mind upload current public six rq brief - yasufumi-nakata/mind-upload GitHub Wiki

Mind-upload Current Public Six: EEG Route Brief

A narrow route brief, not a solved-claim update

This learning page is generated for GitHub Wiki. The public portal is managed on mind-upload.com.

  • Updated: 2026-04-04 / Role: Current public six

Role Of This Page

This page fixes the current public six-question route at the level of one RQ, one bounded anchor, one first artifact, and one funding sentence.

Back To Public Pages

Related Wiki Pages

  • Wiki: RQ solvability bridge - One page for what EEG can close now, what still needs outside support, and which funding lane still fits.
  • Wiki: RQ-by-RQ deep dossiers - The longer working dossier for the current public six and the wider 60RQ map.
  • Wiki: Grant and dataset playbook - The route from each RQ to the current bounded funding lane and EEG anchor.
  • Wiki: U13-2 route packet - Why D10 stays first for U13-2, why the other speech candidates stay secondary, and what the first artifact can honestly close.
  • Wiki: U13-5 route packet - Why D03 stays the intended gated-support anchor for U13-5, why the support anchors stay secondary, and what the transfer-gap artifact can honestly close.
  • Wiki: U0-2 route packet - Why D02 stays the intended gated-support anchor for U0-2, why the support anchors stay secondary, and what the timing-floor artifact can honestly close.
  • Wiki: U0-3 route packet - Why D02 stays the intended gated-support anchor for U0-3, why the support anchors stay secondary, and what the threshold-governance artifact can honestly close.
  • Wiki: U14-4 route packet - Why D01 stays the intended gated-support anchor for U14-4, why richer rerun benchmarks stay secondary, and what the card-contract artifact can honestly close.
  • Wiki: U14-2 route packet - Why D01 stays the intended gated-support anchor for U14-2, why richer rerun benchmarks stay secondary, and what the fixed-split artifact can honestly close.
  • Wiki: U7-2 route packet - The adjacent timing-metric packet that keeps the same D11 synchronization family readable without changing the current public six.

Mind-upload Current Public Six: EEG Route Brief

This page keeps the current public six-question batch readable at the level of one RQ -> one bounded EEG anchor -> one first artifact -> one funding bridge.

It does not announce solved claims. It only states what the current public route is narrow enough to support after a post-pull review of mind-upload, EEG-DATA, auto-research-funds, the live public page, the current official funding windows, and a read-only Todoist recheck.

What still stays fixed after the 17:07 JST actual-pull reread on April 4, 2026

  • An actual-pull recheck at 2026-04-04 17:07 JST after mind-upload@dc8ec5dc5e62, EEG-DATA@f115f11c2da4, and auto-research-funds@8d0f5128fcdc still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas are still carry-forward rather than route replacement: mind-upload splits barrier-side human-proxy roles outside the current six without widening the route, EEG-DATA deepens the EEGIS imagined speech metadata while still keeping 30,930 merged-unique rows, 28,893 high-confidence rows, and 24,909 immediately usable rows in the current README snapshot, and auto-research-funds adds the Uehiro ethics foundation legacy sync while now reporting 8,616 aid IDs, 4,319 rows, and 3,971 official-source rows without displacing the practical shortlist.
  • Route-safe access wording therefore still stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors, and the next-watch family still stays D11 / D08 / D05 / D20.
  • The three-stack reading also stays explicit rather than generic: U13-2 / U13-5 remain the speech-side control and transfer-gap pair, U0-2 / U0-3 remain the identity-drift floor and threshold-governance pair, and U14-4 / U14-2 remain the card-contract and fixed-split rerun-governance pair.
  • Browser-level live checks in this run returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, mind-upload-eeg-rq60-grant-dataset-playbook.html, and u13-2-brain-minus-prior-route.html; the checked headers now returned Last-Modified: Sat, 04 Apr 2026 07:12:56 GMT, and the checked bodies still surfaced 2026-04-04 14:10 JST wording across all five checked pages before this source sync.
  • Official-window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, the Kashinome Scholarship still reads as the 2026-04-09 must-arrive side route, Nakatani Foundation research grant = closed / next-cycle watch, and Secom General Research Grant = closed (2026-03-31 12:00 JST).
  • A fresh read-only Todoist audit still showed enough route coverage (items=206, projects=2, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, JSM=0, Doumei=0, Kenkyu no Susume=0), so no new task was added in this session.
  • This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while aligning the front door and the U13-2 row packet to the same bounded 17:07 JST basis.

What still stays fixed after the 14:10 JST actual-pull reread on April 4, 2026

  • An actual-pull recheck at 2026-04-04 14:10 JST after mind-upload@cafeab4bc2a5, EEG-DATA@e0695bcac83d, and auto-research-funds@a4852d89376c still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas are still carry-forward rather than route replacement: mind-upload tightens glossary excitability and ionic terms on top of the earlier EEG foundation-model source-status split without widening the route, EEG-DATA deepens neuroTUM Cybathlon, Zenodo TSA v7.8, and poetry EEG metadata while still keeping 30,930 merged-unique rows, 28,893 high-confidence rows, 24,909 immediate rows, and 24,539 high-confidence immediate rows, and auto-research-funds adds JELA Diakonia scholarship cards without displacing the practical shortlist.
  • Route-safe access wording therefore still stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors, and the next-watch family still stays D11 / D08 / D05 / D20.
  • The three-stack reading also stays explicit rather than generic: U13-2 / U13-5 remain the speech-side control and transfer-gap pair, U0-2 / U0-3 remain the identity-drift floor and threshold-governance pair, and U14-4 / U14-2 remain the card-contract and fixed-split rerun-governance pair.
  • Browser-level live checks in this run returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, mind-upload-eeg-rq60-grant-dataset-playbook.html, and the current-six row packets; the checked headers now returned Last-Modified: Sat, 04 Apr 2026 04:18:04 GMT, and the checked bodies still surfaced 2026-04-04 12:02 JST wording on issue / brief / bridge / playbook while the older current-six row packets still surfaced 2026-04-04 09:05 JST wording before this source sync.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, the Kashinome Scholarship still reads as the annual mid-January to early-April window and continues to be handled as the 2026-04-09 must-arrive side route, Nakatani Foundation research grant = closed / next-cycle watch, and Secom General Research Grant = closed (2026-03-31 12:00 JST).
  • A fresh read-only Todoist audit still showed enough route coverage (items=206, projects=2, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, Doumei=0, Kenkyu no Susume=0), so no new task was added in this session.
  • This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while aligning the front door, playbook, and the entire current-six row packet set to the same bounded 14:10 JST basis.

What still stays fixed after the 12:02 JST actual-pull reread on April 4, 2026

  • An actual-pull recheck at 2026-04-04 12:02 JST after mind-upload@f84f6e53753b, EEG-DATA@017ae806c4dd, and auto-research-funds@d4024a5b8a1a still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas are still carry-forward rather than route replacement: mind-upload synchronizes the EEG recording-frame contract across public pages without widening the route, EEG-DATA deep-dives capacity-for-movement EEG datasets while still keeping 30,929 merged-unique rows, 28,892 high-confidence rows, 24,908 immediate rows, and 24,538 high-confidence immediate rows, and auto-research-funds still just carries the earlier 11:04 JST funding addendum without displacing the practical shortlist.
  • Route-safe access wording therefore still stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors, and the next-watch family still stays D11 / D08 / D05 / D20.
  • Browser-level live checks in this run returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, mind-upload-eeg-rq60-grant-dataset-playbook.html, and u13-2-brain-minus-prior-route.html; the checked headers now returned Last-Modified: Sat, 04 Apr 2026 02:19:09 GMT, and the checked bodies already surfaced 2026-04-04 11:04 JST wording on issue / brief / bridge / playbook while u13-2-brain-minus-prior-route.html still surfaced 2026-04-04 09:05 JST wording before this source sync.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, the Kashinome Scholarship still reads as the annual mid-January to early-April window and continues to be handled as the 2026-04-09 must-arrive side route, Nakatani Foundation research grant = closed / next-cycle watch, and Secom General Research Grant = closed (2026-03-31 12:00 JST).
  • A fresh read-only Todoist audit still showed enough route coverage (items=206, projects=2, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, Doumei=0, Kenkyu no Susume=0), so no new task was added in this session.
  • This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while aligning the front door, playbook, and the first-row packet to the same bounded 12:02 JST basis.

What still stays fixed after the 11:04 JST actual-pull reread on April 4, 2026

  • An actual-pull recheck at 2026-04-04 11:04 JST after mind-upload@812e1650bae1, EEG-DATA@1deac45c75a2, and auto-research-funds@9741ee45a025 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas are still carry-forward rather than route replacement: mind-upload tightens glossary bridge-witness terminology without widening the route, EEG-DATA collapses duplicate EEG-fMRI override rows and now keeps 30,929 merged-unique rows, 28,892 high-confidence rows, 24,908 immediate rows, and 24,538 high-confidence immediate rows while leaving the current D10 / D03 / D02 / D01 family unchanged, and auto-research-funds adds legacy coverage for current-cycle funding cards without displacing the practical shortlist.
  • Route-safe access wording therefore still stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors, and the next-watch family still stays D11 / D08 / D05 / D20.
  • Browser-level live checks in this run returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, mind-upload-eeg-rq60-grant-dataset-playbook.html, and u13-2-brain-minus-prior-route.html; the checked headers now returned Last-Modified: Sat, 04 Apr 2026 01:14:45 GMT, and the checked bodies still surfaced 2026-04-04 09:05 JST wording before this source sync.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, the Kashinome Scholarship still reads as the annual mid-January to early-April window and continues to be handled as the 2026-04-09 must-arrive side route, Nakatani Foundation research grant = closed / next-cycle watch, and Secom General Research Grant = closed (2026-03-31 12:00 JST).
  • A fresh read-only Todoist audit still showed enough route coverage (items=206, projects=2), so no new task was added in this session.
  • This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while adding a bounded 11:04 JST front-door and playbook sync.

What still stays fixed after the 09:05 JST actual-pull reread on April 4, 2026

  • An actual-pull recheck at 2026-04-04 09:05 JST after mind-upload@e571567f017d, EEG-DATA@fbbb0d8c01e0, and auto-research-funds@d7f6fb9bc158 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas are still carry-forward rather than route replacement: mind-upload now just carries the earlier 08:07 JST route-hold sync on top of a recent pretraining-overlap audit, EEG-DATA still keeps 30,929 merged-unique rows, 28,892 high-confidence rows, 24,909 immediate rows, and 24,539 high-confidence immediate rows while treating OpenNeuro ds007020 as a limited rest-side support note and keeping HeartBEAM plus figshare EEG at rest and with TMS only as backup families, and auto-research-funds adds deeply reviewed April 4 scholarship updates while still keeping JGC-S only as an adjacent runway without displacing the practical shortlist.
  • Route-safe access wording therefore still stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors, and the next-watch family still stays D11 / D08 / D05 / D20.
  • Browser-level live checks in this run returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, mind-upload-eeg-rq60-grant-dataset-playbook.html, and the current-six row packets; the checked front-door headers now returned Last-Modified: Fri, 03 Apr 2026 23:18:55 GMT, and the checked bodies already surfaced 2026-04-04 08:07 JST wording. The current-six row packets returned Last-Modified: Sat, 04 Apr 2026 00:11:41 GMT and still surfaced 2026-04-04 01:04 JST wording before this source sync.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, the Kashinome Scholarship still reads as the annual mid-January to early-April window and continues to be handled as the 2026-04-09 must-arrive side route, Nakatani Foundation research grant = closed / next-cycle watch, and Secom General Research Grant = closed (2026-03-31 12:00 JST).
  • A fresh read-only Todoist audit still showed enough route coverage (items=206, projects=2), so no new task was added in this session.
  • This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while aligning the current-six row packets to the already-published front door.

What still stays fixed after the 08:07 JST actual-pull reread on April 4, 2026

  • An actual-pull recheck at 2026-04-04 08:07 JST after mind-upload@418c8f5d0ef9, EEG-DATA@dc6d833b83e9, and auto-research-funds@58d8738be5d5 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas are still carry-forward rather than route replacement: mind-upload tightens the front-door human-proxy comparison, EEG-DATA still keeps 30,929 merged-unique rows, 28,892 high-confidence rows, 24,909 immediate rows, and 24,539 high-confidence immediate rows while promoting HeartBEAM and figshare EEG at rest and with TMS only as backup families, and auto-research-funds adds the JGC-S foreign-student scholarship only as an adjacent runway without displacing the practical shortlist.
  • Route-safe access wording therefore still stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors, and the next-watch family still stays D11 / D08 / D05 / D20.
  • Browser-level live checks before this source sync still returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, mind-upload-eeg-rq60-grant-dataset-playbook.html, u13-2-brain-minus-prior-route.html, and u13-5-perception-to-recall-route.html; the checked headers now returned Last-Modified: Fri, 03 Apr 2026 22:10:18 GMT, and the checked bodies still surfaced 2026-04-04 01:04 JST wording before this source sync.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, the Kashinome Scholarship still reads as the annual mid-January to early-April window and continues to be handled as the 2026-04-09 must-arrive side route, Nakatani Foundation research grant = closed / next-cycle watch, and Secom General Research Grant = closed (2026-03-31 12:00 JST).
  • A fresh read-only Todoist audit still showed enough route coverage (items=206, projects=2, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, Keio graduate scholarship=2, G-7=1, ENEOS=1, Doumei=0, Kenkyu no Susume=0), so no new task was added in this session.
  • This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads, the newly strengthened HeartBEAM / TMS backup note, the adjacent-runway JGC-S no-op judgment, and the newer live public headers.

What still stays fixed after the 01:04 JST actual-pull reread on April 4, 2026

  • An actual-pull recheck at 2026-04-04 01:04 JST after mind-upload@9b6a8b971ba0, EEG-DATA@56d765da60b, and auto-research-funds@3c8569e28 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas are still carry-forward rather than route replacement: mind-upload now carries the earlier 00:06 JST route reread plus field-level artifact-stack disclosure tightening, EEG-DATA deepens the public OpenNeuro metadata for Numbers and PRIOS while still keeping 30,921 merged-unique rows, 28,884 high-confidence rows, 24,900 immediate rows, and 24,530 high-confidence immediate rows, and auto-research-funds adds current coverage for 搌盟è‚Č成䌚 and ç ”ç©¶ăźă™ă‚ă‚ć„šć­Šé‡‘ without displacing the practical shortlist.
  • Route-safe access wording therefore still stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors.
  • Browser-level live checks before this source sync still returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, mind-upload-eeg-rq60-grant-dataset-playbook.html, u13-2-brain-minus-prior-route.html, and u13-5-perception-to-recall-route.html; the checked headers returned Last-Modified: Fri, 03 Apr 2026 15:13:06 GMT, and the checked bodies still surfaced 2026-04-04 00:06 JST wording before this source sync.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive), Nakatani Foundation research grant = closed / next-cycle watch, and Secom General Research Grant = closed (2026-03-31 12:00 JST).
  • A fresh read-only Todoist audit still showed enough route coverage (items=206, projects=2, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, Keio graduate scholarship=2, G-7=1, ENEOS=1, ćŒç›ŸäŒš=0, ç ”ç©¶ăźă™ă‚ă‚=0), so no new task was added in this session.
  • This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the actual latest pulled heads, current live bodies, official windows, and Todoist sufficiency check.

What still stays fixed after the 00:06 JST actual-pull reread on April 4, 2026

  • An actual-pull recheck at 2026-04-04 00:06 JST after mind-upload@84d84fb5a82d, EEG-DATA@b468ecc5f8c0, and auto-research-funds@eccee095a939 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas are still carry-forward rather than route replacement: mind-upload now just carries the earlier 23:06 JST route reread addenda, EEG-DATA adds fast mapping semantic integration EEG dataset while summary.json now reports 30,921 merged-unique rows, 28,884 high-confidence rows, 24,900 immediate rows, and 24,530 high-confidence immediate rows, and auto-research-funds adds Iizuka current card and Korean legacy sync without replacing the practical shortlist.
  • Route-safe access wording therefore still stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors, and the next-watch family still stays D11 / D08 / D05 / D20.
  • Browser-level live checks before this source sync still returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, mind-upload-eeg-rq60-grant-dataset-playbook.html, u13-2-brain-minus-prior-route.html, and u13-5-perception-to-recall-route.html; the checked bodies still surfaced 22:04 JST on brief / bridge / U13-2 and 22:04/22:05 JST on issue rather than a new queue or claim.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive), Nakatani Foundation research grant = closed / next-cycle watch, and Secom General Research Grant = closed (2026-03-31 12:00 JST).
  • A fresh read-only Todoist audit still showed enough route coverage (items=206, projects=2, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, Keio graduate scholarship=2, G-7=1, ENEOS=1), so no new task was added in this session.
  • This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the actual latest pulled heads, live public bodies, official windows, and Todoist sufficiency check.

What still stays fixed after the 23:06 JST actual-pull reread on April 3, 2026

  • An actual-pull recheck at 2026-04-03 23:06 JST after mind-upload@ec7a7dd713e9, EEG-DATA@46f6b56c693c, and auto-research-funds@b3d3c531729a still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas are still carry-forward rather than route replacement: mind-upload now just carries the earlier 22:04 JST route-hold sync, EEG-DATA adds motion sickness and swallowing EEG datasets while summary.json now reports 30,920 merged-unique rows, 28,883 high-confidence rows, 24,899 immediate rows, and 24,529 high-confidence immediate rows, and auto-research-funds deepens KIRII / Pigeon / Nakato / Takashima scholarship coverage plus a 22:04 JST funding addendum without replacing the practical shortlist.
  • Route-safe access wording therefore still stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors.
  • Browser-level live checks before this source sync returned HTTP/2 200 for mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, mind-upload-eeg-rq60-grant-dataset-playbook.html, and the current-six row packets; those checked pages returned Last-Modified: Fri, 03 Apr 2026 13:18:48 GMT, the front-door pages plus U13-2 already surfaced 22:04 JST, and the other five row packets still surfaced the earlier 2026-04-02 / 23:08 JST hold note before this source sync.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive), Nakatani Foundation research grant = closed / next-cycle watch, and Secom General Research Grant = closed (2026-03-31 12:00 JST).
  • A fresh read-only Todoist audit still showed enough route coverage (items=206, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, Keio graduate scholarship=2, G-7=1, ENEOS=1), so no new task was added in this session.
  • The row-facing first artifacts therefore still stay the same: U13-2 = brain-minus-prior control table, U13-5 = perception-to-recall degradation note, U0-2 = offset/jitter + state-feature collapse audit, U0-3 = threshold-stability note + overfit-exclusion rule, U14-4 = filled Model Card / Dataset Card examples, and U14-2 = fixed-split rerun contract + negative-case trail.

What still stays fixed after the 22:04 JST actual-pull reread on April 3, 2026

  • An actual-pull recheck at 2026-04-03 22:04 JST after mind-upload@1ab35b64796f3936e525befb5d9428d789a16263, EEG-DATA@be3d03d1c286dcd37fb056317a693e47c39f7f3a, and auto-research-funds@845e6849a6c36e6e83394e32cf8dc4b5fe6fdc07 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled delta is now concentrated in EEG-DATA: summary.json reports 30,918 merged-unique rows, 28,881 high-confidence rows, 24,898 immediate rows, and 24,528 high-confidence immediate rows after the latest exhaustive refresh, while mind-upload and auto-research-funds now just carry their earlier 21:05 JST addenda without replacing the practical shortlist.
  • Route-safe access wording therefore still stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors.
  • Browser-level live checks before this source sync returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u13-2-brain-minus-prior-route.html; those checked pages returned Last-Modified: Fri, 03 Apr 2026 12:24:26 GMT, and their route-facing body wording already surfaced 21:05 JST on issue / brief / bridge while U13-2 still surfaced 21:05 JST and 11:07 JST.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, and the rest of the watch/closed reading stays unchanged from the 21:05 JST reread.
  • A fresh read-only Todoist audit still showed enough route coverage (items=205, projects=2, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, Keio graduate scholarship=2, G-7=1, ENEOS=0), so no new task was added in this session.
  • The row-facing first artifacts therefore still stay the same: U13-2 = brain-minus-prior control table, U13-5 = perception-to-recall degradation note, U0-2 = offset/jitter + state-feature collapse audit, U0-3 = threshold-stability note + overfit-exclusion rule, U14-4 = filled Model Card / Dataset Card examples, and U14-2 = fixed-split rerun contract + negative-case trail.

What still stays fixed after the 21:05 JST actual-pull reread on April 3, 2026

  • An actual-pull recheck at 2026-04-03 21:05 JST after mind-upload@3db1aa653b74d164c3a57b75677e345ea10356e0, EEG-DATA@c10c95274ecf1397768eb28de48aac8ce925c22d, and auto-research-funds@4a67e06b530bc742521f80fa5b13ccbe1115ebb9 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas are still carry-forward rather than route replacement: mind-upload now just carries the 20:05 JST route-hold addendum, EEG-DATA adds BDSP manual deep dives for missing EEG datasets while now reporting 30,914 merged-unique rows, 28,877 high-confidence rows, 24,896 immediate rows, and 24,526 high-confidence immediate rows, and auto-research-funds now just carries the 20:05 JST funding addendum without replacing the practical shortlist.
  • Route-safe access wording also stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors.
  • Browser-level live checks before this source sync returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u13-2-brain-minus-prior-route.html; those checked pages returned Last-Modified: Fri, 03 Apr 2026 11:17:44 GMT, and their route-facing body wording already surfaced the earlier 20:05 JST hold note on issue / brief / bridge while U13-2 still surfaced 11:07 JST.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive), Secom General Research Grant = closed (2026-03-31 12:00 JST), and Nakatani Foundation research grant = closed / next-cycle watch.
  • A fresh read-only Todoist api/v1/sync(items, projects) full-item audit still showed enough route coverage (items=205, projects=2, Nakatani family=11, G-7=1, ENEOS=0, Keio graduate scholarship=2), so no new task was added in this session.
  • The row-facing first artifacts therefore still stay the same: U13-2 = brain-minus-prior control table, U13-5 = perception-to-recall degradation note, U0-2 = offset/jitter + state-feature collapse audit, U0-3 = threshold-stability note + overfit-exclusion rule, U14-4 = filled Model Card / Dataset Card examples, and U14-2 = fixed-split rerun contract + negative-case trail.

What still stays fixed after the 20:05 JST actual-pull reread on April 3, 2026

  • An actual-pull recheck at 2026-04-03 20:05 JST after mind-upload@b4fd73d9e98301c918b57541704a95246d69ae09, EEG-DATA@649ff098ab577f11065562379150acea1aa07002, and auto-research-funds@7c1b835d1d138214f282dc85d2f06d9faa522310 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen support space rather than widen the active batch: mind-upload now splits human thermal evidence outside the current six into passive / task-linked macro thermometry and perturbation-conditioned thermal routes, EEG-DATA adds a restricted Transcranial Magnetic Stimulation in Alzheimer's disease-Data BDSP deep dive while now reporting 30,912 merged-unique rows, 28,875 high-confidence rows, and 24,894 directly usable rows, and auto-research-funds completes current-card coverage for ENEOS and G-7 scholarships while now reporting 8,600 aid IDs, 4,308 rows, and 3,959 official-source rows without replacing the practical shortlist.
  • Route-safe access wording also stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors.
  • Browser-level live checks before this source sync returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u13-2-brain-minus-prior-route.html; those checked pages returned Last-Modified: Fri, 03 Apr 2026 10:19:46 GMT, but their route-facing body wording still surfaced the earlier 11:05/11:07 JST hold note.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive), Secom General Research Grant = closed (2026-03-31 12:00 JST), and Nakatani Foundation research grant = closed / next-cycle watch.
  • A fresh read-only Todoist api/v1/sync(items, projects) full-item audit still showed enough route coverage (items=205, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1), so no new task was added in this session.
  • The row-facing first artifacts therefore still stay the same: U13-2 = brain-minus-prior control table, U13-5 = perception-to-recall degradation note, U0-2 = offset/jitter + state-feature collapse audit, U0-3 = threshold-stability note + overfit-exclusion rule, U14-4 = filled Model Card / Dataset Card examples, and U14-2 = fixed-split rerun contract + negative-case trail.

What still stays fixed after the 11:05 JST actual-pull reread on April 3, 2026

  • An actual-pull recheck at 2026-04-03 11:05 JST after mind-upload@f70432e4a6c8a52afafbc57b98c8f0e360c85d4e, EEG-DATA@1981d34c5f71deceb2549684db9173b6f54d2b89, and auto-research-funds@bfebe94da875d709756746285f133ef30905fd38 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still tighten support space rather than widen the active batch: mind-upload now tightens sleep replay integrity / physiology-gate wording outside the current six, EEG-DATA refreshes its inventory and deep-dives the COG-BCI family while now reporting 30,904 merged-unique rows, 28,867 high-confidence rows, and 24,890 directly usable rows, and auto-research-funds carries forward the 10:06 JST mind-upload funding addendum while now reporting 8,596 aid IDs, 4,308 rows, and 3,958 official-source rows without replacing the practical shortlist.
  • Route-safe access wording also stays unchanged: D10 remains the only clear public-open primary anchor in the current six while D03 / D02 / D01 remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors.
  • Browser-level live checks before this source sync returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u13-2-brain-minus-prior-route.html; those checked pages returned Last-Modified: Fri, 03 Apr 2026 01:31:28 GMT, but their route-facing body wording still surfaced the earlier 05:12 JST hold note.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive), Secom General Research Grant = closed (2026-03-31 12:00 JST), and Nakatani Foundation research grant = closed / next-cycle watch.
  • A fresh read-only Todoist api/v1/sync(items, projects) full-item audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.
  • The row-facing first artifacts therefore still stay the same: U13-2 = brain-minus-prior control table, U13-5 = perception-to-recall degradation note, U0-2 = offset/jitter + state-feature collapse audit, U0-3 = threshold-stability note + overfit-exclusion rule, U14-4 = filled Model Card / Dataset Card examples, and U14-2 = fixed-split rerun contract + negative-case trail.

What still stays fixed after the 05:12 JST actual-pull reread on April 3, 2026

  • An actual-pull recheck at 2026-04-03 05:12 JST after mind-upload@a9fc5d1cb691f3669c40803604e78cf87fab4eed, EEG-DATA@8c3ace28bad0b3bac259caa440994e5d05bfc7d1, and auto-research-funds@35756f8381c47daa24bb70bb7a1ff88d1dcf76bc still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still tighten support space rather than widen the active batch: mind-upload is now at a docs: sync github wiki export head that keeps the exported route mirrors aligned without changing the active queue, EEG-DATA carries forward a VR navigation dataset output refresh on top of a recent EESM17 metadata deepening while still keeping 30,900 merged-unique rows, 28,863 high-confidence rows, and 24,885 directly usable rows, and auto-research-funds adds JSPS overseas fellow current-card snapshots on top of a recent JSSF research publication refresh while now reporting 8,594 aid IDs, 4,307 rows, and 3,957 official-source rows without displacing the practical shortlist.
  • The route-safe access reading therefore still stays narrow: no newest pulled head turns D03 / D02 / D01 into immediate public anchors, so public-safe wording still keeps D10 as the only clear public-open primary anchor and keeps D03 / D02 / D01 as gated-support planning anchors.
  • Browser-level live checks in this run returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u13-2-brain-minus-prior-route.html; the checked headers now return Last-Modified: Thu, 02 Apr 2026 19:17:56 GMT, while the checked bodies still surfaced the earlier 04:05/04:06 JST hold note before this source sync.
  • Official window spot checks in this run still keep the practical bridge narrow: Kura Fund remains open (2026-02-02 - 2026-04-17 17:00), Nakatani Foundation graduate scholarship remains open (2026-04-01 - 2026-05-25 15:00), Kashinome Scholarship stays a student-runway side route (2026-01-14 - 2026-04-09 must arrive), Nakatani Foundation research grant remains closed / next-cycle watch (ć‹Ÿé›†ă‚’ç”‚äș†ă—ăŸă—ăŸ on the current public page), and Secom General Research Grant remains closed for the current cycle (2026-03-31 12:00 JST).
  • A fresh read-only Todoist api/v1/sync(items, projects) audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.
  • The row-facing first artifacts therefore still stay the same: U13-2 = brain-minus-prior control table, U13-5 = perception-to-recall degradation note, U0-2 = offset/jitter + state-feature collapse audit, U0-3 = threshold-stability note + overfit-exclusion rule, U14-4 = filled Model Card / Dataset Card examples, and U14-2 = fixed-split rerun contract + negative-case trail.

What still stays fixed after the 04:06 JST actual-pull reread on April 3, 2026

  • An actual-pull recheck at 2026-04-03 04:06 JST after mind-upload@f5e13ebdc4748ce683d905c37cabfdb3c53036bb, EEG-DATA@53f5c8166faf0d5fcebfb5c39741d4992eb82a39, and auto-research-funds@1f190fec93a9180a27443b1fe2b31f9488dfbf74 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still tighten support space rather than widen the active batch: mind-upload carries forward a BCSFB / human-proxy composition literature sync outside the current six, EEG-DATA keeps 30,900 merged-unique rows, 28,863 high-confidence rows, and 24,885 directly usable rows after a catalog refresh that does not replace any current anchor family, and auto-research-funds refreshes current-card and registry layers around Itoh domestic scholarship while now reporting 8,593 aid IDs, 4,306 rows, and 3,956 official-source rows without displacing the practical shortlist.
  • The route-safe access reading therefore still stays narrow: no newest pulled head turns D03 / D02 / D01 into immediate public anchors, so public-safe wording still keeps D10 as the only clear public-open primary anchor and keeps D03 / D02 / D01 as gated-support planning anchors.
  • Browser-level live checks in this run returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u13-2-brain-minus-prior-route.html; the checked headers now return Last-Modified: Thu, 02 Apr 2026 18:14:39 GMT.
  • Official window spot checks in this run still keep the practical bridge narrow: Kura Fund remains open (2026-02-02 - 2026-04-17 17:00), Nakatani Foundation graduate scholarship remains open (2026-04-01 - 2026-05-25 15:00), Kashinome Scholarship stays a student-runway side route (2026-01-14 - 2026-04-09 must arrive), Nakatani Foundation research grant remains closed / next-cycle watch (ć‹Ÿé›†ă‚’ç”‚äș†ă—ăŸă—ăŸ on the current public page), and Secom General Research Grant remains closed for the current cycle (2026-03-31 12:00 JST).
  • A fresh read-only Todoist api/v1/sync(items, projects) audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.
  • The row-facing first artifacts therefore still stay the same: U13-2 = brain-minus-prior control table, U13-5 = perception-to-recall degradation note, U0-2 = offset/jitter + state-feature collapse audit, U0-3 = threshold-stability note + overfit-exclusion rule, U14-4 = filled Model Card / Dataset Card examples, and U14-2 = fixed-split rerun contract + negative-case trail.

What still stays fixed after the 23:08 JST actual-pull reread on April 2, 2026

  • An actual-pull recheck at 2026-04-02 23:08 JST after mind-upload@f5d1d1dd1683, EEG-DATA@ee1463d28288, and auto-research-funds@ec24a355abbc still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route discipline and support space rather than the active claim surface: mind-upload clarifies the causal-versus-human-proxy bridge and local-route/proxy boundaries outside the current six, EEG-DATA refines EEG candidate curation and adds OpenNeuro ds007615 while now reporting 30,896 merged-unique rows, 28,859 high-confidence rows, and 24,882 directly usable rows in the current README snapshot, and auto-research-funds adds Geo-Kagaku current cards plus a README-stat refresh without displacing the practical shortlist.
  • The route-safe access reading therefore still stays narrow: no newest pulled head turns D03 / D02 / D01 into immediate public anchors, so public-safe wording still keeps D10 as the only clear public-open primary anchor and keeps D03 / D02 / D01 as gated-support planning anchors.
  • Browser-level live checks in this run returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u13-2-brain-minus-prior-route.html; the checked headers now return Last-Modified: Thu, 02 Apr 2026 13:12:21 GMT.
  • Official window spot checks in this run still keep the practical bridge narrow: Kura Fund remains open (2026-02-02 - 2026-04-17 17:00), Nakatani Foundation graduate scholarship remains open (2026-04-01 - 2026-05-25 15:00), Nakatani Foundation research grant remains closed / next-cycle watch (ć‹Ÿé›†æœŸé–“ 2025-06-01 - 2025-07-07), and Secom General Research Grant remains closed for the current cycle (2026-03-31 12:00 JST).
  • A fresh read-only Todoist api/v1/sync(items, projects) audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.
  • This source sync still does not widen the current public six. It only carries forward the same one-RQ-at-a-time batch onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check.

What still stays fixed after the 19:03 JST actual-pull reread on April 2, 2026

  • An actual-pull recheck at 2026-04-02 19:03 JST after mind-upload@e1a7e7e2f22c, EEG-DATA@a7f9390492fd, and auto-research-funds@00cdbaa9a122 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload now deepens the blood-CSF barrier / choroid-plexus route split on human neurovascular pages outside the current six, EEG-DATA still reports 30,892 merged-unique rows, 28,855 high-confidence rows, and 24,880 directly usable rows in the current README snapshot, and auto-research-funds still keeps its latest summary at 8,590 aid IDs, 4,301 rows, and 3,951 official-source rows without replacing the practical shortlist.
  • The route-safe access reading still stays narrow: D10 remains the only clear public-open primary anchor while D03 / D02 / D01 still stay gated-support anchors in public wording. A direct live-access reread still shows Subscription Required plus LOGIN TO ACCESS DATASET FILES on the current IEEE DataPort pages for those three support anchors.
  • Browser-level live checks before this source sync returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u7-2-timing-metric-route.html; the checked pages returned Last-Modified: Thu, 02 Apr 2026 09:37:54 GMT, but their route-facing body wording still surfaced the earlier 18:06 JST hold note.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive), Secom General Research Grant = closed (March 31, 2026 at 12:00 JST), and Nakatani Foundation research grant = closed / next-cycle watch.
  • A fresh read-only Todoist api/v1/sync(items, projects) full-item audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.
  • This source sync still does not widen the current public six. It only carries forward the same one-RQ-at-a-time batch onto the latest repo heads, live public headers, official windows, and Todoist sufficiency check while updating the route-hold wording to the latest pulled heads.

What still stays fixed after the 18:06 JST actual-pull reread on April 2, 2026

  • An actual-pull recheck at 2026-04-02 18:06 JST after mind-upload@85b6603b569b, EEG-DATA@a7f9390492fd, and auto-research-funds@b6c0d0f4eeb7 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload only syncs U7-2 public bridge wording, EEG-DATA deep-dives OSF gazx2 confidence EEG metadata and OpenNeuro ds007081 while now reporting 30,892 merged-unique rows, 28,855 high-confidence rows, and 24,880 directly usable rows in the current README snapshot, and auto-research-funds refreshes its README summary to 8,590 aid IDs, 4,301 rows, and 3,951 official-source rows without replacing the practical shortlist.
  • The route-safe access reading still stays narrow: D10 remains the only clear public-open primary anchor while D03 / D02 / D01 still stay gated-support anchors in public wording. A direct live-access reread still shows Subscription Required plus LOGIN TO ACCESS DATASET FILES on the current IEEE DataPort pages for those three support anchors.
  • Browser-level live checks before this source sync returned HTTP/2 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u7-2-timing-metric-route.html; the checked pages returned Last-Modified: Thu, 02 Apr 2026 08:22:50 GMT.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive), Secom General Research Grant = closed (March 31, 2026 at 12:00 JST), and Nakatani Foundation research grant = closed / next-cycle watch.
  • A fresh read-only Todoist api/v1/sync(items, projects) full-item audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.
  • This source sync still does not widen the current public six. It only carries forward the same one-RQ-at-a-time batch onto the latest repo heads, live public headers, official windows, and Todoist sufficiency check.

What still stays fixed after the 11:05 JST actual-pull reread on April 2, 2026

  • An actual-pull recheck at 2026-04-02 11:05 JST after mind-upload@208e59e2180c, EEG-DATA@00d85380f3fd, and auto-research-funds@f4ba35518400 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload refreshes the 10:07 route-hold packets, EEG-DATA deep-dives the maintained ChineseEEG-2 release plus the public auditory-eeg family while still reporting 30,887 merged-unique rows, 28,850 high-confidence rows, and 24,875 immediately usable rows, and auto-research-funds keeps the same practical shortlist. The new speech-side public-open material strengthens backup reading/listening alignment checks for U13-2/U13-5, but it does not replace D10 as the primary anchor or repair the recall-validity gap under U13-5.
  • The route-safe access reading still stays narrow: D10 remains the only clear public-open primary anchor while D03 / D02 / D01 still stay gated-support anchors in public wording. A direct live-access reread still shows Subscription Required plus LOGIN TO ACCESS DATASET FILES on the current IEEE DataPort pages for those three support anchors.
  • Browser-level live checks in this run returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html; the checked pages returned Last-Modified: Thu, 02 Apr 2026 01:22:44 GMT.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, Secom General Research Grant = closed (March 31, 2026 at 12:00 JST), and Nakatani Foundation research grant = next-cycle watch.
  • A fresh read-only Todoist api/v1/sync(items, projects) full-item audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.
  • This source sync only refreshes the route-hold wording and the speech-side support reading. It does not widen the current claim surface.

What still stays fixed after the 11:09 JST actual-pull reread on April 2, 2026

  • An actual-pull recheck at 2026-04-02 11:09 JST after mind-upload@208e59e2180c, EEG-DATA@00d85380f3f, and auto-research-funds@f4ba35518400 still leaves the public batch and the solve-first order unchanged.
  • The current mind-upload head is the earlier 10:07 route-hold packet refresh itself, while the newest upstream movement is on EEG-DATA: chore: deep-dive ChineseEEG-2 and PhysioNet auditory EEG. The refreshed summary still reports 30,887 merged-unique rows, 28,850 high-confidence rows, and 24,875 directly usable rows, and auto-research-funds keeps the same practical shortlist while its repository stats still read 8,585 aid IDs, 4,293 rows, and 3,943 official-source rows.
  • The route-safe access reading still stays narrow: D10 remains the only clear public-open primary anchor while D03 / D02 / D01 still stay gated-support anchors in public wording.
  • The new public-open adjuncts only tighten row-specific backup coverage rather than widen the batch: ds007591 and ds007602 strengthen speech-side backup options for U13-2 but still expose only three released participants each, ChineseEEG-2 strengthens public reading/listening alignment coverage for U13-5 but still does not expose the intended recall-labeled branch, and PhysioNet auditory-eeg is clearly public-open but remains single-day 4-channel coverage rather than a replacement for D02 in U0-2 / U0-3.
  • Browser-level live checks before this source sync still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html; the checked pages now returned Last-Modified: Thu, 02 Apr 2026 01:22:44 GMT.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, the Kashinome Scholarship official page still reads as the annual mid-January to early-April window, and Secom General Research Grant still shows the current cycle closed (March 31, 2026 at 12:00 JST).
  • A fresh read-only Todoist api/v1/sync(items, projects) full-item audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.
  • This source sync only refreshes the route-hold wording and the backup-family reading after the newest EEG-DATA carry-forward. It does not widen the current claim surface.

What still stays fixed after the 10:07 JST actual-pull reread on April 2, 2026

  • An actual-pull recheck at 2026-04-02 10:07 JST after mind-upload@be507c810b11, EEG-DATA@3f20f48cca6e, and auto-research-funds@fb32c05163f4 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload refines EEG foundation setup-equivalence boundaries outside the current six, EEG-DATA deep-dives the HBN EEG release 11 route and now reports 30,887 merged-unique rows, 28,850 high-confidence rows, and 24,871 directly usable rows, and auto-research-funds keeps the same practical shortlist while its repository stats still read 8,585 aid IDs, 4,293 rows, and 3,943 official-source rows.
  • The route-safe access reading still stays narrow: D10 remains the only clear public-open primary anchor while D03 / D02 / D01 still stay gated-support anchors in public wording. The row-level reading only tightens inside that unchanged batch: U13-5 still carries an explicit recall-validity caveat because the visible D03 metadata still does not expose a recall-specific label, and U14-4 / U14-2 still keep D13 as the first public-open rerun support family beyond the current D01 disclosure floor.
  • Browser-level live checks before this source sync still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html; the checked pages also returned Last-Modified: Thu, 02 Apr 2026 00:15:06 GMT.
  • This source sync also re-aligns the public-side row wording and the funding-facing 60RQ dossier wording to the same Dxx + DOI + dataset name + access class standard, so the public six now point into the same canonical row packets as the funding repo again.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, the Kashinome Scholarship official page still reads as the annual mid-January to early-April window, and Secom General Research Grant still shows the current cycle closed (March 31, 2026 at 12:00 JST).
  • A fresh read-only Todoist api/v1/sync(items, projects) full-item audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.
  • This source sync only refreshes the route-hold wording and the row-by-row dossier wording on the public entry pages. It does not widen the current claim surface.

What still stays fixed after the 09:05 JST actual-pull reread on April 2, 2026

  • An actual-pull recheck at 2026-04-02 09:05 JST after mind-upload@d7f30648fc40, EEG-DATA@ac8cc6fc8e74, and auto-research-funds@31ec17305f6a still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload tightens a literature myelin-route split outside the current six, EEG-DATA adds the aw8sz deep dive and now reports merged_unique=30886, high_confidence=28849, and access_counts_high.immediate=24500, and auto-research-funds carries forward the Aoi graduate scholarship / JSSF research grant merges plus a README-stat refresh to 8,585 aid IDs, 4,293 rows, and 3,943 official-source rows without changing the practical shortlist.
  • The route-safe access reading still stays narrow: D10 remains the only clear public-open primary anchor while D03 / D02 / D01 still stay gated-support anchors in public wording. A direct live-access reread still shows D03 / D02 / D01 behind IEEE DataPort login and subscription gates.
  • Browser-level live checks before this source sync still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html; the checked pages also returned Last-Modified: Wed, 01 Apr 2026 23:29:12 GMT, and the live pages still surfaced the earlier 04:09 JST / 03:08 JST reread notes before this source update.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, the Kashinome Scholarship official page still reads as the annual mid-January to early-April window, and Secom General Research Grant still shows the current cycle closed (March 31, 2026 at 12:00 JST).
  • A fresh read-only Todoist api/v1/sync(items, projects) full-item audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.
  • This source sync only refreshes the route-hold wording on the public entry pages. It does not widen the current claim surface.

What still stays fixed after the 03:08 JST actual-pull reread on April 2, 2026

  • An actual-pull recheck at 2026-04-02 03:08 JST after mind-upload@d391dbede29e, EEG-DATA@f9df9ba85a6, and auto-research-funds@95f804055809 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload splits ECM / PNN literature routes outside the current six, EEG-DATA adds two immediate-access deep-dive candidates (10.48804/NV4RGL and 10.7281/T1/B660D2) without replacing the current anchor family, and auto-research-funds adds Gakusho / NII funding merges plus a README-stat refresh without changing the practical shortlist.
  • The route-safe access reading still stays narrow: D10 remains the only clear public-open primary anchor while D03 / D02 / D01 still stay gated-support anchors in public wording.
  • Browser-level live checks before this source sync still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html; the checked pages also returned Last-Modified: Wed, 01 Apr 2026 17:27:08 GMT, and the live route order still named the same six in the same order.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, and Secom General Research Grant remains closed for the current cycle.
  • A fresh read-only Todoist api/v1/sync(items, projects) full-item audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.
  • This source sync only refreshes the route-hold wording on the public entry pages. It does not widen the current claim surface.

What still stays fixed after the 00:03 JST actual-pull reread on April 2, 2026

  • An actual-pull recheck at 2026-04-02 00:03 JST after mind-upload@cff3abab58e8, EEG-DATA@a885ef3f029d, and auto-research-funds@0f60872538dc still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload tightens deuterium operating-point wording outside the current six, EEG-DATA adds the DANDI 001187 deep dive and now reports merged_unique=30875, high_confidence=28838, and access_counts_high.immediate=24492, and auto-research-funds carries forward the Isono / Okabe scholarship refresh without changing the practical shortlist.
  • The route-safe access reading still stays narrow: D10 remains the only clear public-open primary anchor while D03 / D02 / D01 still stay gated-support anchors in public wording.
  • Browser-level live checks before this source sync still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html; the checked pages also returned Last-Modified: Wed, 01 Apr 2026 14:17:54 GMT, and the live route order still named the same six in the same order.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, and Secom General Research Grant remains closed for the current cycle.
  • A fresh read-only Todoist api/v1/sync(items, projects) full-item audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.

What still stays fixed after the 22:05 JST actual-pull reread on April 1, 2026

  • An actual-pull recheck at 2026-04-01 22:05 JST after mind-upload@84e5337, EEG-DATA@bbb8d6c63d7, and auto-research-funds@5ff33413e still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload clarifies clearance-route labels at the front door outside the current six, EEG-DATA refreshes deep-dive metadata while keeping merged_unique=30873, high_confidence=28836, access_counts_high.immediate=24487, and 18,312 / 28,832 experiment-facing rows (63.51% coverage), and auto-research-funds adds the Yamaoka graduate scholarship snapshot plus README-facing stats refresh without changing the practical shortlist.
  • The route-safe access reading still stays narrow: D10 remains the only clear public-open primary anchor while D03 / D02 / D01 still stay gated-support anchors in public wording.
  • Browser-level live checks before this source sync still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html; the checked pages also returned Last-Modified: Wed, 01 Apr 2026 12:13:54 GMT, and the live route order still named the same six in the same order.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, and Secom General Research Grant remains closed for the current cycle.
  • A fresh read-only Todoist api/v1/sync(items, projects) full-item audit still showed enough route coverage (items=203, projects=2, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.

What still stays fixed after the 18:05 JST actual-pull reread on April 1, 2026

  • An actual-pull recheck at 2026-04-01 18:05 JST after mind-upload@9984d0b, EEG-DATA@5fc1df00f07, and auto-research-funds@d7092c8e9 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload deepens wearable OPM / MEG route synchronization and measurement-stack clarification outside the current six, EEG-DATA adds a continuous-pursuit EEG BCI deep dive and now reports merged_unique=30873, high_confidence=28836, and access_counts_high.immediate=24486, its experiment-metadata report still covers 18,312 / 28,832 rows with at least one experiment-facing field (63.51% coverage), and auto-research-funds keeps the same practical shortlist after the recent carry-forward scholarship refresh.
  • The route-safe access reading still stays narrow: the refreshed local EEG-DATA catalog keeps widening, but the current public route still reads D10 as the only clear public-open primary anchor while D03 / D02 / D01 still stay gated-support anchors in public wording.
  • Browser-level live checks with a browser user agent still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html; the current Last-Modified header is Wed, 01 Apr 2026 08:22:51 GMT on those public surfaces, and the live issue.html paragraph still names the same six in the same order before this run's new addendum.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, and Secom General Research Grant remains closed for the current cycle (March 31, 2026 at 12:00 JST).
  • A fresh read-only Todoist api/v1/sync(items) full-item audit still showed enough route coverage (items=203, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.

What still stays fixed after the 17:06 JST actual-pull reread on April 1, 2026

  • An actual-pull recheck at 2026-04-01 17:06 JST after mind-upload@c5a0550, EEG-DATA@82893f6ca6e, and auto-research-funds@ec6f7d068 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload deepens astrocyte PET route splits outside the current six, EEG-DATA deep-dives the KMI EEG dataset and now reports merged_unique=30871, high_confidence=28834, and access_counts_high.immediate=24484, its experiment-metadata report still covers 18,312 / 28,832 rows with at least one experiment-facing field (63.51% coverage), and auto-research-funds adds the Megachips 2026 scholarship snapshot plus a README-stat refresh without changing the practical shortlist.
  • The route-safe access reading still stays narrow: the refreshed local EEG-DATA catalog still shows D03 / D02 as catalog-side immediate rows and D01 as a mixed immediate/check-needed pair, but the live-access read remains stricter, so D10 remains the only clear public-open primary anchor while D03 / D02 / D01 still stay gated-support anchors in public wording.
  • Browser-level live checks with a browser user agent still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html; the current Last-Modified header is Wed, 01 Apr 2026 07:16:09 GMT on those public surfaces, and the live issue.html paragraph still names the same six in the same order.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, and Secom General Research Grant remains closed for the current cycle (March 31, 2026 at 12:00 JST).
  • A fresh read-only Todoist api/v1/sync(items) full-item audit still showed enough route coverage (items=203, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.

What still stays fixed after the 14:09 JST actual-pull reread on April 1, 2026

  • An actual-pull recheck at 2026-04-01 14:09 JST after mind-upload@ccef40f2f7cf, EEG-DATA@deefd5f95c6d, and auto-research-funds@f5f76c485ccb still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload clarifies presynaptic release-machinery ceilings outside the current six, EEG-DATA deepens Mendeley EEG metadata and now reports merged_unique=30869, high_confidence=28832, and access_counts_high.immediate=24482, its new experiment-metadata report now covers 18,312 / 28,832 rows with at least one experiment-facing field (63.51% coverage), and auto-research-funds refreshes repo-level stats without changing the practical shortlist.
  • The route-safe access reading still stays narrow: the refreshed local EEG-DATA catalog still shows D03 / D02 as catalog-side immediate rows and D01 as a mixed immediate/check-needed pair, but the live-access read remains stricter, so D10 remains the only clear public-open primary anchor while D03 / D02 / D01 still stay gated-support anchors in public wording.
  • Browser-level live checks with a browser user agent still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html; the current Last-Modified header is Wed, 01 Apr 2026 04:20:02 GMT on those public surfaces, and the live issue.html paragraph still names the same six in the same order.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, and Secom General Research Grant remains closed for the current cycle (March 31, 2026 at 12:00 JST).
  • A fresh read-only Todoist api/v1/sync(items) full-item audit still showed enough route coverage (items=203, Kura=2, Nakatani family=11, Nakatani graduate scholarship=5, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.

What still stays fixed after the 12:06 JST actual-pull reread on April 1, 2026

  • A second actual-pull recheck at 2026-04-01 12:06 JST after mind-upload@9f4bc8e760b1, EEG-DATA@1324f9e1ae2b, and auto-research-funds@6548b1650535 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload already keeps the route-hold wording public-safe, EEG-DATA now reports merged_unique=30867, high_confidence=28830, and access_counts_high.immediate=24480, and auto-research-funds refreshes funding reread documentation without changing the practical shortlist.
  • The route-safe access reading still stays narrow: D10 remains the only clear public-open primary anchor, while D03 / D02 / D01 still stay gated-support anchors because the live-access read remains stricter than the catalog label.
  • Browser-level live checks with a browser user agent still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html; the current Last-Modified header is Wed, 01 Apr 2026 02:26:28 GMT on those public surfaces, and the live issue.html paragraph still names the same six in the same order.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, and Secom General Research Grant remains closed for the current cycle.
  • No new Todoist route was introduced in this reread. The latest canonical funding-shortlist audit still already covers the current practical lanes, and the official recheck did not surface a new current-cycle funder.

What still stays fixed after the 11:06 JST actual-pull reread on April 1, 2026

  • A latest actual-pull recheck at 2026-04-01 11:06 JST after mind-upload@aa21ab9855c1, EEG-DATA@cccd137a3468, and auto-research-funds@3a691196cb9f still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still deepen route support rather than the current claim surface: mind-upload already keeps the route-hold wording public-safe, EEG-DATA deepens repository-wide metadata and now reports merged_unique=30866, high_confidence=28829, and access_counts_high.immediate=24479, and auto-research-funds refreshes repo-level stats without changing the practical shortlist.
  • The route-safe access reading still stays narrow: D10 remains the only clear public-open primary anchor, while D03 / D02 / D01 still stay gated-support anchors because the live-access read remains stricter than the catalog label.
  • Browser-level live checks still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html; Last-Modified advanced to Wed, 01 Apr 2026 01:21:12 GMT for issue.html / u8-1 and Wed, 01 Apr 2026 01:21:13 GMT for the two bridge pages, and the live issue.html paragraph still names the same six in the same order.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, while Nakatani Foundation research grant, Secom General Research Grant, and Brain Science Foundation research grant remain watch-or-closed outside the current-cycle lane.
  • A fresh read-only Todoist api/v1/sync(items) full-item audit still showed enough route coverage (items=203, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.

What still stays fixed after the 03:09 JST actual-pull reread on April 1, 2026

  • A latest actual-pull recheck at 2026-04-01 03:09 JST after mind-upload@31835fcd8daa, EEG-DATA@12eef8ca4ef0, and auto-research-funds@040e5b8798fd still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still widen route support rather than the current claim surface: mind-upload split temporal routes for invasive language BCIs outside the current public-six packet, EEG-DATA added a semantic-text-relevance deep dive that widens language-related backup coverage without displacing D10 / D03 / D02 / D01, and auto-research-funds refreshed Obayashi / Yokogaku cards without changing the practical current shortlist.
  • Browser-level live checks at 2026-04-01 03:09 JST still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, mind-upload-rq-solvability-bridge.html, and u8-1-closed-loop-delay-tolerance-route.html, and the live issue.html paragraph still names the same six in the same order.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, while Nakatani Foundation research grant and Secom General Research Grant remain closed/watch outside the current-cycle lane.
  • A fresh read-only Todoist api/v1/sync(items) full-item audit still showed enough route coverage (items=203, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1, AI for Aging-Society Problem Solving=0), so no new task was added in this session.

What still stays fixed after the 01:06 JST live-source recheck on April 1, 2026

  • A second no-op actual-pull recheck at 2026-04-01 01:06 JST after nested mind-upload@8da02e2e48e0, EEG-DATA@e6013384fa01, and auto-research-funds@c6a383f07a7b still leaves the public batch and the solve-first order unchanged.
  • The current EEG-DATA head still supports the same bounded route rather than replacing it: the current-six family D10 / D03 / D02 / D01 and the outside-current-six family D11 / D08 / D05 / D20 are all still present in the repo, and public-safe wording still keeps D10 as the only clear public-open primary while D03 / D02 / D01 stay gated-support anchors because the live-access read remains stricter than the catalog label.
  • Browser-level live checks at 2026-04-01 01:06 JST still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, u8-1-closed-loop-delay-tolerance-route.html, and mind-upload-rq-solvability-bridge.html, so this run still keeps the public batch fixed.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, while Nakatani Foundation research grant, Secom General Research Grant, and Brain Science Foundation research grant remain watch-or-closed outside the current-cycle lane.
  • A fresh read-only Todoist api/v1/sync full-item audit still showed enough route coverage (items=204, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1), so no new task was added in this session.

What still stays fixed after the 00:12 JST actual-pull reread on April 1, 2026

  • A latest actual-pull recheck at 2026-04-01 00:12 JST after mind-upload@e53a50b1256d, EEG-DATA@48f4814db5da, and auto-research-funds@76145d0e3f4c still leaves the public batch and the solve-first order unchanged.
  • The current EEG-DATA head still supports the same bounded route rather than replacing it: the current-six family D10 / D03 / D02 / D01 and the outside-current-six family D11 / D08 / D05 / D20 are all still present in the repo, but public-safe wording continues to keep D10 as the only clear public-open primary while D03 / D02 / D01 stay gated-support anchors because the live-access read still remains stricter than the catalog label.
  • Browser-level live checks at 2026-04-01 00:15 JST still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, and u8-1-closed-loop-delay-tolerance-route.html, so this run keeps the public batch fixed and adds only a short reread note to the supporting route pages.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, while Nakatani Foundation research grant, Secom General Research Grant, and Brain Science Foundation research grant remain watch-or-closed outside the current-cycle lane.
  • A fresh read-only Todoist api/v1/sync full-item audit still showed enough route coverage (items=204, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1), so no new task was added in this session.

What still stays fixed after the 21:09 JST post-pull reread on March 31, 2026

  • A latest pull recheck at 2026-03-31 21:09 JST after mind-upload@ed6f8203e46d, EEG-DATA@20fbbad9959f, and auto-research-funds@77f189662745 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still widen support rather than the current public claim surface: mind-upload tightened dataset-benchmark object rules and clarified the FAQ RNA route split, EEG-DATA added request-gated HBUED emotion-recognition coverage plus a continuous-pursuit online BCI metadata deep dive, and auto-research-funds added Teraura Sayoko outbound scholarship, Gakusho scholarship, and README-stat refreshes, but none of those changes replace the current D10 / D03 / D02 / D01 family or the outside-current-six order U7-1 -> U1-2 -> U4-2 -> U8-1.
  • Browser-level live checks at 2026-03-31 21:09 JST still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, and u8-1-closed-loop-delay-tolerance-route.html, and the live issue.html paragraph still names the current six in the same order.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, while Nakatani Foundation research grant, Secom General Research Grant, and Brain Science Foundation research grant remain outside the current-cycle lane.
  • A fresh read-only Todoist api/v1/sync full-item audit still showed enough route coverage (items=205, Kura=2, Nakatani family=11, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1), so no new task was added in this session.

What still stays fixed after the 19:07 JST post-pull reread on March 31, 2026

  • A latest pull recheck at 2026-03-31 19:07 JST after mind-upload@b7b6c0498ae1, EEG-DATA@24e85cc20f09, and auto-research-funds@0fddd53bd03c still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still widen support rather than the current public claim surface: mind-upload strengthened the front-door human-proxy split, EEG-DATA refreshed the catalog to merged_unique=30860, high_confidence=28823, and access_counts_high.immediate=24471, and auto-research-funds refreshed Kioxia/Takayanagi funding records, but none of those changes replace the current D10 / D03 / D02 / D01 family or the outside-current-six order U7-1 -> U1-2 -> U4-2 -> U8-1.
  • Browser-level live checks at 2026-03-31 19:09 JST still returned 200 for issue.html and mind-upload-current-public-six-rq-brief.html, and the live issue.html paragraph still names the current six in the same order.
  • Official window spot checks still keep the practical bridge narrow: Kura Fund = 2026-02-02 - 2026-04-17 17:00, Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, Kashinome Scholarship = 2026-01-14 - 2026-04-09, while Nakatani Foundation research grant and Secom General Research Grant are already closed for the current cycle.
  • A fresh read-only Todoist full-item audit still showed enough route coverage (items=205, Kura=2, Nakatani family=11, Nakatani graduate scholarship=7, Kashinome=2, Secom=3, Brain Science Foundation=8, Okawa=2, Japan Industrial Science Research Institute=1), so no new task was added in this session.

What still stays fixed after the 17:06 JST post-pull reread on March 31, 2026

  • A latest pull recheck at 2026-03-31 17:06 JST after mind-upload@4731680627ff, EEG-DATA@3e7a53d9ca8, and auto-research-funds@ef2924014a65 still leaves the public batch and the solve-first order unchanged.
  • The newest EEG-DATA additions widen the support map rather than the current route: the NTU Dataverse adult-to-infant unidirectional neural-coupling raw/preprocessed releases are immediately downloadable and useful for future social-learning or paired-observer rows, while OpenNeuro ds007146 adds a large auditory MEG/EEG/Ear-EEG record that still stays uncertain_public because the visible public object tree does not yet verify the claimed raw EEG / Ear-EEG coverage.
  • Recounting the ### Ux-y headings in the RQ-by-RQ dossiers still returns 60, so this run does not widen the queue by collapsing rows together.
  • Browser-level live checks with a browser user agent still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, and u8-1-closed-loop-delay-tolerance-route.html.
  • The practical reading therefore still stays narrow: Kura Fund, Nakatani Foundation graduate scholarship, and Kashinome Scholarship remain the active bridge for the current six, Secom General Research Grant is already closed for the current cycle (March 31, 2026 at 12:00 JST) and stays only as a carried-forward watch record, and no new Todoist item was created in this session.

What still stays fixed after the 16:05 JST post-pull reread on March 31, 2026

  • A latest pull recheck at 2026-03-31 16:05 JST after mind-upload@a11240d38415, EEG-DATA@f318ac8ce42d, and auto-research-funds@c95cc61fdfc9 still leaves the public batch and the solve-first order unchanged.
  • The newest pulled deltas still do not widen the current public claim surface: mind-upload tightened the connectome / timing-state route cards, EEG-DATA added an OSF eucqf deep-dive refresh, and auto-research-funds added new Takeda / Nohken card material, but none of those changes replace the current D10 / D03 / D02 / D01 family or the outside-current-six order U7-1 -> U1-2 -> U4-2 -> U8-1.
  • Browser-level live checks in this run still returned 200 for issue.html, mind-upload-current-public-six-rq-brief.html, and u8-1-closed-loop-delay-tolerance-route.html, so this run does not add new prose to the public site.
  • A fresh Todoist api/v1/sync(items) full-item audit still shows the route families already covered (items=205, Kura=2, Nakatani family=11, Kashinome=2, Secom family=3), so no new task was added in this run.
  • The practical reading therefore stays unchanged: Kura Fund, Nakatani Foundation graduate scholarship, and Kashinome Scholarship remain the active narrow bridge for the current six, while Secom General Research Grant and Nakatani Foundation research grant stay next-cycle watch routes only.

What stays fixed on March 31, 2026

  • A March 31 post-pull recheck at 2026-03-31 09:04 JST after mind-upload@8cc3379, EEG-DATA@715ecdf, and auto-research-funds@6166f60 still leaves the public batch and the solve-first order unchanged.

  • The newest pulled deltas widen the map but do not widen the current public claim surface: the astrocyte / SV2A route refinements, the U1-2 funding-sync packet, and the Zenodo HEP ERP deep-dive additions do not replace D10 or turn D03/D02/D01 into immediate public anchors.

  • The outside-current-six headline queue of four also stays unchanged: U7-1 remains the cleanest public-open A-tier follow-up, U1-2 remains the next narrow inverse-estimation packet, U4-2 remains the minimal causal-intervention packet, and U8-1 remains the bounded closed-loop delay-tolerance packet. U7-2 now sits explicitly beside U7-1 as the adjacent timing-metric support packet rather than as a headline-queue replacement. If you want the exact row packets, continue with the U7-1 route packet, the U7-2 route packet, the U1-2 route packet, the U4-2 route packet, and the U8-1 route packet.

  • At 2026-03-31 00:04 JST, an overnight recheck still leaves the public batch and the solve-first order unchanged.

  • A March 31 access audit at 2026-03-31 00:20 JST still leaves the batch unchanged, but it narrows the anchor reading: D10 3M-CPSEED remains the only clearly public-open primary anchor in the current six.

  • D03 Multimodal Fusion EEG + Eye-Tracking, D02 CSTE, and D01 Acquisition delay of wireless EEG currently resolve to IEEE DataPort pages that show LOGIN TO ACCESS DATASET FILES and Subscription Required, so public wording now keeps them only as subscription-gated support anchors rather than immediate public anchors.

  • When the live access audit and the catalog auto-label disagree, this page follows the live access audit for public-safe wording and keeps the catalog label only as a planning hint.

  • Kura Fund remains open through April 17, 2026 at 17:00, Nakatani Foundation graduate scholarship runs April 1, 2026 through May 25, 2026 at 15:00, and Kashinome Scholarship remains open through April 9, 2026.

  • A March 31 official-window recheck at 2026-03-31 14:07 JST leaves the practical lanes unchanged, but it does move one clock-sensitive item: the Secom General Research Grant is no longer a same-day watch in this run because the March 31, 2026 12:00 JST deadline has already passed, so it now stays only as a next-cycle watch record.

  • A March 31 14:07 JST Todoist full-item audit via api/v1/sync still shows the current route already covered (items=205, Kura=2, Nakatani family=11, Kashinome=2, Secom family=3), so no new task was added in this run.

  • Earlier March 30 notes on this page that treated D03/D02/D01 as immediate public routes should now be read as superseded by the March 31 access audit.

  • A March 31 cross-repo synthesis also rechecked public-open alternative EEG families for the current six. Those alternatives remain useful as secondary support, but they still do not displace the current D10/D03/D02/D01 route family or raise the public claim ceiling.

  • The current row packets now also expose one compact first-pass KPI bundle + stop rule per row, so readers can see what would stop the route before the claim widens.

  • The public batch stays U13-2 / U13-5 / U0-2 / U0-3 / U14-4 / U14-2.

  • The execution order stays U13-2 -> U13-5 -> U0-2 -> U0-3 -> U14-4 -> U14-2.

  • D10 3M-CPSEED remains the only clearly public-open primary anchor.

  • D03 Multimodal Fusion EEG + Eye-Tracking, D02 CSTE, and D01 Acquisition delay of wireless EEG remain in scope only as subscription-gated support anchors.

  • Kura Fund remains open through April 17, 2026, Nakatani Foundation graduate scholarship runs April 1, 2026 through May 25, 2026 at 15:00, Kashinome Scholarship remains open through April 9, 2026, and Secom General Research Grant is already closed for the current cycle (deadline: March 31, 2026 at 12:00 JST) so it stays only as a next-cycle watch record.

Row packets after the March 30 post-pull reread

The route is unchanged, but each active row now also carries one submission-ready title, one explicit reason why the present EEG anchor is enough for a first artifact, one compact KPI bundle, and one explicit stop rule that keeps the claim narrow.

RQ Submission-ready title Why the current EEG anchor is enough now Funding bridge that still fits Why the public claim still stays narrow
U13-2 Neural-contribution audit for imagined speech with a brain-minus-prior control D10 3M-CPSEED still gives a public OpenNeuro route with overt, silent-intended, and imagined speech inside one release, so a decoder can be tested against a bounded brain-minus-prior control family instead of a pure language prior. Kura Fund, then Nakatani Foundation graduate scholarship This can separate a narrow decoding artifact from a prior-only shortcut, but it does not establish preserved internal mechanism, preserved identity, or successful mind preservation.
U13-5 Perception-to-recall transfer-gap benchmark for mimic separation D03 Multimodal Fusion EEG + Eye-Tracking still fixes the intended paired EEG + gaze planning route, but the visible IEEE DataPort metadata is a 55-student cognitive-load dataset with Chinese column guidance and no recall-specific label exposed on the public page, so this row stays only as a gated planning anchor plus an external recall-validity requirement. Kura Fund, then Nakatani Foundation graduate scholarship A shared decoder route can support a bounded transfer-gap note, but it does not by itself justify a stronger preserved-mechanism reading.
U0-2 Temporal-validity-aware identity drift audit with offset, jitter, and state-feature collapse D02 CSTE still fixes the intended cross-session / cross-task biometric floor, but the current IEEE DataPort page is subscription-gated, so public wording treats it as a gated support anchor rather than an immediate public anchor. Nakatani Foundation graduate scholarship, then Kashinome Scholarship This can audit timing and state-feature failure, but it does not settle legal, philosophical, or normative identity continuity.
U0-3 Task-specific threshold stability and overfit-exclusion benchmark for identity drift The same D02 anchor still fixes the intended threshold-governance floor, but public wording now keeps it only as a subscription-gated support anchor rather than a public-open anchor. Nakatani Foundation graduate scholarship, then Kashinome Scholarship A stable threshold can still remain only a bounded benchmark artifact, not a sufficient condition for personhood continuity or branch-identity resolution.
U14-4 Card-integrated reproducibility contract for the current public batch D01 Acquisition delay of wireless EEG still marks the intended latency/disclosure floor, but the visible package is a latency-and-synchronization dataset rather than a rerun benchmark by itself, so the row stays only as a gated support route and needs D13 before stronger public reproducibility wording. Kura Fund; Nakatani Foundation research grant as next-cycle watch Filled card fields can improve disclosure discipline, but they do not by themselves demonstrate field-wide reproducibility, deployment readiness, or standards adoption.
U14-2 Fixed-split rerun contract for exploration versus confirmation The same D01 route still marks the intended latency-first split boundary, but the visible package is delay/synchronization-heavy, so public wording keeps it only as a gated support anchor and still needs D13-backed rerun examples before stronger confirmatory wording. Kura Fund; Nakatani Foundation research grant as next-cycle watch A fixed split and negative-case trail can bound rerun discipline, but they do not license confirmatory wording for exploratory outputs or broad rerun-robustness claims.

Current public six at a glance

RQ Current question focus Current anchor First artifact to close next Current funding bridge Keep outside the public claim
U13-2 Connect hallucination / inconsistency checking to neural decoding evaluation. D10 3M-CPSEED (10.18112/openneuro.ds006465.v2.0.0, immediate) Brain-minus-prior control table and mimic-separation note Kura Fund, then Nakatani Foundation graduate scholarship Preserved internal mechanism, preserved identity, or successful mind preservation
U13-5 Freeze where performance branches between perception and recall under a shared decoder. D03 Multimodal Fusion EEG + Eye-Tracking (10.21227/6106-6120, subscription-gated support) Perception-to-recall degradation note and transfer-gap table Kura Fund, then Nakatani Foundation graduate scholarship Any stronger mechanism-preservation reading
U0-2 Fix the timing budget before identity-like wording absorbs measurement error. D02 CSTE (10.21227/j162-nh61, subscription-gated support) Offset/jitter distribution and state-feature collapse audit Nakatani Foundation graduate scholarship, then Kashinome Scholarship Legal, philosophical, or normative identity continuity
U0-3 Fix threshold stability only after the timing floor is bounded. D02 CSTE (10.21227/j162-nh61, subscription-gated support) Threshold-stability note and overfit-exclusion rule Nakatani Foundation graduate scholarship, then Kashinome Scholarship Treating a stable threshold as sufficient for personhood continuity
U14-4 Turn card fields into a concrete rerun checklist. D01 Acquisition delay of wireless EEG (10.21227/dv1p-vq18, subscription-gated support) Filled Model Card / Dataset Card examples Kura Fund; Nakatani Foundation research grant as next-cycle watch Field-wide reproducibility, deployment readiness, or standards adoption
U14-2 Make the exploration / confirmation split operational. D01 Acquisition delay of wireless EEG (10.21227/dv1p-vq18, subscription-gated support) Fixed-split rerun contract and negative-case trail Kura Fund; Nakatani Foundation research grant as next-cycle watch Presenting exploratory outputs as confirmatory evidence

How to deepen this batch without flattening it

  • U13-2 -> U13-5 is still the speech-side contribution stack: first keep brain-minus-prior honest on D10, then ask where the transfer route breaks when the row moves from perception to recall.
  • U0-2 -> U0-3 is still the identity-drift floor: first bound timing error on the D02 route, then ask whether the threshold survives once the timing floor is fixed. The least-distorting public-open stress tests remain ds004148 and ds007216, but they still stay backup-only.
  • U14-4 -> U14-2 is still the reproducibility-contract stack: first turn disclosure fields into filled cards on the D01 floor, then freeze the exploration-versus-confirmation split. D13 remains the first public-open rerun family those two rows would need next.
  • U7-1 -> U7-2 -> U1-2 now sits just outside the batch as the public-open infrastructure floor: D11 keeps the synchronization contract readable in public, the adjacent U7-2 packet fixes which timing errors become release-block metrics on that same D11 family, and D08 keeps the inverse-uncertainty route grounded without forcing a batch switch.

First-pass KPI bundle and stop rule sync

This run does not widen the batch. It only makes the current public six explicit enough that each active row now has one KPI bundle and one stop rule before the route is widened or moved into stronger wording.

RQ First-pass KPI bundle Stop rule before the row can widen
U13-2 semantic alignment, brain-minus-prior gap, misalignment rate Stop if the brain-minus-prior gap collapses toward a prior-only baseline or if misalignment rate stays unstable across sessions.
U13-5 perception-to-recall degradation point, transfer gap, control-condition stability Stop if the degradation point and the transfer gap fail to stay ordered after the control-family rerun.
U0-2 clock-offset p95, jitter p95, state-feature collapse rate Stop if re-synchronization does not shrink the drift floor or if state-feature collapse rate remains above the bounded ceiling across sessions.
U0-3 session-out AUC, threshold stability, overfit-exclusion rate Stop if the threshold order flips across sessions or if accepted models remain split-specific after the overfit screen is applied.
U14-4 required-card fill rate, rerun success rate, leak-audit coverage Stop if fuller cards do not improve rerun traceability or if leak-audit fields remain missing in negative-case examples.
U14-2 fixed-split compliance rate, rerun success rate, explore-to-confirm carryover gap Stop if split violations remain necessary to preserve the result or if the explore-to-confirm carryover gap collapses on rerun.

What each row can and cannot solve with EEG right now

RQ EEG-DATA fact that keeps the row real What EEG can close now What still needs outside support Submission wording that stays honest
U13-2 D10 still gives 20 participants x 4 sessions, overt / silent-intended / imagined speech, raw BIDS, and phase-split derivatives inside one public release. A bounded brain-minus-prior audit plus a mimic-separation note. An external language-evaluation layer, a broader leak-control family, and any claim about preserved mechanism or identity. Neural-contribution audit for imagined speech with a brain-minus-prior control
U13-5 D03 still fixes the intended paired EEG + gaze planning route, but the visible IEEE DataPort metadata is a 55-student cognitive-load dataset with Chinese column guidance and no recall-specific label exposed on the public page, so the row now stays only as a gated planning anchor. A perception-to-recall degradation note and a transfer-gap table. An external recall-validity layer, a public-open EEG+ET backup family, and any stronger mechanism-preservation wording. Perception-to-recall transfer-gap benchmark for mimic separation
U0-2 D02 still fixes the intended cross-session / cross-task biometric floor, but the current IEEE DataPort page is subscription-gated, so public wording keeps it only as a gated support anchor. An offset / jitter distribution plus a state-feature collapse audit. Longer-horizon timing logs, larger cohorts, and any legal or philosophical continuity interpretation. Temporal-validity-aware identity-drift audit
U0-3 The same D02 route still fixes the intended threshold-governance floor, but the current IEEE DataPort page is subscription-gated, so public wording keeps it only as a gated support anchor. A threshold-stability note and an overfit-exclusion rule. A session-external rerun pack, cohort extension, and any personhood-continuity reading. Task-specific identity-threshold stability study
U14-4 D01 still marks the intended latency/disclosure floor, but the visible package is a latency-and-synchronization dataset rather than a rerun benchmark by itself, so the row now stays only as a gated support route. Filled Model Card / Dataset Card examples for the current batch. D13-backed rerun examples, leak-audit exemplars, and any field-wide reproducibility or standards-adoption wording. Disclosure-first reproducibility contract package
U14-2 The same D01 latency-first route still marks the intended split boundary, but the visible package is delay/synchronization-heavy rather than a stand-alone rerun family, so the row now stays only as a gated support route. A fixed-split rerun contract and a negative-case trail. D13-backed split-violation examples across richer public benchmarks and any stronger confirmatory-readiness claim. Exploration-confirmation split contract for reruns

Best public-open support family when the main anchor is gated

These support families do not replace the current gated-support planning anchors. They only show the cleanest public-open backup family for readers who want to inspect what can still be stress-tested without access-gated datasets.

RQ Best public-open support family Why it helps Why it still does not replace the current planning anchor
U13-5 D10 3M-CPSEED, ChineseEEG-2, ZuCo 2.0, SparrKULee, and spoken + imagined robot-speech EEG D10 keeps the speech-side control family public-open, ChineseEEG-2 adds a maintained reading/listening semantic-alignment family, ZuCo 2.0 restores a public EEG+ET paired-stream family, SparrKULee adds a larger auditory-only decoding benchmark, and the robot-speech route keeps overt/imagination stress tests inspectable without a gated page. None of them exposes a clean recall-labeled branch point on the public route, so they remain backup-only until recall validity is fixed.
U0-2 A test-retest resting and cognitive state EEG dataset, then A multi-session simultaneous EEG-fMRI dataset with online experience sampling They give the strongest public-open retest ladder and the strongest public-open multi-session provenance ladder. They are strong stress-test families, but they do not replace the direct cross-session / cross-task biometrics framing that keeps D02 primary in planning.
U0-3 A test-retest resting and cognitive state EEG dataset, then A multi-session simultaneous EEG-fMRI dataset with online experience sampling They give the cleanest public-open rerun ladder for checking whether the threshold rule survives outside one session or one preprocessing path. They still do not match the intended identity-drift floor as directly as D02, so they remain support rather than replacement.
U14-4 D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications, then D08 Simultaneous human intracerebral stimulation and HD-EEG D13 is the first required public-open rerun family before stronger disclosure wording, and D08 is the clearest grounded validation-field family after that. They are useful only after the first latency/disclosure floor is fixed; neither replaces D01, but D13 is the support family the row would need next.
U14-2 D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications, then D08 Simultaneous human intracerebral stimulation and HD-EEG D13 is the first required public-open split-violation example family, and D08 gives a stronger validation-style failure family after that. They help widen rerun examples later, but they do not replace the latency-first split boundary that keeps D01 primary in planning.

Row-by-row brief

U13-2

  • Question focus: whether hallucination and consistency checks can be connected to neural decoding evaluation without treating decoder success as a mind-preservation result.
  • Why D10 stays the strongest anchor: the local mirror still exposes a public OpenNeuro route with 20 participants x 4 sessions, overt, silent-intended, and imagined speech inside the same release, plus raw BIDS and phase-split derivatives.
  • What this anchor is strong enough to close now: a brain-minus-prior control family, a narrow mimic-separation note, and a bounded inconsistency audit.
  • Submission wording that stays honest: Neural-contribution audit for imagined speech with a brain-minus-prior control.
  • What still needs outside support: an external language-evaluation layer and a broader leak-control family before any stronger mechanism wording is allowed.
  • What still stays outside the claim: preserved internal mechanism, preserved identity, and any stronger mind-upload wording.
  • If you need the row-specific anchor-choice rationale, read the U13-2 route packet.

U13-5

  • Question focus: where a shared decoder begins to fail when the route moves from perception to recall.
  • Why D03 remains only a gated support route: the intended paired EEG + eye-tracking target is still useful for the row, but the visible IEEE DataPort metadata is a 55-student cognitive-load dataset with Chinese column guidance and no recall-specific label exposed on the public page, so public wording must stay narrower than an immediate-public-anchor reading.
  • What this anchor is strong enough to close now: a perception-to-recall degradation note and a transfer-gap table that stay explicitly narrow.
  • Submission wording that stays honest: Perception-to-recall transfer-gap benchmark for mimic separation.
  • What still needs outside support: an external recall-validity layer and a public-open speech/EEG+ET backup family before any shared-mechanism reading is attempted.
  • What still stays outside the claim: any statement that a shared decoder demonstrates a shared preserved internal mechanism.
  • If you need the row-specific anchor-choice rationale, read the U13-5 route packet.

U0-2

  • Question focus: how to keep identity-like wording from collapsing into unbounded measurement error.
  • Why D02 remains only a gated support floor: the intended dataset is still explicitly cross-session and cross-task and stays tied to 10 participants, but the current IEEE DataPort page is subscription-gated, so public wording cannot treat it as an immediate public anchor.
  • What this anchor is strong enough to close now: an offset / jitter distribution plus a state-feature collapse audit.
  • Submission wording that stays honest: Temporal-validity-aware identity-drift audit.
  • What still needs outside support: longer-horizon timing logs and larger cohorts before the row can be read as anything more than a bounded drift benchmark.
  • What still stays outside the claim: legal, philosophical, or normative continuity claims.
  • If you need the row-specific anchor-choice rationale, read the U0-2 route packet.

U0-3

  • Question focus: how to make threshold stability interpretable only after the timing route is already bounded.
  • Why the same D02 anchor stays in scope only as gated support: threshold stability remains meaningful only when it sits on the same intended cross-session / cross-task floor as U0-2, but the current IEEE DataPort page is subscription-gated, so public wording must stay narrower than an immediate-access reading.
  • What this anchor is strong enough to close now: a threshold-stability note and an overfit-exclusion rule that stay benchmark-like and narrow.
  • Submission wording that stays honest: Task-specific identity-threshold stability study.
  • What still needs outside support: a session-external rerun pack and cohort extension before this row can carry anything stronger than a bounded biometric threshold claim.
  • What still stays outside the claim: treating a stable threshold as sufficient for personhood continuity or branch-identity resolution.
  • If you need the row-specific anchor-choice rationale, read the U0-3 route packet.

U14-4

  • Question focus: how to make disclosure fields concrete enough to matter for reruns.
  • Why D01 is still useful only as a bounded entry point: the visible package is a wireless delay and synchronization dataset rather than a rerun benchmark by itself, but it is still enough to force latency and measurement fields into a real Model Card / Dataset Card example without claiming field-wide standardization.
  • What this anchor is strong enough to close now: filled card examples for the current public batch.
  • Submission wording that stays honest: Disclosure-first reproducibility contract package.
  • What still needs outside support: D13-backed rerun benchmarks and leak-audit exemplars before any broader reproducibility claim is made.
  • What still stays outside the claim: organizational adoption, field-wide standards uptake, or a broad reproducibility victory statement.
  • If you need the row-specific anchor-choice rationale, read the U14-4 route packet.

U14-2

  • Question focus: how to make the exploration / confirmation split operational instead of aspirational.
  • Why the same D01 anchor still works: the latency-first measurement route is enough to freeze a fixed split plus rerun boundary, but it still needs D13 as the first public-open rerun family before stronger confirmatory wording is attempted.
  • What this anchor is strong enough to close now: a fixed-split rerun contract and a negative-case trail that remain explicitly narrow.
  • Submission wording that stays honest: Exploration-confirmation split contract for reruns.
  • What still needs outside support: D13-backed split-violation examples across richer public benchmarks before the row can be read as broader confirmatory readiness.
  • What still stays outside the claim: broader rerun robustness claims or confirmatory wording for exploratory outputs.
  • If you need the row-specific anchor-choice rationale, read the U14-2 route packet.

What this page does not do

  • It does not replace the wider 60RQ map.
  • It does not expand the public batch beyond the current six.
  • It does not move theory, law, neurorights, or full identity questions into an EEG-only solved state.