forward the same queue onto the actual latest pulled heads, live row packets, official windows, and Todoist sufficiency check.
What still stays fixed after the 22:04 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 22:04 JSTaftermind-upload@1ab35b64796f3936e525befb5d9428d789a16263,EEG-DATA@be3d03d1c286dcd37fb056317a693e47c39f7f3a, andauto-research-funds@845e6849a6c36e6e83394e32cf8dc4b5fe6fdc07still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled delta is now concentrated in
EEG-DATA:summary.jsonreports30,918merged-unique rows,28,881high-confidence rows,24,898immediate rows, and24,528high-confidence immediate rows after the latest exhaustive refresh, whilemind-uploadandauto-research-fundsnow just carry their earlier21:05 JSTaddenda without replacing the currentD10 / D03 / D02 / D01family or the headline next-watchD11 / D08 / D05 / D20family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns
D03 / D02 / D01into immediate public anchors, so public-safe wording still keepsD10as the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Fri, 03 Apr 2026 12:24:26 GMT, while the checked bodies already surfaced21:05 JSTonissue / brief / bridgeand21:05 JSTplus11:07 JSTonU13-2before this source sync. - Official window spot checks in this run still keep the practical bridge narrow:
Kura Fundremains open (2026-02-02 - 2026-04-17 17:00),Nakatani Foundation graduate scholarshipremains open (2026-04-01 - 2026-05-25 15:00), and the rest of the watch/closed reading stays unchanged from the21:05 JSTreread. - A fresh read-only Todoist
api/v1/sync(items, projects)audit still showed enough route coverage (items=205,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Keio graduate scholarship=2,G-7=1,ENEOS=0), so no new task was added in this session. - This source sync still does not widen the current queue or claim surface. It only carries forward the same queue onto the actual latest pulled heads, live public headers, official windows, and Todoist sufficiency check.
What still stays fixed after the 21:05 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 21:05 JSTaftermind-upload@3db1aa653b74d164c3a57b75677e345ea10356e0,EEG-DATA@c10c95274ecf1397768eb28de48aac8ce925c22d, andauto-research-funds@4a67e06b530bc742521f80fa5b13ccbe1115ebb9still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadnow just carries the20:05 JSTroute-hold addendum,EEG-DATAadds BDSP manual deep dives for missing EEG datasets while now reporting30,914merged-unique rows,28,877high-confidence rows,24,896immediate rows, and24,526high-confidence immediate rows, andauto-research-fundsnow just carries the20:05 JSTfunding addendum without replacing the currentD10 / D03 / D02 / D01family or the headline next-watchD11 / D08 / D05 / D20family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns
D03 / D02 / D01into immediate public anchors, so public-safe wording still keepsD10as the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Fri, 03 Apr 2026 11:17:44 GMT, while the checked bodies already surfaced the earlier20:05 JSThold note onissue / brief / bridgeand11:07 JSTonU13-2before this source sync. - Official window spot checks in this run still keep the practical bridge narrow:
Kura Fundremains open (2026-02-02 - 2026-04-17 17:00),Nakatani Foundation graduate scholarshipremains open (2026-04-01 - 2026-05-25 15:00),Kashinome Scholarshipstays a student-runway side route (2026-01-14 - 2026-04-09 must arrive),Nakatani Foundation research grantremains closed / next-cycle watch (ćéăç”äșăăŸăăon the current public page), andSecom General Research Grantremains closed for the current cycle (2026-03-31 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)audit still showed enough route coverage (items=205,projects=2,Nakatani family=11,G-7=1,ENEOS=0,Keio graduate scholarship=2), so no new task was added in this session. - This source sync still does not widen the current queue or claim surface. It only carries forward the same queue onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check.
What still stays fixed after the 20:05 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 20:05 JSTaftermind-upload@b4fd73d9e98301c918b57541704a95246d69ae09,EEG-DATA@649ff098ab577f11065562379150acea1aa07002, andauto-research-funds@7c1b835d1d138214f282dc85d2f06d9faa522310still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still deepen support space rather than widen the present bridge:
mind-uploadnow splits human thermal evidence outside the current six intopassive / task-linked macro thermometryandperturbation-conditioned thermal routes,EEG-DATAadds a restrictedTranscranial Magnetic Stimulation in Alzheimer's disease-DataBDSP deep dive while now reporting30,912merged-unique rows,28,875high-confidence rows, and24,894directly usable rows, andauto-research-fundscompletes current-card coverage forENEOSandG-7scholarships while still reporting8,600aid IDs,4,308rows, and3,959official-source rows without replacing the currentD10 / D03 / D02 / D01family or the headline next-watchD11 / D08 / D05 / D20family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns
D03 / D02 / D01into immediate public anchors, so public-safe wording still keepsD10as the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Fri, 03 Apr 2026 10:19:46 GMT, while the checked bodies still surfaced the earlier11:05/11:07 JSThold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow:
Kura Fundremains open (2026-02-02 - 2026-04-17 17:00),Nakatani Foundation graduate scholarshipremains open (2026-04-01 - 2026-05-25 15:00),Kashinome Scholarshipstays a student-runway side route (2026-01-14 - 2026-04-09 must arrive),Nakatani Foundation research grantremains closed / next-cycle watch (ćéăç”äșăăŸăăon the current public page), andSecom General Research Grantremains closed for the current cycle (2026-03-31 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)audit still showed enough route coverage (items=205,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1), so no new task was added in this session. - This source sync does not widen the current queue or claim surface. It only carries forward the same queue onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check.
What still stays fixed after the 11:05 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 11:05 JSTaftermind-upload@f70432e4a6c8a52afafbc57b98c8f0e360c85d4e,EEG-DATA@1981d34c5f71deceb2549684db9173b6f54d2b89, andauto-research-funds@bfebe94da875d709756746285f133ef30905fd38still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still tighten support space rather than widen the present bridge:
mind-uploadnow tightenssleep replay integrity / physiology-gatewording outside the current six,EEG-DATArefreshes its inventory and deep-dives theCOG-BCIfamily while now reporting30,904merged-unique rows,28,867high-confidence rows, and24,890directly usable rows, andauto-research-fundscarries forward the10:06 JST mind-upload funding addendumwhile now reporting8,596aid IDs,4,308rows, and3,958official-source rows without replacing the currentD10 / D03 / D02 / D01family or the headline next-watchD11 / D08 / D05 / D20family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns
D03 / D02 / D01into immediate public anchors, so public-safe wording still keepsD10as the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Fri, 03 Apr 2026 01:31:28 GMT, while the checked bodies still surfaced the earlier05:12 JSThold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow:
Kura Fundremains open (2026-02-02 - 2026-04-17 17:00),Nakatani Foundation graduate scholarshipremains open (2026-04-01 - 2026-05-25 15:00),Kashinome Scholarshipstays a student-runway side route (2026-01-14 - 2026-04-09 must arrive),Nakatani Foundation research grantremains closed / next-cycle watch (ćéăç”äșăăŸăăon the current public page), andSecom General Research Grantremains closed for the current cycle (2026-03-31 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync does not widen the current queue or claim surface. It only carries forward the same queue onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check.
What still stays fixed after the 05:12 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 05:12 JSTaftermind-upload@a9fc5d1cb691f3669c40803604e78cf87fab4eed,EEG-DATA@8c3ace28bad0b3bac259caa440994e5d05bfc7d1, andauto-research-funds@35756f8381c47daa24bb70bb7a1ff88d1dcf76bcstill leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still tighten support space rather than widen the present bridge:
mind-uploadis now at adocs: sync github wiki exporthead that keeps the exported route mirrors aligned without changing the active queue,EEG-DATAcarries forward aVR navigation datasetoutput refresh on top of a recentEESM17metadata deepening while still keeping30,900merged-unique rows,28,863high-confidence rows, and24,885directly usable rows, andauto-research-fundsaddsJSPS overseas fellowcurrent-card snapshots on top of a recentJSSF research publicationrefresh while now reporting8,594aid IDs,4,307rows, and3,957official-source rows without replacing the currentD10 / D03 / D02 / D01family or the headline next-watchD11 / D08 / D05 / D20family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns
D03 / D02 / D01into immediate public anchors, so public-safe wording still keepsD10as the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Thu, 02 Apr 2026 19:17:56 GMT, while the checked bodies still surfaced the earlier04:05/04:06 JSThold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow:
Kura Fundremains open (2026-02-02 - 2026-04-17 17:00),Nakatani Foundation graduate scholarshipremains open (2026-04-01 - 2026-05-25 15:00),Kashinome Scholarshipstays a student-runway side route (2026-01-14 - 2026-04-09 must arrive),Nakatani Foundation research grantremains closed / next-cycle watch (ćéăç”äșăăŸăăon the current public page), andSecom General Research Grantremains closed for the current cycle (2026-03-31 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync does not widen the current queue or claim surface. It only carries forward the same queue onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check.
What still stays fixed after the 04:06 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 04:06 JSTaftermind-upload@f5e13ebdc4748ce683d905c37cabfdb3c53036bb,EEG-DATA@53f5c8166faf0d5fcebfb5c39741d4992eb82a39, andauto-research-funds@1f190fec93a9180a27443b1fe2b31f9488dfbf74still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still tighten support space rather than widen the present bridge:
mind-uploadcarries forward theBCSFB / human-proxy compositionliterature sync outside the current six,EEG-DATAkeeps30,900merged-unique rows,28,863high-confidence rows, and24,885directly usable rows after a catalog refresh that does not replace any current anchor family, andauto-research-fundsrefreshes current-card and registry layers aroundItoh domestic scholarshipwhile now reporting8,593aid IDs,4,306rows, and3,956official-source rows without replacing the currentD10 / D03 / D02 / D01family or the headline next-watchD11 / D08 / D05 / D20family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns
D03 / D02 / D01into immediate public anchors, so public-safe wording still keepsD10as the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Thu, 02 Apr 2026 18:14:39 GMT. - Official window spot checks in this run still keep the practical bridge narrow:
Kura Fundremains open (2026-02-02 - 2026-04-17 17:00),Nakatani Foundation graduate scholarshipremains open (2026-04-01 - 2026-05-25 15:00),Kashinome Scholarshipstays a student-runway side route (2026-01-14 - 2026-04-09 must arrive),Nakatani Foundation research grantremains closed / next-cycle watch (ćéăç”äșăăŸăăon the current public page), andSecom General Research Grantremains closed for the current cycle (2026-03-31 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync does not widen the current queue or claim surface. It only carries forward the same queue onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check.
What still stays fixed after the 23:08 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 23:08 JSTaftermind-upload@f5d1d1dd1683,EEG-DATA@ee1463d28288, andauto-research-funds@ec24a355abbcstill leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still deepen route discipline and support space rather than widen the present bridge:
mind-uploadclarifies the causal-versus-human-proxy bridge and local-route/proxy boundaries outside the current six,EEG-DATArefines EEG candidate curation and addsOpenNeuro ds007615while now reporting30,896merged-unique rows,28,859high-confidence rows, and24,882directly usable rows in the current README snapshot, andauto-research-fundsaddsGeo-Kagakucurrent cards plus a README-stat refresh without replacing the currentD10 / D03 / D02 / D01family or the headline next-watchD11 / D08 / D05 / D20family. - Route-safe access wording therefore still stays unchanged: no newest pulled head turns
D03 / D02 / D01into immediate public anchors, so public-safe wording still keepsD10as the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Thu, 02 Apr 2026 13:12:21 GMT. - Official window spot checks in this run still keep the practical bridge narrow:
Kura Fundremains open (2026-02-02 - 2026-04-17 17:00),Nakatani Foundation graduate scholarshipremains open (2026-04-01 - 2026-05-25 15:00),Nakatani Foundation research grantremains closed / next-cycle watch (ćéæé 2025-06-01 - 2025-07-07), andSecom General Research Grantremains closed for the current cycle (2026-03-31 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync does not widen the current queue or claim surface. It only carries forward the same queue onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check.
What still stays fixed after the 19:03 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 19:03 JSTaftermind-upload@e1a7e7e2f22c,EEG-DATA@a7f9390492fd, andauto-research-funds@00cdbaa9a122still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still deepen support rather than widen the present bridge:
mind-uploadnow deepens theblood-CSF barrier / choroid-plexusroute split on human neurovascular pages outside the current six,EEG-DATAstill reports30,892merged-unique rows,28,855high-confidence rows, and24,880directly usable rows in the current README snapshot, andauto-research-fundsstill keeps its latest summary at8,590aid IDs,4,301rows, and3,951official-source rows without replacing the currentD10 / D03 / D02 / D01family or the headline next-watchD11 / D08 / D05 / D20family. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors because a direct live-access reread still showsSubscription RequiredplusLOGIN TO ACCESS DATASET FILESon the currentIEEE DataPortpages for those three support anchors. - Browser-level live checks before this source sync returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu7-2-timing-metric-route.html; those checked pages returnedLast-Modified: Thu, 02 Apr 2026 09:37:54 GMT, but their route-facing body wording still surfaced the earlier18:06 JSThold note. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive),Secom General Research Grant = closed (March 31, 2026 at 12:00 JST), andNakatani Foundation research grant = closed / next-cycle watch. - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync does not widen the current queue or claim surface. It only carries forward the same queue onto the latest repo heads, live public headers, official windows, and Todoist sufficiency check while updating the route-hold wording to the latest pulled heads.
What still stays fixed after the 18:06 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 18:06 JSTaftermind-upload@85b6603b569b,EEG-DATA@a7f9390492fd, andauto-research-funds@b6c0d0f4eeb7still leaves both the current public six and the headline next-watch queue unchanged. - The newest pulled deltas still deepen support rather than widen the present bridge:
mind-uploadonly syncsU7-2public bridge wording,EEG-DATAdeep-divesOSF gazx2confidence EEG metadata andOpenNeuro ds007081while now reporting30,892merged-unique rows,28,855high-confidence rows, and24,880directly usable rows in the current README snapshot, andauto-research-fundsrefreshes its README summary to8,590aid IDs,4,301rows, and3,951official-source rows without replacing the currentD10 / D03 / D02 / D01family or the headline next-watchD11 / D08 / D05 / D20family. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors because a direct live-access reread still showsSubscription RequiredplusLOGIN TO ACCESS DATASET FILESon the currentIEEE DataPortpages for those three support anchors. - Browser-level live checks before this source sync returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu7-2-timing-metric-route.html; those checked pages returnedLast-Modified: Thu, 02 Apr 2026 08:22:50 GMT. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive),Secom General Research Grant = closed (March 31, 2026 at 12:00 JST), andNakatani Foundation research grant = closed / next-cycle watch. - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync does not widen the current queue or claim surface. It only carries forward the same queue onto the latest repo heads, live public headers, official windows, and Todoist sufficiency check.
What still stays fixed after the 11:05 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 11:05 JSTaftermind-upload@208e59e2180c,EEG-DATA@00d85380f3fd, andauto-research-funds@f4ba35518400still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge:
mind-uploadrefreshes the 10:07 route-hold packets,EEG-DATAdeep-dives the maintainedChineseEEG-2release plus the publicauditory-eegfamily while still reporting30,887merged-unique rows,28,850high-confidence rows, and24,875immediately usable rows, andauto-research-fundskeeps the same practical shortlist without replacing the currentD10 / D03 / D02 / D01family or the next-watchD11 / D08 / D05 / D20family. The speech-side public-open backup ladder is now clearer, but it still does not replaceD10or fix the recall-validity gap that keepsU13-5bounded. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors because a direct live-access reread still showsSubscription RequiredplusLOGIN TO ACCESS DATASET FILESon those threeIEEE DataPortpages. - Browser-level live checks in this run returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages returnedLast-Modified: Thu, 02 Apr 2026 01:22:44 GMT. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09,Secom General Research Grant = closed (March 31, 2026 at 12:00 JST), andNakatani Foundation research grant = next-cycle watch. - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync only refreshes the route-hold wording and the speech-side support reading. It does not widen the current queue or claim surface.
What still stays fixed after the 11:09 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 11:09 JSTaftermind-upload@208e59e2180c,EEG-DATA@00d85380f3f, andauto-research-funds@f4ba35518400still leaves both the current public six and the next-watch queue unchanged. - The current
mind-uploadhead is the earlier 10:07 route-hold packet refresh itself, while the newest upstream movement is onEEG-DATA:chore: deep-dive ChineseEEG-2 and PhysioNet auditory EEG. The refreshed summary still reports30,887merged-unique rows,28,850high-confidence rows, and24,875directly usable rows, andauto-research-fundskeeps the same practical shortlist while its repository stats still read8,585aid IDs,4,293rows, and3,943official-source rows without replacing the currentD10 / D03 / D02 / D01family or the next-watchD11 / D08 / D05 / D20family. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors because a direct live-access reread still showsIEEE DataPortlogin and subscription gates on those three routes. - The newest public-open adjuncts only tighten row-specific backup coverage rather than widen the queue:
ds007591andds007602strengthen speech-side backup options forU13-2but still expose only three released participants each,ChineseEEG-2strengthens public reading/listening alignment coverage forU13-5but still does not expose the intended recall-labeled branch, and PhysioNetauditory-eegis clearly public-open but remains single-day 4-channel coverage rather than a replacement forD02inU0-2 / U0-3. - Browser-level live checks before this source sync still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages now returnedLast-Modified: Thu, 02 Apr 2026 01:22:44 GMT. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipofficial page still reads as the annualmid-January to early-Aprilwindow, andSecom General Research Grantstill shows the current cycle closed (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync only refreshes the route-hold wording and the backup-family reading after the newest
EEG-DATAcarry-forward. It does not widen the current queue or claim surface.
What still stays fixed after the 10:07 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 10:07 JSTaftermind-upload@be507c810b11,EEG-DATA@3f20f48cca6e, andauto-research-funds@fb32c05163f4still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge:
mind-uploadrefines EEG foundation setup-equivalence boundaries outside the current six,EEG-DATAdeep-dives the HBN EEG release 11 route and now reports30,887merged-unique rows,28,850high-confidence rows, and24,871directly usable rows, andauto-research-fundskeeps the same practical shortlist while its repository stats still read8,585aid IDs,4,293rows, and3,943official-source rows without replacing the currentD10 / D03 / D02 / D01family or the next-watchD11 / D08 / D05 / D20family. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors because a direct live-access reread still showsIEEE DataPortlogin and subscription gates on those three routes. - The row-level bridge reading only tightens inside that unchanged queue:
U13-5still keeps an explicit recall-validity caveat because the visibleD03metadata still does not expose a recall-specific label, andU14-4 / U14-2still keepD13as the first public-open rerun support family beyond the currentD01disclosure floor. - Browser-level live checks before this source sync still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages also returnedLast-Modified: Thu, 02 Apr 2026 00:15:06 GMT. - This source sync also re-aligns the public-side row wording and the funding-facing
60RQdossier wording to the sameDxx + DOI + dataset name + access classstandard, so the bridge page, the deep dossiers, and the funding repo now point to the same canonical row packets again. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipofficial page still reads as the annualmid-January to early-Aprilwindow, andSecom General Research Grantstill shows the current cycle closed (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync only refreshes the route-hold wording on the public entry pages and the canonical row packets. It does not widen the current queue or claim surface.
What still stays fixed after the 09:05 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 09:05 JSTaftermind-upload@d7f30648fc40,EEG-DATA@ac8cc6fc8e74, andauto-research-funds@31ec17305f6astill leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge:
mind-uploadtightens a literature myelin route split outside the current six,EEG-DATAadds theaw8szdeep dive and now reportsmerged_unique=30886,high_confidence=28849, andaccess_counts_high.immediate=24500, andauto-research-fundscarries forward theAoi graduate scholarship/JSSF research grantmerges plus a README-stat refresh to8,585aid IDs,4,293rows, and3,943official-source rows without replacing the currentD10 / D03 / D02 / D01family or the next-watchD11 / D08 / D05 / D20family. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors because a direct live-access reread still showsIEEE DataPortlogin and subscription gates on those three routes. - Browser-level live checks before this source sync still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages also returnedLast-Modified: Wed, 01 Apr 2026 23:29:12 GMT, and the live pages still surfaced the earlier04:09 JST/03:08 JSTreread notes before this source update. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipofficial page still reads as the annualmid-January to early-Aprilwindow, andSecom General Research Grantstill shows the current cycle closed (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync only refreshes the route-hold wording on the public entry pages. It does not widen the current queue or claim surface.
What still stays fixed after the 03:08 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 03:08 JSTaftermind-upload@d391dbede29e,EEG-DATA@f9df9ba85a6, andauto-research-funds@95f804055809still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge:
mind-uploadsplits ECM / PNN literature routes outside the current six,EEG-DATAadds two immediate-access deep-dive candidates (10.48804/NV4RGLand10.7281/T1/B660D2) without replacing the currentD10 / D03 / D02 / D01family or the next-watchD11 / D08 / D05 / D20family, andauto-research-fundsadds Gakusho / NII funding merges plus a README-stat refresh without changing the practical shortlist. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks before this source sync still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages also returnedLast-Modified: Wed, 01 Apr 2026 17:27:08 GMT, and the live route order still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync only refreshes the route-hold wording on the public entry pages. It does not widen the current queue or claim surface.
What still stays fixed after the 00:03 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 00:03 JSTaftermind-upload@cff3abab58e8,EEG-DATA@a885ef3f029d, andauto-research-funds@0f60872538dcstill leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge:
mind-uploadtightens deuterium operating-point wording outside the current six,EEG-DATAadds theDANDI 001187deep dive and now reportsmerged_unique=30875,high_confidence=28838, andaccess_counts_high.immediate=24492, andauto-research-fundscarries forward theIsono / Okabescholarship refresh without changing the practical shortlist. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks before this source sync still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages also returnedLast-Modified: Wed, 01 Apr 2026 14:17:54 GMT, and the live route order still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 22:05 JST actual-pull reread on April 1, 2026
- An actual-pull recheck at
2026-04-01 22:05 JSTaftermind-upload@84e5337,EEG-DATA@bbb8d6c63d7, andauto-research-funds@5ff33413estill leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge:
mind-uploadclarifies clearance-route labels at the front door outside the current six,EEG-DATArefreshes deep-dive metadata while keepingmerged_unique=30873,high_confidence=28836,access_counts_high.immediate=24487, and18,312 / 28,832experiment-facing rows (63.51%coverage), andauto-research-fundsadds theYamaoka graduate scholarshipsnapshot plus README-facing stats refresh without changing the practical shortlist. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks before this source sync still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages also returnedLast-Modified: Wed, 01 Apr 2026 12:13:54 GMT, and the live route order still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 18:05 JST actual-pull reread on April 1, 2026
- An actual-pull recheck at
2026-04-01 18:05 JSTaftermind-upload@9984d0b,EEG-DATA@5fc1df00f07, andauto-research-funds@d7092c8e9still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge:
mind-uploaddeepens wearableOPM / MEGroute synchronization and measurement-stack clarification outside the current six,EEG-DATAadds a continuous-pursuit EEG BCI deep dive and now reportsmerged_unique=30873,high_confidence=28836, andaccess_counts_high.immediate=24486, its experiment-metadata report still covers18,312 / 28,832rows with at least one experiment-facing field (63.51%coverage), andauto-research-fundskeeps the same practical shortlist after the recent carry-forward scholarship refresh. - Route-safe access wording also stays unchanged: the refreshed local
EEG-DATAcatalog keeps widening, but the live-access read remains stricter, soD10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks with a browser user agent still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the currentLast-Modifiedheader isWed, 01 Apr 2026 08:22:51 GMTon those public surfaces, and the liveissue.htmlparagraph still names the same six in the same order before this run's new addendum. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items)full-item audit still showed enough route coverage (items=203,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 17:06 JST actual-pull reread on April 1, 2026
- An actual-pull recheck at
2026-04-01 17:06 JSTaftermind-upload@c5a0550,EEG-DATA@82893f6ca6e, andauto-research-funds@ec6f7d068still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge:
mind-uploaddeepens astrocyte PET route splits outside the current six,EEG-DATAdeep-dives the KMI EEG dataset and now reportsmerged_unique=30871,high_confidence=28834, andaccess_counts_high.immediate=24484, its experiment-metadata report still covers18,312 / 28,832rows with at least one experiment-facing field (63.51%coverage), andauto-research-fundsadds theMegachips 2026 scholarshipsnapshot plus a README-stat refresh without changing the practical shortlist. - Route-safe access wording also stays unchanged: the refreshed local
EEG-DATAcatalog still rendersD03 / D02as catalog-side immediate rows andD01as a mixed immediate/check-needed pair, but the live-access read remains stricter, soD10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks with a browser user agent still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the currentLast-Modifiedheader isWed, 01 Apr 2026 07:16:09 GMTon those public surfaces, and the liveissue.htmlparagraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items)full-item audit still showed enough route coverage (items=203,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 14:09 JST actual-pull reread on April 1, 2026
- An actual-pull recheck at
2026-04-01 14:09 JSTaftermind-upload@ccef40f2f7cf,EEG-DATA@deefd5f95c6d, andauto-research-funds@f5f76c485ccbstill leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge:
mind-uploadclarifies presynaptic release-machinery ceilings outside the current six,EEG-DATAnow reportsmerged_unique=30869,high_confidence=28832, andaccess_counts_high.immediate=24482, its new experiment-metadata report now covers18,312 / 28,832rows with at least one experiment-facing field (63.51%coverage), andauto-research-fundsrefreshes repo-level stats without changing the practical shortlist. - Route-safe access wording also stays unchanged: the refreshed local
EEG-DATAcatalog still rendersD03 / D02as catalog-side immediate rows andD01as a mixed immediate/check-needed pair, but the live-access read remains stricter, soD10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks with a browser user agent still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the currentLast-Modifiedheader isWed, 01 Apr 2026 04:20:02 GMTon those public surfaces, and the liveissue.htmlparagraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items)full-item audit still showed enough route coverage (items=203,Kura=2,Nakatani family=11,Nakatani graduate scholarship=5,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 12:06 JST actual-pull reread on April 1, 2026
- A second actual-pull recheck at
2026-04-01 12:06 JSTaftermind-upload@9f4bc8e760b1,EEG-DATA@1324f9e1ae2b, andauto-research-funds@6548b1650535still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge:
mind-uploadalready keeps the route-hold wording public-safe,EEG-DATAnow reportsmerged_unique=30867,high_confidence=28830, andaccess_counts_high.immediate=24480, andauto-research-fundsrefreshes funding reread documentation without changing the practical shortlist. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six, whileD03 / D02 / D01remain gated-support planning anchors because the live-access read is still narrower than the catalog-side identifier surface. - Browser-level live checks with a browser user agent still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the currentLast-Modifiedheader isWed, 01 Apr 2026 02:26:28 GMTon those public surfaces, and the liveissue.htmlparagraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle. - No new Todoist route was introduced in this reread. The latest canonical funding-shortlist audit still already covers the current practical lanes, and the official recheck did not surface a new current-cycle funder.
What still stays fixed after the 11:06 JST actual-pull reread on April 1, 2026
- A latest actual-pull recheck at
2026-04-01 11:06 JSTaftermind-upload@aa21ab9855c1,EEG-DATA@cccd137a3468, andauto-research-funds@3a691196cb9fstill leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still deepen support rather than the present bridge:
mind-uploadalready keeps the route-hold wording public-safe,EEG-DATAdeepens repository-wide metadata and now reportsmerged_unique=30866,high_confidence=28829, andaccess_counts_high.immediate=24479, andauto-research-fundsrefreshes repo-level stats without changing the practical shortlist. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six, whileD03 / D02 / D01remain gated-support planning anchors because the live-access read is still narrower than the catalog-side identifier surface. - Browser-level live checks still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html;Last-Modifiedadvanced toWed, 01 Apr 2026 01:21:12 GMTforissue.html/u8-1andWed, 01 Apr 2026 01:21:13 GMTfor the two bridge pages, and the liveissue.htmlparagraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grant,Secom General Research Grant, andBrain Science Foundation research grantremain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist
api/v1/sync(items)full-item audit still showed enough route coverage (items=203,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 10:19 JST actual-pull reread on April 1, 2026
- A latest actual-pull recheck at
2026-04-01 10:19 JSTaftermind-upload@d87b9ce,EEG-DATA@c05ceda146f8, andauto-research-funds@ca65b206cf6dstill leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still widen support rather than the present bridge:
mind-uploaddeepened a beginner glial substrate route audit outside the current public-six packet,EEG-DATAadded anOpenNeuro ds006036deep dive that does not displaceD10 / D03 / D02 / D01or the next-watch familyD11 / D08 / D05 / D20, andauto-research-fundsaddedJCS / Takai / Korean scholarshipcurrent cards without changing the practical shortlist. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six, whileD03 / D02 / D01remain gated-support planning anchors because the live-access read is still narrower than the catalog-side identifier surface. - Browser-level live checks at
2026-04-01 10:19 JSTstill returned200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html, and the liveissue.htmlparagraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grant,Secom General Research Grant, andBrain Science Foundation research grantremain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist
api/v1/sync(items)full-item audit still showed enough route coverage (items=203,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 03:09 JST actual-pull reread on April 1, 2026
- A latest actual-pull recheck at
2026-04-01 03:09 JSTaftermind-upload@31835fcd8daa,EEG-DATA@12eef8ca4ef0, andauto-research-funds@040e5b8798fdstill leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still widen support rather than the present bridge:
mind-uploadsplit temporal routes for invasive language BCIs outside the current public-six packet,EEG-DATAadded a semantic-text-relevance deep dive that widens language-related backup coverage without displacingD10 / D03 / D02 / D01or the next-watch familyD11 / D08 / D05 / D20, andauto-research-fundsrefreshedObayashi / Yokogakucards without changing the practical shortlist. - Browser-level live checks at
2026-04-01 03:09 JSTstill returned200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html, and the liveissue.htmlparagraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grant,Secom General Research Grant, andBrain Science Foundation research grantremain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist
api/v1/sync(items)full-item audit still showed enough route coverage (items=203,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 01:06 JST live-source recheck on April 1, 2026
- A second no-op actual-pull recheck at
2026-04-01 01:06 JSTafter nestedmind-upload@8da02e2e48e0,EEG-DATA@e6013384fa01, andauto-research-funds@c6a383f07a7bstill leaves both the current public six and the next-watch queue unchanged. - The current
EEG-DATAhead still supports the same narrow anchor families rather than replacing them: the current-six familyD10 / D03 / D02 / D01and the next-watch familyD11 / D08 / D05 / D20are all still present in the repo, and public-safe wording still keepsD10as the only clear public-open primary whileD03 / D02 / D01remain gated-support planning anchors because the live-access read stays stricter than the catalog label. - Browser-level live checks at
2026-04-01 01:06 JSTstill returned200forissue.html,mind-upload-current-public-six-rq-brief.html,u8-1-closed-loop-delay-tolerance-route.html, andmind-upload-rq-solvability-bridge.html, so this run still keeps the public batch fixed. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grant,Secom General Research Grant, andBrain Science Foundation research grantremain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist
api/v1/syncfull-item audit still showed enough route coverage (items=204,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1), so no new task was added in this session.
What still stays fixed after the 00:12 JST actual-pull reread on April 1, 2026
- A latest actual-pull recheck at
2026-04-01 00:12 JSTaftermind-upload@e53a50b1256d,EEG-DATA@48f4814db5da, andauto-research-funds@76145d0e3f4cstill leaves both the current public six and the next-watch queue unchanged. - The current
EEG-DATAhead still supports the same narrow anchor families rather than replacing them: the current-six familyD10 / D03 / D02 / D01and the next-watch familyD11 / D08 / D05 / D20are all still present in the repo, but public-safe wording continues to keepD10as the only clear public-open primary whileD03 / D02 / D01remain gated-support planning anchors because the live-access read and mirror state still stay mixed. - Browser-level live checks at
2026-04-01 00:15 JSTstill returned200forissue.html,mind-upload-current-public-six-rq-brief.html, andu8-1-closed-loop-delay-tolerance-route.html, so this run keeps the public batch fixed and adds only a bounded reread note to the supporting route pages. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grant,Secom General Research Grant, andBrain Science Foundation research grantremain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist
api/v1/syncfull-item audit still showed enough route coverage (items=204,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1), so no new task was added in this session.
How to read "solvable with EEG" on this page
Close nowmeans a bounded benchmark, audit, or disclosure artifact that can be finished on one declared dataset family.Support onlymeans a useful anchor that still does not justify a stronger public-open route by itself.- When the live access audit and the catalog auto-label disagree, this page follows the live access audit for public-safe wording and keeps the catalog label only as a planning hint.
External dependencymeans a requirement that still needs theory work, language evaluation, legal judgment, clinical transfer, hardware validation, or broader community adoption outside this repository.Funding thememeans wording that still matches the present artifact level. It is not a promise that the larger mind-upload question is solved.
What still stays fixed after the 21:09 JST post-pull reread on March 31, 2026
- A latest pull recheck at
2026-03-31 21:09 JSTaftermind-upload@ed6f8203e46d,EEG-DATA@20fbbad9959f, andauto-research-funds@77f189662745still leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still widen support rather than the present bridge:
mind-uploadtightened dataset-benchmark object rules and clarified the FAQ RNA route split,EEG-DATAadded request-gatedHBUEDemotion-recognition coverage plus a continuous-pursuit online BCI metadata deep dive, andauto-research-fundsaddedTeraura Sayoko outbound scholarship,Gakusho scholarship, and README-stat refreshes, but none of those changes replace the currentD10 / D03 / D02 / D01family or the outside-current-six orderU7-1 -> U1-2 -> U4-2 -> U8-1. - Browser-level live checks at
2026-03-31 21:09 JSTstill returned200forissue.html,mind-upload-current-public-six-rq-brief.html, andu8-1-closed-loop-delay-tolerance-route.html, and the liveissue.htmlparagraph still names the current six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grant,Secom General Research Grant, andBrain Science Foundation research grantremain outside the current-cycle lane. - A fresh read-only Todoist
api/v1/syncfull-item audit still showed enough route coverage (items=205,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1), so no new task was added in this session.
What still stays fixed after the 19:07 JST post-pull reread on March 31, 2026
- A latest pull recheck at
2026-03-31 19:07 JSTaftermind-upload@b7b6c0498ae1,EEG-DATA@24e85cc20f09, andauto-research-funds@0fddd53bd03cstill leaves both the current public six and the next-watch queue unchanged. - The newest pulled deltas still widen support rather than the present bridge:
mind-uploadstrengthened the front-door human-proxy split,EEG-DATArefreshed the catalog tomerged_unique=30860,high_confidence=28823, andaccess_counts_high.immediate=24471, andauto-research-fundsrefreshed Kioxia/Takayanagi funding records, but none of those changes replace the currentD10 / D03 / D02 / D01family or the outside-current-six orderU7-1 -> U1-2 -> U4-2 -> U8-1. - Browser-level live checks at
2026-03-31 19:09 JSTstill returned200forissue.htmlandmind-upload-current-public-six-rq-brief.html, and the liveissue.htmlparagraph still names the current six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grantandSecom General Research Grantare already closed for the current cycle. - A fresh read-only Todoist full-item audit still showed enough route coverage (
items=205,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1), so no new task was added in this session.
What still stays fixed after the 17:06 JST post-pull reread on March 31, 2026
- A latest pull recheck at
2026-03-31 17:06 JSTaftermind-upload@4731680627ff,EEG-DATA@3e7a53d9ca8, andauto-research-funds@ef2924014a65still leaves both the current public six and the next-watch queue unchanged. - The newest
EEG-DATAadditions widen the support map rather than the present bridge: the NTU Dataverse adult-to-infant unidirectional neural-coupling raw/preprocessed releases are immediately downloadable and useful for future social-learning or paired-observer rows, while OpenNeurods007146adds a large auditory MEG/EEG/Ear-EEG record that still staysuncertain_publicbecause the visible public object tree does not yet verify the claimed raw EEG / Ear-EEG coverage. - Recounting the
### Ux-yheadings in the RQ-by-RQ dossiers still returns60, so this run does not replace the one-row-at-a-time workflow with a flatter summary pass. - Browser-level live checks with a browser user agent still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html, andu8-1-closed-loop-delay-tolerance-route.html. - The practical funding reading therefore stays narrow:
Kura Fund,Nakatani Foundation graduate scholarship, andKashinome Scholarshipremain the active bridge for the current six,Secom General Research Grantis already closed for the current cycle (March 31, 2026 at 12:00 JST) and stays only as a carried-forward watch record, and no new Todoist item was created in this session.
What still stays fixed after the 16:32 JST metadata carry-forward reread on March 31, 2026
- A latest pull reread after
mind-upload@a11240d38415,EEG-DATA@3e7a53d9ca84, andauto-research-funds@c95cc61fdfc9still leaves both the current public six and the next-watch queue unchanged. EEG-DATA's newest head is a metadata-deepening carry-forward rather than a route swap: the refreshed catalog now reportsmerged_unique=30858,high_confidence=28821, andaccess_counts_high.immediate=24469, which widens the backup-family search space but still does not replace the currentD10 / D03 / D02 / D01family for the active route.- The practical access reading also stays conservative. The refreshed catalog still exposes
D01through the DOI route as immediate and still keepsD02in the immediate/planning bucket, but the live public route continues to follow the stricter access audit and therefore keepsD03 / D02 / D01only as subscription-gated support anchors. - Browser-level live checks in this run still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html, andu8-1-closed-loop-delay-tolerance-route.html, so no extra public-front-page prose was added. - A fresh Todoist
api/v1/sync(items)audit still showed enough coverage (items=205,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this run.
What stays fixed on March 31, 2026
- The current public six-question batch still stays
U13-2 -> U13-5 -> U0-2 -> U0-3 -> U14-4 -> U14-2. - The next-watch queue still stays
U7-1 -> U1-2 -> U4-2 -> U8-1. - If you want the exact next-watch row packets, continue with the U7-1 route packet, the U1-2 route packet, the U4-2 route packet, and the U8-1 route packet.
- Inside the current public six,
D10 3M-CPSEEDremains the only clearly public-open primary anchor. D03 Multimodal Fusion EEG + Eye-Tracking,D02 CSTE, andD01 Acquisition delay of wireless EEGstill remain subscription-gated support anchors on the public route.- No new Todoist task was needed in this run because the current practical lanes and watch lanes were already covered by existing tasks in the funding workflow.
Why this page exists
- The current public six brief is intentionally short.
- The
RQ60feasibility and dossier pages are intentionally wide. - This page is the bridge in between: it fixes the current execution queue and the next-watch queue at a row-by-row level without pretending that all
60RQitems should be read at the same depth right now.
Current public six
| RQ | Main anchor now | What EEG can honestly close now | What still stays outside the claim | Funding theme that still fits | Lane that still fits now | Todoist |
|---|---|---|---|---|---|---|
U13-2 |
D10 3M-CPSEED (10.18112/openneuro.ds006465.v2.0.0, immediate) |
A bounded brain-minus-prior control table, mimic-separation note, and inconsistency audit for imagined speech. |
Preserved internal mechanism, preserved identity, and any stronger mind-preservation wording. | Neural-contribution audit for imagined speech with a brain-minus-prior control |
Kura Fund, then Nakatani Foundation graduate scholarship |
Existing tasks already cover the lane. No new item was added. |
U13-5 |
D03 Multimodal Fusion EEG + Eye-Tracking (10.21227/6106-6120, subscription-gated support) |
A perception-to-recall degradation note and transfer-gap table under one bounded paired-stream route, with an explicit recall-validity caveat. | Any stronger mechanism-preservation reading or claim that a shared decoder implies a shared preserved mechanism. | Perception-to-recall transfer-gap benchmark for mimic separation |
Kura Fund, then Nakatani Foundation graduate scholarship |
Existing tasks already cover the lane. No new item was added. |
U0-2 |
D02 CSTE (10.21227/j162-nh61, subscription-gated support) |
An offset / jitter distribution plus a state-feature collapse audit for a bounded identity-drift benchmark. |
Legal, philosophical, or normative continuity claims. | Temporal-validity-aware identity-drift audit with offset, jitter, and state-feature collapse |
Nakatani Foundation graduate scholarship, then Kashinome Scholarship |
Existing tasks already cover the lane. No new item was added. |
U0-3 |
D02 CSTE (10.21227/j162-nh61, subscription-gated support) |
A threshold-stability note and overfit-exclusion rule on the same repeated-session floor as U0-2. |
Treating a stable threshold as sufficient for personhood continuity or branch-identity resolution. | Task-specific threshold stability and overfit-exclusion benchmark for identity drift |
Nakatani Foundation graduate scholarship, then Kashinome Scholarship |
Existing tasks already cover the lane. No new item was added. |
U14-4 |
D01 Acquisition delay of wireless EEG (10.21227/dv1p-vq18, subscription-gated support) |
Filled Model Card and Dataset Card examples for one bounded latency/disclosure floor, to be widened only with D13-backed rerun examples. |
Field-wide reproducibility, standards adoption, or deployment readiness. | Card-integrated reproducibility contract for the current public batch |
Kura Fund; Nakatani Foundation research grant as next-cycle watch |
Existing tasks already cover the lane. No new item was added. |
U14-2 |
D01 Acquisition delay of wireless EEG (10.21227/dv1p-vq18, subscription-gated support) |
A fixed-split rerun contract and negative-case trail for exploration-versus-confirmation discipline, to be widened only with D13-backed rerun examples. |
Presenting exploratory outputs as confirmatory evidence or claiming broad rerun robustness. | Fixed-split rerun contract for exploration versus confirmation |
Kura Fund; Nakatani Foundation research grant as next-cycle watch |
Existing tasks already cover the lane. No new item was added. |
Solve-first stacks inside the current public six
| Stack | Current order | Why this stack stays narrow now | Main anchor family and first public-open support |
|---|---|---|---|
| Speech-side contribution stack | U13-2 -> U13-5 |
First keep neural contribution separate from the language prior, then ask where decoder transfer breaks when the route moves from perception to recall. | D10 stays the first public-open floor; D03 stays the paired-stream planning anchor; public-open backup remains D10 plus ZuCo 2.0 and the spoken/imagination robot-speech EEG family. |
| Identity-drift floor | U0-2 -> U0-3 |
First bound timing drift and state-feature collapse, then ask whether the threshold rule survives once the timing floor is fixed. | D02 stays the planning floor; the cleanest public-open stress tests remain ds004148 and ds007216. |
| Disclosure-to-rerun contract | U14-4 -> U14-2 |
First turn disclosure fields into filled card examples, then freeze the exploration-versus-confirmation split under one rerun contract. | D01 stays the planning floor; D13 remains the first public-open rerun family those two rows would need next, with D08 kept for grounded validation-field examples. |
The cleanest public-open support underneath those three stacks still stays outside the batch itself: U7-1 -> U1-2 keeps the synchronization and inverse-uncertainty floor readable without forcing a batch switch.
Public-open backup families for the current public six
These backup families do not replace the current planning anchors. They only record the least-distorting public-open inspection path when the main planning anchor is gated.
| RQ | Best public-open backup family | What it keeps testable | Why it still stays backup-only |
|---|---|---|---|
U13-5 |
D10 3M-CPSEED, ZuCo 2.0, and spoken + imagined robot-speech EEG |
Decoder-side transfer failure, a public EEG+ET paired-stream family, and speech-condition collapse can still be inspected without a gated paired-stream dataset. | None of these public-open families exposes a clean recall-labeled branch point, so the route still loses the reason D03 stays primary in planning. |
U0-2 |
A test-retest resting and cognitive state EEG dataset, then A multi-session simultaneous EEG-fMRI dataset with online experience sampling |
Retest drift and provenance-sensitive timing failure can still be stress-tested on public-open families. | The route still loses the direct cross-session / cross-task biometrics framing that keeps D02 primary in planning. |
U0-3 |
A test-retest resting and cognitive state EEG dataset, then A multi-session simultaneous EEG-fMRI dataset with online experience sampling |
Threshold drift can still be checked under public-open retest and multi-session ladders. | The route still loses the cleanest intended identity-drift floor, so the result remains backup-only. |
U14-4 |
D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications, then D08 Simultaneous human intracerebral stimulation and HD-EEG |
The card contract can still be illustrated with the first required public-open rerun family plus grounded validation-field examples. | These families help only after the first disclosure contract is fixed; they do not replace the narrower latency-first planning anchor, but D13 is the support family the row would need next. |
U14-2 |
D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications, then D08 Simultaneous human intracerebral stimulation and HD-EEG |
Split-violation examples and validation-heavy failure trails can still be illustrated on public-open datasets. | They widen rerun examples later, but they do not replace the latency-first split boundary that keeps D01 primary in planning. |
Exact dataset family to use before stronger wording
The tables above fix the present route at the level of one primary anchor per row. The table below answers the more operational question that comes next: which nearby EEG-DATA family should stay on deck before the row is widened or submitted with stronger wording.
For the current public six
| RQ | Primary anchor to code first | Support family to keep nearby | Why the support family still stays secondary |
|---|---|---|---|
U13-2 |
D10 3M-CPSEED (10.18112/openneuro.ds006465.v2.0.0, immediate) |
EEG data recorded during spoken and imagined speech interaction with a simulated robot (10.5281/zenodo.14645652, immediate), D03 Multimodal Fusion EEG + Eye-Tracking (10.21227/6106-6120, gated), and D09 VICODEV (10.21227/r8fc-2y40, gated) |
They help later control-family design, multimodal comparison, or speech-side stress tests, but none keeps the same clean overt / silent-intended / imagined ladder as D10 for the first public artifact. |
U13-5 |
D03 Multimodal Fusion EEG + Eye-Tracking (10.21227/6106-6120, gated support) |
D10 3M-CPSEED (10.18112/openneuro.ds006465.v2.0.0, immediate), ZuCo 2.0 (https://osf.io/2urht, immediate public EEG+ET family), and EEG data recorded during spoken and imagined speech interaction with a simulated robot (10.5281/zenodo.14645652, immediate) |
They are useful for speech-side transfer stress tests and public EEG+ET inspection, but none exposes a clean recall-labeled branch point, so the present row still cannot close without an external recall-validity layer. |
U0-2 |
D02 CSTE (10.21227/j162-nh61, gated support) |
A test-retest resting and cognitive state EEG dataset (10.18112/openneuro.ds004148.v1.0.1, immediate) and A multi-session simultaneous EEG-fMRI dataset with online experience sampling (10.18112/openneuro.ds007216.v1.0.0, immediate) |
They are stronger public-open stress-test families for retest ladders and synchronization logging, but they are not as direct a cross-session / cross-task biometrics floor as D02. |
U0-3 |
D02 CSTE (10.21227/j162-nh61, gated support) |
A test-retest resting and cognitive state EEG dataset (10.18112/openneuro.ds004148.v1.0.1, immediate) and A multi-session simultaneous EEG-fMRI dataset with online experience sampling (10.18112/openneuro.ds007216.v1.0.0, immediate) |
They are the right adjuncts once the threshold rule needs a richer session-external retest ladder, but they still do not replace D02 as the narrowest identity-drift floor. |
U14-4 |
D01 Acquisition delay of wireless EEG (10.21227/dv1p-vq18, gated support) |
D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications (10.17632/vyczny2r4w, immediate) and D08 Simultaneous human intracerebral stimulation and HD-EEG (10.21227/7may-9q56, access-mixed) |
They are better for richer rerun examples and leak-audit design once the first card fields are fixed. D13 is the first public-open support family the row would need next, but it still does not replace D01 as the latency/disclosure floor. |
U14-2 |
D01 Acquisition delay of wireless EEG (10.21227/dv1p-vq18, gated support) |
D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications (10.17632/vyczny2r4w, immediate) and D08 Simultaneous human intracerebral stimulation and HD-EEG (10.21227/7may-9q56, access-mixed) |
They are the right adjuncts for split-violation examples and broader rerun families. D13 is the first public-open support family the row would need next, but the first bounded split contract still reads most cleanly on the narrower latency route. |
For the next-watch queue
| RQ | Primary anchor to code first | Support family to keep nearby | Why the support family still stays secondary |
|---|---|---|---|
U7-1 |
D11 A multi-session simultaneous EEG-fMRI dataset with online experience sampling (10.18112/openneuro.ds007216.v1.0.0, immediate) |
D15 A simultaneous EEG-fNIRS dataset for investigating working memory load (10.21227/tswy-m550, immediate) and D23 EEG, PPG, GSR Multimodal Physiological Signals for Rehabilitation Fatigue Detection (10.6084/m9.figshare.31169026, immediate) |
They are useful for multimodal stress tests after the four-field contract is fixed, but neither matches D11 on provenance richness and session structure for the first synchronization packet. |
U1-2 |
D08 Simultaneous human intracerebral stimulation and HD-EEG (10.21227/7may-9q56, public DOI handoff 10.25493/NXN2-05W) |
D11 A multi-session simultaneous EEG-fMRI dataset with online experience sampling (10.18112/openneuro.ds007216.v1.0.0, immediate) and D19 CerebellarTMSEEGData (10.6084/m9.figshare.13082495, immediate) |
They are strong perturbation-family cross-checks, but they do not replace the direct ground-truth + intervention + inverse-validation role of D08. |
U4-2 |
D05 EEG cortical responses after HiPi (10.21227/8snc-7h06, immediate) |
D08 Simultaneous human intracerebral stimulation and HD-EEG (10.21227/7may-9q56, access-mixed) and D19 CerebellarTMSEEGData (10.6084/m9.figshare.13082495, immediate) |
They are better for known-site or second-family perturbation checks after the first causal sign-agreement rule is fixed, but they are less minimal than D05 for the first rebuttal gate. |
U8-1 |
D20 Closed-loop auditory stimulation targeting REM oscillations (10.5281/zenodo.10663994, immediate) |
D21 NeuroSimo: closed-loop EEG/EMG-guided TMS (10.5281/zenodo.14398633, immediate) and D12 Longitudinal MI-BCI training with transcutaneous spinal stimulation (10.5281/zenodo.15454354, immediate) |
They are the right support families for trigger/recovery cross-checks and retraining burden, but D20 remains the cleanest public-open first anchor for one bounded delay-tolerance packet. |
Next-watch queue and adjacent support packets outside the current public six
The headline next-watch queue still stays U7-1 / U1-2 / U4-2 / U8-1. U7-2 is listed below as an adjacent support packet inside the same synchronization family, not as a queue replacement.
| RQ | Main anchor now | What EEG can honestly close next | What still stays outside the claim | Funding theme that still fits | Watch lane | Todoist |
|---|---|---|---|---|---|---|
U7-1 |
D11 A multi-session simultaneous EEG-fMRI dataset with online experience sampling (10.18112/openneuro.ds007216.v1.0.0, immediate) |
A four-field synchronization contract, offset/jitter audit, and reanalysis-success note. | Device-wide standard adoption and any claim that synchronization logging alone solves validity. | A public-open synchronization and QC contract for multimodal EEG verification in the mind-upload route |
Okawa Foundation research grant (watch) |
Existing watch tasks already cover the lane. No new item was added. |
U7-2 |
D11 A multi-session simultaneous EEG-fMRI dataset with online experience sampling (10.18112/openneuro.ds007216.v1.0.0, immediate) |
An explicit offset median / jitter p95 / peak-latency drift / reanalysis agreement metric bundle plus release-block thresholds for the same synchronization family. |
Any claim that those thresholds alone solve validity, establish field-wide standards, or remove broader hardware-truth requirements. | Release-block timing metrics for public-open multimodal EEG synchronization in the mind-upload route |
Okawa Foundation research grant (watch) |
Existing watch tasks already cover the lane. No new item was added. |
U1-2 |
D08 Simultaneous human intracerebral stimulation and HD-EEG (10.21227/7may-9q56, public DOI handoff 10.25493/NXN2-05W) |
An inverse uncertainty-calibration report, coverage-stability table, and downgrade rule under repeated perturbations. | Any claim that one stable inverse route already proves full recoverability or preserved mechanism. | Perturbation-tested uncertainty calibration for inverse EEG estimates in the mind-upload verification route |
Brain Science Foundation research grant (watch), Nakatani Foundation research grant (next-cycle watch) |
Existing watch tasks already cover the lane. No new item was added. |
U4-2 |
D05 EEG cortical responses after HiPi (10.21227/8snc-7h06, immediate) |
A minimal intervention protocol, sign-agreement table, and rebuttal boundary for one narrow causal packet. | Broader theory ranking, global causal-equivalence claims, and any preserved-identity reading. | Minimal causal-intervention benchmark for reproducible EEG verification in the mind-upload route |
Brain Science Foundation research grant (watch), Nakatani Foundation research grant (next-cycle watch) |
Existing watch tasks already cover the lane. No new item was added. |
U8-1 |
D20 Closed-loop auditory stimulation targeting REM oscillations (10.5281/zenodo.10663994, immediate) |
A closed-loop safety KPI dashboard, delay-tolerance band note, and downgrade rule for one named loop family. | Universal loop thresholds, chronic deployment claims, and any identity-relevant controller reading. | Operational delay-tolerance and safety-stop dashboard for closed-loop EEG control in the mind-upload route |
Japan Industrial Science Research Institute research grant (watch), Nakatani Foundation research grant (next-cycle watch) |
Existing watch tasks already cover the lane. No new item was added. |
Funding windows that still matter right now
Kura Fundremains open throughApril 17, 2026 at 17:00.Nakatani Foundation graduate scholarshipruns fromApril 1, 2026throughMay 25, 2026 at 15:00.Kashinome Scholarshipremains open throughApril 9, 2026.Secom General Research Grantis already closed for the current cycle (March 31, 2026 at 12:00 JST) and now stays only as a carried-forward watch record.Brain Science Foundation research grant,Okawa Foundation research grant,Japan Industrial Science Research Institute research grant, andNakatani Foundation research grantstay in watch or next-cycle-watch mode for the outside-current-six queue.
What still does not become true just because this page exists
- It does not turn the wider
60RQmap into a same-depth execution queue. - It does not raise the public claim ceiling above bounded benchmark, audit, and disclosure artifacts.
- It does not move theory, law, neurorights, chronic deployment, or full identity questions into an EEG-only solved state.