mind upload current public six rq brief - yasufumi-nakata/mind-upload GitHub Wiki
Mind-upload Current Public Six: EEG Route Brief
A narrow route brief, not a solved-claim update
This learning page is generated for GitHub Wiki. The public portal is managed on mind-upload.com.
- Updated: 2026-04-04 / Role: Current public six
Role Of This Page
This page fixes the current public six-question route at the level of one RQ, one bounded anchor, one first artifact, and one funding sentence.
Back To Public Pages
Related Wiki Pages
- Wiki: RQ solvability bridge - One page for what EEG can close now, what still needs outside support, and which funding lane still fits.
- Wiki: RQ-by-RQ deep dossiers - The longer working dossier for the current public six and the wider 60RQ map.
- Wiki: Grant and dataset playbook - The route from each RQ to the current bounded funding lane and EEG anchor.
- Wiki: U13-2 route packet - Why D10 stays first for U13-2, why the other speech candidates stay secondary, and what the first artifact can honestly close.
- Wiki: U13-5 route packet - Why D03 stays the intended gated-support anchor for U13-5, why the support anchors stay secondary, and what the transfer-gap artifact can honestly close.
- Wiki: U0-2 route packet - Why D02 stays the intended gated-support anchor for U0-2, why the support anchors stay secondary, and what the timing-floor artifact can honestly close.
- Wiki: U0-3 route packet - Why D02 stays the intended gated-support anchor for U0-3, why the support anchors stay secondary, and what the threshold-governance artifact can honestly close.
- Wiki: U14-4 route packet - Why D01 stays the intended gated-support anchor for U14-4, why richer rerun benchmarks stay secondary, and what the card-contract artifact can honestly close.
- Wiki: U14-2 route packet - Why D01 stays the intended gated-support anchor for U14-2, why richer rerun benchmarks stay secondary, and what the fixed-split artifact can honestly close.
- Wiki: U7-2 route packet - The adjacent timing-metric packet that keeps the same D11 synchronization family readable without changing the current public six.
Mind-upload Current Public Six: EEG Route Brief
This page keeps the current public six-question batch readable at the level of one RQ -> one bounded EEG anchor -> one first artifact -> one funding bridge.
It does not announce solved claims. It only states what the current public route is narrow enough to support after a post-pull review of mind-upload, EEG-DATA, auto-research-funds, the live public page, the current official funding windows, and a read-only Todoist recheck.
What still stays fixed after the 17:07 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 17:07 JSTaftermind-upload@dc8ec5dc5e62,EEG-DATA@f115f11c2da4, andauto-research-funds@8d0f5128fcdcstill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadsplits barrier-side human-proxy roles outside the current six without widening the route,EEG-DATAdeepens theEEGIS imagined speechmetadata while still keeping30,930merged-unique rows,28,893high-confidence rows, and24,909immediately usable rows in the current README snapshot, andauto-research-fundsadds theUehiro ethics foundationlegacy sync while now reporting8,616aid IDs,4,319rows, and3,971official-source rows without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors, and the next-watch family still staysD11 / D08 / D05 / D20. - The three-stack reading also stays explicit rather than generic:
U13-2 / U13-5remain the speech-side control and transfer-gap pair,U0-2 / U0-3remain the identity-drift floor and threshold-governance pair, andU14-4 / U14-2remain the card-contract and fixed-split rerun-governance pair. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnedLast-Modified: Sat, 04 Apr 2026 07:12:56 GMT, and the checked bodies still surfaced2026-04-04 14:10 JSTwording across all five checked pages before this source sync. - Official-window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipstill reads as the2026-04-09must-arrive side route,Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,JSM=0,Doumei=0,Kenkyu no Susume=0), so no new task was added in this session. - This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while aligning the front door and the
U13-2row packet to the same bounded17:07 JSTbasis.
What still stays fixed after the 14:10 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 14:10 JSTaftermind-upload@cafeab4bc2a5,EEG-DATA@e0695bcac83d, andauto-research-funds@a4852d89376cstill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadtightens glossary excitability and ionic terms on top of the earlier EEG foundation-model source-status split without widening the route,EEG-DATAdeepensneuroTUM Cybathlon,Zenodo TSA v7.8, andpoetry EEGmetadata while still keeping30,930merged-unique rows,28,893high-confidence rows,24,909immediate rows, and24,539high-confidence immediate rows, andauto-research-fundsaddsJELA Diakoniascholarship cards without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors, and the next-watch family still staysD11 / D08 / D05 / D20. - The three-stack reading also stays explicit rather than generic:
U13-2 / U13-5remain the speech-side control and transfer-gap pair,U0-2 / U0-3remain the identity-drift floor and threshold-governance pair, andU14-4 / U14-2remain the card-contract and fixed-split rerun-governance pair. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html, and the current-six row packets; the checked headers now returnedLast-Modified: Sat, 04 Apr 2026 04:18:04 GMT, and the checked bodies still surfaced2026-04-04 12:02 JSTwording onissue / brief / bridge / playbookwhile the older current-six row packets still surfaced2026-04-04 09:05 JSTwording before this source sync. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipstill reads as the annualmid-January to early-Aprilwindow and continues to be handled as the2026-04-09must-arrive side route,Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Doumei=0,Kenkyu no Susume=0), so no new task was added in this session. - This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while aligning the front door, playbook, and the entire current-six row packet set to the same bounded
14:10 JSTbasis.
What still stays fixed after the 12:02 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 12:02 JSTaftermind-upload@f84f6e53753b,EEG-DATA@017ae806c4dd, andauto-research-funds@d4024a5b8a1astill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadsynchronizes the EEG recording-frame contract across public pages without widening the route,EEG-DATAdeep-dives capacity-for-movement EEG datasets while still keeping30,929merged-unique rows,28,892high-confidence rows,24,908immediate rows, and24,538high-confidence immediate rows, andauto-research-fundsstill just carries the earlier11:04 JSTfunding addendum without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors, and the next-watch family still staysD11 / D08 / D05 / D20. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnedLast-Modified: Sat, 04 Apr 2026 02:19:09 GMT, and the checked bodies already surfaced2026-04-04 11:04 JSTwording onissue / brief / bridge / playbookwhileu13-2-brain-minus-prior-route.htmlstill surfaced2026-04-04 09:05 JSTwording before this source sync. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipstill reads as the annualmid-January to early-Aprilwindow and continues to be handled as the2026-04-09must-arrive side route,Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Doumei=0,Kenkyu no Susume=0), so no new task was added in this session. - This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while aligning the front door, playbook, and the first-row packet to the same bounded
12:02 JSTbasis.
What still stays fixed after the 11:04 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 11:04 JSTaftermind-upload@812e1650bae1,EEG-DATA@1deac45c75a2, andauto-research-funds@9741ee45a025still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadtightens glossary bridge-witness terminology without widening the route,EEG-DATAcollapses duplicate EEG-fMRI override rows and now keeps30,929merged-unique rows,28,892high-confidence rows,24,908immediate rows, and24,538high-confidence immediate rows while leaving the currentD10 / D03 / D02 / D01family unchanged, andauto-research-fundsadds legacy coverage for current-cycle funding cards without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors, and the next-watch family still staysD11 / D08 / D05 / D20. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnedLast-Modified: Sat, 04 Apr 2026 01:14:45 GMT, and the checked bodies still surfaced2026-04-04 09:05 JSTwording before this source sync. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipstill reads as the annualmid-January to early-Aprilwindow and continues to be handled as the2026-04-09must-arrive side route,Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2), so no new task was added in this session. - This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while adding a bounded
11:04 JSTfront-door and playbook sync.
What still stays fixed after the 09:05 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 09:05 JSTaftermind-upload@e571567f017d,EEG-DATA@fbbb0d8c01e0, andauto-research-funds@d7f6fb9bc158still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadnow just carries the earlier08:07 JSTroute-hold sync on top of a recent pretraining-overlap audit,EEG-DATAstill keeps30,929merged-unique rows,28,892high-confidence rows,24,909immediate rows, and24,539high-confidence immediate rows while treatingOpenNeuro ds007020as a limited rest-side support note and keepingHeartBEAMplus figshareEEG at rest and with TMSonly as backup families, andauto-research-fundsadds deeply reviewed April 4 scholarship updates while still keepingJGC-Sonly as an adjacent runway without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors, and the next-watch family still staysD11 / D08 / D05 / D20. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html, and the current-six row packets; the checked front-door headers now returnedLast-Modified: Fri, 03 Apr 2026 23:18:55 GMT, and the checked bodies already surfaced2026-04-04 08:07 JSTwording. The current-six row packets returnedLast-Modified: Sat, 04 Apr 2026 00:11:41 GMTand still surfaced2026-04-04 01:04 JSTwording before this source sync. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipstill reads as the annualmid-January to early-Aprilwindow and continues to be handled as the2026-04-09must-arrive side route,Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2), so no new task was added in this session. - This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads while aligning the current-six row packets to the already-published front door.
What still stays fixed after the 08:07 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 08:07 JSTaftermind-upload@418c8f5d0ef9,EEG-DATA@dc6d833b83e9, andauto-research-funds@58d8738be5d5still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadtightens the front-door human-proxy comparison,EEG-DATAstill keeps30,929merged-unique rows,28,892high-confidence rows,24,909immediate rows, and24,539high-confidence immediate rows while promotingHeartBEAMand figshareEEG at rest and with TMSonly as backup families, andauto-research-fundsadds theJGC-Sforeign-student scholarship only as an adjacent runway without displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors, and the next-watch family still staysD11 / D08 / D05 / D20. - Browser-level live checks before this source sync still returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html,u13-2-brain-minus-prior-route.html, andu13-5-perception-to-recall-route.html; the checked headers now returnedLast-Modified: Fri, 03 Apr 2026 22:10:18 GMT, and the checked bodies still surfaced2026-04-04 01:04 JSTwording before this source sync. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipstill reads as the annualmid-January to early-Aprilwindow and continues to be handled as the2026-04-09must-arrive side route,Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Keio graduate scholarship=2,G-7=1,ENEOS=1,Doumei=0,Kenkyu no Susume=0), so no new task was added in this session. - This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the latest pulled heads, the newly strengthened
HeartBEAM/ TMS backup note, the adjacent-runwayJGC-Sno-op judgment, and the newer live public headers.
What still stays fixed after the 01:04 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 01:04 JSTaftermind-upload@9b6a8b971ba0,EEG-DATA@56d765da60b, andauto-research-funds@3c8569e28still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadnow carries the earlier00:06 JSTroute reread plus field-level artifact-stack disclosure tightening,EEG-DATAdeepens the public OpenNeuro metadata forNumbersandPRIOSwhile still keeping30,921merged-unique rows,28,884high-confidence rows,24,900immediate rows, and24,530high-confidence immediate rows, andauto-research-fundsadds current coverage forćçèČæäŒandç ç©¶ăźăăă愚ćŠéwithout displacing the practical shortlist. - Route-safe access wording therefore still stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors. - Browser-level live checks before this source sync still returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html,u13-2-brain-minus-prior-route.html, andu13-5-perception-to-recall-route.html; the checked headers returnedLast-Modified: Fri, 03 Apr 2026 15:13:06 GMT, and the checked bodies still surfaced2026-04-04 00:06 JSTwording before this source sync. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive),Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Keio graduate scholarship=2,G-7=1,ENEOS=1,ćçäŒ=0,ç ç©¶ăźăăă=0), so no new task was added in this session. - This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the actual latest pulled heads, current live bodies, official windows, and Todoist sufficiency check.
What still stays fixed after the 00:06 JST actual-pull reread on April 4, 2026
- An actual-pull recheck at
2026-04-04 00:06 JSTaftermind-upload@84d84fb5a82d,EEG-DATA@b468ecc5f8c0, andauto-research-funds@eccee095a939still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadnow just carries the earlier23:06 JSTroute reread addenda,EEG-DATAaddsfast mapping semantic integration EEG datasetwhilesummary.jsonnow reports30,921merged-unique rows,28,884high-confidence rows,24,900immediate rows, and24,530high-confidence immediate rows, andauto-research-fundsaddsIizuka current card and Korean legacy syncwithout replacing the practical shortlist. - Route-safe access wording therefore still stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors, and the next-watch family still staysD11 / D08 / D05 / D20. - Browser-level live checks before this source sync still returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html,u13-2-brain-minus-prior-route.html, andu13-5-perception-to-recall-route.html; the checked bodies still surfaced22:04 JSTonbrief / bridge / U13-2and22:04/22:05 JSTonissuerather than a new queue or claim. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive),Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Keio graduate scholarship=2,G-7=1,ENEOS=1), so no new task was added in this session. - This source sync still does not widen the current public six. It only carries the same one-RQ-at-a-time batch onto the actual latest pulled heads, live public bodies, official windows, and Todoist sufficiency check.
What still stays fixed after the 23:06 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 23:06 JSTaftermind-upload@ec7a7dd713e9,EEG-DATA@46f6b56c693c, andauto-research-funds@b3d3c531729astill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadnow just carries the earlier22:04 JSTroute-hold sync,EEG-DATAaddsmotion sicknessandswallowing EEGdatasets whilesummary.jsonnow reports30,920merged-unique rows,28,883high-confidence rows,24,899immediate rows, and24,529high-confidence immediate rows, andauto-research-fundsdeepensKIRII / Pigeon / Nakato / Takashimascholarship coverage plus a22:04 JSTfunding addendum without replacing the practical shortlist. - Route-safe access wording therefore still stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks before this source sync returned
HTTP/2 200formind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html,mind-upload-eeg-rq60-grant-dataset-playbook.html, and the current-six row packets; those checked pages returnedLast-Modified: Fri, 03 Apr 2026 13:18:48 GMT, the front-door pages plusU13-2already surfaced22:04 JST, and the other five row packets still surfaced the earlier2026-04-02 / 23:08 JSThold note before this source sync. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive),Nakatani Foundation research grant = closed / next-cycle watch, andSecom General Research Grant = closed (2026-03-31 12:00 JST). - A fresh read-only Todoist audit still showed enough route coverage (
items=206,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Keio graduate scholarship=2,G-7=1,ENEOS=1), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same:
U13-2 = brain-minus-prior control table,U13-5 = perception-to-recall degradation note,U0-2 = offset/jitter + state-feature collapse audit,U0-3 = threshold-stability note + overfit-exclusion rule,U14-4 = filled Model Card / Dataset Card examples, andU14-2 = fixed-split rerun contract + negative-case trail.
What still stays fixed after the 22:04 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 22:04 JSTaftermind-upload@1ab35b64796f3936e525befb5d9428d789a16263,EEG-DATA@be3d03d1c286dcd37fb056317a693e47c39f7f3a, andauto-research-funds@845e6849a6c36e6e83394e32cf8dc4b5fe6fdc07still leaves the public batch and the solve-first order unchanged. - The newest pulled delta is now concentrated in
EEG-DATA:summary.jsonreports30,918merged-unique rows,28,881high-confidence rows,24,898immediate rows, and24,528high-confidence immediate rows after the latest exhaustive refresh, whilemind-uploadandauto-research-fundsnow just carry their earlier21:05 JSTaddenda without replacing the practical shortlist. - Route-safe access wording therefore still stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks before this source sync returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; those checked pages returnedLast-Modified: Fri, 03 Apr 2026 12:24:26 GMT, and their route-facing body wording already surfaced21:05 JSTonissue / brief / bridgewhileU13-2still surfaced21:05 JSTand11:07 JST. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, and the rest of the watch/closed reading stays unchanged from the21:05 JSTreread. - A fresh read-only Todoist audit still showed enough route coverage (
items=205,projects=2,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,Keio graduate scholarship=2,G-7=1,ENEOS=0), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same:
U13-2 = brain-minus-prior control table,U13-5 = perception-to-recall degradation note,U0-2 = offset/jitter + state-feature collapse audit,U0-3 = threshold-stability note + overfit-exclusion rule,U14-4 = filled Model Card / Dataset Card examples, andU14-2 = fixed-split rerun contract + negative-case trail.
What still stays fixed after the 21:05 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 21:05 JSTaftermind-upload@3db1aa653b74d164c3a57b75677e345ea10356e0,EEG-DATA@c10c95274ecf1397768eb28de48aac8ce925c22d, andauto-research-funds@4a67e06b530bc742521f80fa5b13ccbe1115ebb9still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas are still carry-forward rather than route replacement:
mind-uploadnow just carries the20:05 JSTroute-hold addendum,EEG-DATAadds BDSP manual deep dives for missing EEG datasets while now reporting30,914merged-unique rows,28,877high-confidence rows,24,896immediate rows, and24,526high-confidence immediate rows, andauto-research-fundsnow just carries the20:05 JSTfunding addendum without replacing the practical shortlist. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks before this source sync returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; those checked pages returnedLast-Modified: Fri, 03 Apr 2026 11:17:44 GMT, and their route-facing body wording already surfaced the earlier20:05 JSThold note onissue / brief / bridgewhileU13-2still surfaced11:07 JST. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive),Secom General Research Grant = closed (2026-03-31 12:00 JST), andNakatani Foundation research grant = closed / next-cycle watch. - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=205,projects=2,Nakatani family=11,G-7=1,ENEOS=0,Keio graduate scholarship=2), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same:
U13-2 = brain-minus-prior control table,U13-5 = perception-to-recall degradation note,U0-2 = offset/jitter + state-feature collapse audit,U0-3 = threshold-stability note + overfit-exclusion rule,U14-4 = filled Model Card / Dataset Card examples, andU14-2 = fixed-split rerun contract + negative-case trail.
What still stays fixed after the 20:05 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 20:05 JSTaftermind-upload@b4fd73d9e98301c918b57541704a95246d69ae09,EEG-DATA@649ff098ab577f11065562379150acea1aa07002, andauto-research-funds@7c1b835d1d138214f282dc85d2f06d9faa522310still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen support space rather than widen the active batch:
mind-uploadnow splits human thermal evidence outside the current six intopassive / task-linked macro thermometryandperturbation-conditioned thermal routes,EEG-DATAadds a restrictedTranscranial Magnetic Stimulation in Alzheimer's disease-DataBDSP deep dive while now reporting30,912merged-unique rows,28,875high-confidence rows, and24,894directly usable rows, andauto-research-fundscompletes current-card coverage forENEOSandG-7scholarships while now reporting8,600aid IDs,4,308rows, and3,959official-source rows without replacing the practical shortlist. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks before this source sync returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; those checked pages returnedLast-Modified: Fri, 03 Apr 2026 10:19:46 GMT, but their route-facing body wording still surfaced the earlier11:05/11:07 JSThold note. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive),Secom General Research Grant = closed (2026-03-31 12:00 JST), andNakatani Foundation research grant = closed / next-cycle watch. - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=205,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same:
U13-2 = brain-minus-prior control table,U13-5 = perception-to-recall degradation note,U0-2 = offset/jitter + state-feature collapse audit,U0-3 = threshold-stability note + overfit-exclusion rule,U14-4 = filled Model Card / Dataset Card examples, andU14-2 = fixed-split rerun contract + negative-case trail.
What still stays fixed after the 11:05 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 11:05 JSTaftermind-upload@f70432e4a6c8a52afafbc57b98c8f0e360c85d4e,EEG-DATA@1981d34c5f71deceb2549684db9173b6f54d2b89, andauto-research-funds@bfebe94da875d709756746285f133ef30905fd38still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still tighten support space rather than widen the active batch:
mind-uploadnow tightenssleep replay integrity / physiology-gatewording outside the current six,EEG-DATArefreshes its inventory and deep-dives theCOG-BCIfamily while now reporting30,904merged-unique rows,28,867high-confidence rows, and24,890directly usable rows, andauto-research-fundscarries forward the10:06 JST mind-upload funding addendumwhile now reporting8,596aid IDs,4,308rows, and3,958official-source rows without replacing the practical shortlist. - Route-safe access wording also stays unchanged:
D10remains the only clear public-open primary anchor in the current six whileD03 / D02 / D01remain gated-support planning anchors because no newest pulled head turns those three routes into immediate public anchors. - Browser-level live checks before this source sync returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; those checked pages returnedLast-Modified: Fri, 03 Apr 2026 01:31:28 GMT, but their route-facing body wording still surfaced the earlier05:12 JSThold note. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive),Secom General Research Grant = closed (2026-03-31 12:00 JST), andNakatani Foundation research grant = closed / next-cycle watch. - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same:
U13-2 = brain-minus-prior control table,U13-5 = perception-to-recall degradation note,U0-2 = offset/jitter + state-feature collapse audit,U0-3 = threshold-stability note + overfit-exclusion rule,U14-4 = filled Model Card / Dataset Card examples, andU14-2 = fixed-split rerun contract + negative-case trail.
What still stays fixed after the 05:12 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 05:12 JSTaftermind-upload@a9fc5d1cb691f3669c40803604e78cf87fab4eed,EEG-DATA@8c3ace28bad0b3bac259caa440994e5d05bfc7d1, andauto-research-funds@35756f8381c47daa24bb70bb7a1ff88d1dcf76bcstill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still tighten support space rather than widen the active batch:
mind-uploadis now at adocs: sync github wiki exporthead that keeps the exported route mirrors aligned without changing the active queue,EEG-DATAcarries forward aVR navigation datasetoutput refresh on top of a recentEESM17metadata deepening while still keeping30,900merged-unique rows,28,863high-confidence rows, and24,885directly usable rows, andauto-research-fundsaddsJSPS overseas fellowcurrent-card snapshots on top of a recentJSSF research publicationrefresh while now reporting8,594aid IDs,4,307rows, and3,957official-source rows without displacing the practical shortlist. - The route-safe access reading therefore still stays narrow: no newest pulled head turns
D03 / D02 / D01into immediate public anchors, so public-safe wording still keepsD10as the only clear public-open primary anchor and keepsD03 / D02 / D01as gated-support planning anchors. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Thu, 02 Apr 2026 19:17:56 GMT, while the checked bodies still surfaced the earlier04:05/04:06 JSThold note before this source sync. - Official window spot checks in this run still keep the practical bridge narrow:
Kura Fundremains open (2026-02-02 - 2026-04-17 17:00),Nakatani Foundation graduate scholarshipremains open (2026-04-01 - 2026-05-25 15:00),Kashinome Scholarshipstays a student-runway side route (2026-01-14 - 2026-04-09 must arrive),Nakatani Foundation research grantremains closed / next-cycle watch (ćéăç”äșăăŸăăon the current public page), andSecom General Research Grantremains closed for the current cycle (2026-03-31 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same:
U13-2 = brain-minus-prior control table,U13-5 = perception-to-recall degradation note,U0-2 = offset/jitter + state-feature collapse audit,U0-3 = threshold-stability note + overfit-exclusion rule,U14-4 = filled Model Card / Dataset Card examples, andU14-2 = fixed-split rerun contract + negative-case trail.
What still stays fixed after the 04:06 JST actual-pull reread on April 3, 2026
- An actual-pull recheck at
2026-04-03 04:06 JSTaftermind-upload@f5e13ebdc4748ce683d905c37cabfdb3c53036bb,EEG-DATA@53f5c8166faf0d5fcebfb5c39741d4992eb82a39, andauto-research-funds@1f190fec93a9180a27443b1fe2b31f9488dfbf74still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still tighten support space rather than widen the active batch:
mind-uploadcarries forward aBCSFB / human-proxy compositionliterature sync outside the current six,EEG-DATAkeeps30,900merged-unique rows,28,863high-confidence rows, and24,885directly usable rows after a catalog refresh that does not replace any current anchor family, andauto-research-fundsrefreshes current-card and registry layers aroundItoh domestic scholarshipwhile now reporting8,593aid IDs,4,306rows, and3,956official-source rows without displacing the practical shortlist. - The route-safe access reading therefore still stays narrow: no newest pulled head turns
D03 / D02 / D01into immediate public anchors, so public-safe wording still keepsD10as the only clear public-open primary anchor and keepsD03 / D02 / D01as gated-support planning anchors. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Thu, 02 Apr 2026 18:14:39 GMT. - Official window spot checks in this run still keep the practical bridge narrow:
Kura Fundremains open (2026-02-02 - 2026-04-17 17:00),Nakatani Foundation graduate scholarshipremains open (2026-04-01 - 2026-05-25 15:00),Kashinome Scholarshipstays a student-runway side route (2026-01-14 - 2026-04-09 must arrive),Nakatani Foundation research grantremains closed / next-cycle watch (ćéăç”äșăăŸăăon the current public page), andSecom General Research Grantremains closed for the current cycle (2026-03-31 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - The row-facing first artifacts therefore still stay the same:
U13-2 = brain-minus-prior control table,U13-5 = perception-to-recall degradation note,U0-2 = offset/jitter + state-feature collapse audit,U0-3 = threshold-stability note + overfit-exclusion rule,U14-4 = filled Model Card / Dataset Card examples, andU14-2 = fixed-split rerun contract + negative-case trail.
What still stays fixed after the 23:08 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 23:08 JSTaftermind-upload@f5d1d1dd1683,EEG-DATA@ee1463d28288, andauto-research-funds@ec24a355abbcstill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route discipline and support space rather than the active claim surface:
mind-uploadclarifies the causal-versus-human-proxy bridge and local-route/proxy boundaries outside the current six,EEG-DATArefines EEG candidate curation and addsOpenNeuro ds007615while now reporting30,896merged-unique rows,28,859high-confidence rows, and24,882directly usable rows in the current README snapshot, andauto-research-fundsaddsGeo-Kagakucurrent cards plus a README-stat refresh without displacing the practical shortlist. - The route-safe access reading therefore still stays narrow: no newest pulled head turns
D03 / D02 / D01into immediate public anchors, so public-safe wording still keepsD10as the only clear public-open primary anchor and keepsD03 / D02 / D01as gated-support planning anchors. - Browser-level live checks in this run returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu13-2-brain-minus-prior-route.html; the checked headers now returnLast-Modified: Thu, 02 Apr 2026 13:12:21 GMT. - Official window spot checks in this run still keep the practical bridge narrow:
Kura Fundremains open (2026-02-02 - 2026-04-17 17:00),Nakatani Foundation graduate scholarshipremains open (2026-04-01 - 2026-05-25 15:00),Nakatani Foundation research grantremains closed / next-cycle watch (ćéæé 2025-06-01 - 2025-07-07), andSecom General Research Grantremains closed for the current cycle (2026-03-31 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync still does not widen the current public six. It only carries forward the same one-RQ-at-a-time batch onto the latest pulled heads, live public headers, official windows, and Todoist sufficiency check.
What still stays fixed after the 19:03 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 19:03 JSTaftermind-upload@e1a7e7e2f22c,EEG-DATA@a7f9390492fd, andauto-research-funds@00cdbaa9a122still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploadnow deepens theblood-CSF barrier / choroid-plexusroute split on human neurovascular pages outside the current six,EEG-DATAstill reports30,892merged-unique rows,28,855high-confidence rows, and24,880directly usable rows in the current README snapshot, andauto-research-fundsstill keeps its latest summary at8,590aid IDs,4,301rows, and3,951official-source rows without replacing the practical shortlist. - The route-safe access reading still stays narrow:
D10remains the only clear public-open primary anchor whileD03 / D02 / D01still stay gated-support anchors in public wording. A direct live-access reread still showsSubscription RequiredplusLOGIN TO ACCESS DATASET FILESon the currentIEEE DataPortpages for those three support anchors. - Browser-level live checks before this source sync returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu7-2-timing-metric-route.html; the checked pages returnedLast-Modified: Thu, 02 Apr 2026 09:37:54 GMT, but their route-facing body wording still surfaced the earlier18:06 JSThold note. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive),Secom General Research Grant = closed (March 31, 2026 at 12:00 JST), andNakatani Foundation research grant = closed / next-cycle watch. - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync still does not widen the current public six. It only carries forward the same one-RQ-at-a-time batch onto the latest repo heads, live public headers, official windows, and Todoist sufficiency check while updating the route-hold wording to the latest pulled heads.
What still stays fixed after the 18:06 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 18:06 JSTaftermind-upload@85b6603b569b,EEG-DATA@a7f9390492fd, andauto-research-funds@b6c0d0f4eeb7still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploadonly syncsU7-2public bridge wording,EEG-DATAdeep-divesOSF gazx2confidence EEG metadata andOpenNeuro ds007081while now reporting30,892merged-unique rows,28,855high-confidence rows, and24,880directly usable rows in the current README snapshot, andauto-research-fundsrefreshes its README summary to8,590aid IDs,4,301rows, and3,951official-source rows without replacing the practical shortlist. - The route-safe access reading still stays narrow:
D10remains the only clear public-open primary anchor whileD03 / D02 / D01still stay gated-support anchors in public wording. A direct live-access reread still showsSubscription RequiredplusLOGIN TO ACCESS DATASET FILESon the currentIEEE DataPortpages for those three support anchors. - Browser-level live checks before this source sync returned
HTTP/2 200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu7-2-timing-metric-route.html; the checked pages returnedLast-Modified: Thu, 02 Apr 2026 08:22:50 GMT. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09 (must arrive),Secom General Research Grant = closed (March 31, 2026 at 12:00 JST), andNakatani Foundation research grant = closed / next-cycle watch. - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync still does not widen the current public six. It only carries forward the same one-RQ-at-a-time batch onto the latest repo heads, live public headers, official windows, and Todoist sufficiency check.
What still stays fixed after the 11:05 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 11:05 JSTaftermind-upload@208e59e2180c,EEG-DATA@00d85380f3fd, andauto-research-funds@f4ba35518400still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploadrefreshes the 10:07 route-hold packets,EEG-DATAdeep-dives the maintainedChineseEEG-2release plus the publicauditory-eegfamily while still reporting30,887merged-unique rows,28,850high-confidence rows, and24,875immediately usable rows, andauto-research-fundskeeps the same practical shortlist. The new speech-side public-open material strengthens backup reading/listening alignment checks forU13-2/U13-5, but it does not replaceD10as the primary anchor or repair the recall-validity gap underU13-5. - The route-safe access reading still stays narrow:
D10remains the only clear public-open primary anchor whileD03 / D02 / D01still stay gated-support anchors in public wording. A direct live-access reread still showsSubscription RequiredplusLOGIN TO ACCESS DATASET FILESon the currentIEEE DataPortpages for those three support anchors. - Browser-level live checks in this run returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages returnedLast-Modified: Thu, 02 Apr 2026 01:22:44 GMT. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09,Secom General Research Grant = closed (March 31, 2026 at 12:00 JST), andNakatani Foundation research grant = next-cycle watch. - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync only refreshes the route-hold wording and the speech-side support reading. It does not widen the current claim surface.
What still stays fixed after the 11:09 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 11:09 JSTaftermind-upload@208e59e2180c,EEG-DATA@00d85380f3f, andauto-research-funds@f4ba35518400still leaves the public batch and the solve-first order unchanged. - The current
mind-uploadhead is the earlier 10:07 route-hold packet refresh itself, while the newest upstream movement is onEEG-DATA:chore: deep-dive ChineseEEG-2 and PhysioNet auditory EEG. The refreshed summary still reports30,887merged-unique rows,28,850high-confidence rows, and24,875directly usable rows, andauto-research-fundskeeps the same practical shortlist while its repository stats still read8,585aid IDs,4,293rows, and3,943official-source rows. - The route-safe access reading still stays narrow:
D10remains the only clear public-open primary anchor whileD03 / D02 / D01still stay gated-support anchors in public wording. - The new public-open adjuncts only tighten row-specific backup coverage rather than widen the batch:
ds007591andds007602strengthen speech-side backup options forU13-2but still expose only three released participants each,ChineseEEG-2strengthens public reading/listening alignment coverage forU13-5but still does not expose the intended recall-labeled branch, and PhysioNetauditory-eegis clearly public-open but remains single-day 4-channel coverage rather than a replacement forD02inU0-2 / U0-3. - Browser-level live checks before this source sync still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages now returnedLast-Modified: Thu, 02 Apr 2026 01:22:44 GMT. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipofficial page still reads as the annualmid-January to early-Aprilwindow, andSecom General Research Grantstill shows the current cycle closed (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync only refreshes the route-hold wording and the backup-family reading after the newest
EEG-DATAcarry-forward. It does not widen the current claim surface.
What still stays fixed after the 10:07 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 10:07 JSTaftermind-upload@be507c810b11,EEG-DATA@3f20f48cca6e, andauto-research-funds@fb32c05163f4still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploadrefines EEG foundation setup-equivalence boundaries outside the current six,EEG-DATAdeep-dives the HBN EEG release 11 route and now reports30,887merged-unique rows,28,850high-confidence rows, and24,871directly usable rows, andauto-research-fundskeeps the same practical shortlist while its repository stats still read8,585aid IDs,4,293rows, and3,943official-source rows. - The route-safe access reading still stays narrow:
D10remains the only clear public-open primary anchor whileD03 / D02 / D01still stay gated-support anchors in public wording. The row-level reading only tightens inside that unchanged batch:U13-5still carries an explicit recall-validity caveat because the visibleD03metadata still does not expose a recall-specific label, andU14-4 / U14-2still keepD13as the first public-open rerun support family beyond the currentD01disclosure floor. - Browser-level live checks before this source sync still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages also returnedLast-Modified: Thu, 02 Apr 2026 00:15:06 GMT. - This source sync also re-aligns the public-side row wording and the funding-facing
60RQdossier wording to the sameDxx + DOI + dataset name + access classstandard, so the public six now point into the same canonical row packets as the funding repo again. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipofficial page still reads as the annualmid-January to early-Aprilwindow, andSecom General Research Grantstill shows the current cycle closed (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync only refreshes the route-hold wording and the row-by-row dossier wording on the public entry pages. It does not widen the current claim surface.
What still stays fixed after the 09:05 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 09:05 JSTaftermind-upload@d7f30648fc40,EEG-DATA@ac8cc6fc8e74, andauto-research-funds@31ec17305f6astill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploadtightens a literature myelin-route split outside the current six,EEG-DATAadds theaw8szdeep dive and now reportsmerged_unique=30886,high_confidence=28849, andaccess_counts_high.immediate=24500, andauto-research-fundscarries forward theAoi graduate scholarship/JSSF research grantmerges plus a README-stat refresh to8,585aid IDs,4,293rows, and3,943official-source rows without changing the practical shortlist. - The route-safe access reading still stays narrow:
D10remains the only clear public-open primary anchor whileD03 / D02 / D01still stay gated-support anchors in public wording. A direct live-access reread still showsD03 / D02 / D01behindIEEE DataPortlogin and subscription gates. - Browser-level live checks before this source sync still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages also returnedLast-Modified: Wed, 01 Apr 2026 23:29:12 GMT, and the live pages still surfaced the earlier04:09 JST/03:08 JSTreread notes before this source update. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00, theKashinome Scholarshipofficial page still reads as the annualmid-January to early-Aprilwindow, andSecom General Research Grantstill shows the current cycle closed (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync only refreshes the route-hold wording on the public entry pages. It does not widen the current claim surface.
What still stays fixed after the 03:08 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 03:08 JSTaftermind-upload@d391dbede29e,EEG-DATA@f9df9ba85a6, andauto-research-funds@95f804055809still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploadsplits ECM / PNN literature routes outside the current six,EEG-DATAadds two immediate-access deep-dive candidates (10.48804/NV4RGLand10.7281/T1/B660D2) without replacing the current anchor family, andauto-research-fundsadds Gakusho / NII funding merges plus a README-stat refresh without changing the practical shortlist. - The route-safe access reading still stays narrow:
D10remains the only clear public-open primary anchor whileD03 / D02 / D01still stay gated-support anchors in public wording. - Browser-level live checks before this source sync still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages also returnedLast-Modified: Wed, 01 Apr 2026 17:27:08 GMT, and the live route order still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle. - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session. - This source sync only refreshes the route-hold wording on the public entry pages. It does not widen the current claim surface.
What still stays fixed after the 00:03 JST actual-pull reread on April 2, 2026
- An actual-pull recheck at
2026-04-02 00:03 JSTaftermind-upload@cff3abab58e8,EEG-DATA@a885ef3f029d, andauto-research-funds@0f60872538dcstill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploadtightens deuterium operating-point wording outside the current six,EEG-DATAadds theDANDI 001187deep dive and now reportsmerged_unique=30875,high_confidence=28838, andaccess_counts_high.immediate=24492, andauto-research-fundscarries forward theIsono / Okabescholarship refresh without changing the practical shortlist. - The route-safe access reading still stays narrow:
D10remains the only clear public-open primary anchor whileD03 / D02 / D01still stay gated-support anchors in public wording. - Browser-level live checks before this source sync still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages also returnedLast-Modified: Wed, 01 Apr 2026 14:17:54 GMT, and the live route order still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle. - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 22:05 JST actual-pull reread on April 1, 2026
- An actual-pull recheck at
2026-04-01 22:05 JSTaftermind-upload@84e5337,EEG-DATA@bbb8d6c63d7, andauto-research-funds@5ff33413estill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploadclarifies clearance-route labels at the front door outside the current six,EEG-DATArefreshes deep-dive metadata while keepingmerged_unique=30873,high_confidence=28836,access_counts_high.immediate=24487, and18,312 / 28,832experiment-facing rows (63.51%coverage), andauto-research-fundsadds theYamaoka graduate scholarshipsnapshot plus README-facing stats refresh without changing the practical shortlist. - The route-safe access reading still stays narrow:
D10remains the only clear public-open primary anchor whileD03 / D02 / D01still stay gated-support anchors in public wording. - Browser-level live checks before this source sync still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the checked pages also returnedLast-Modified: Wed, 01 Apr 2026 12:13:54 GMT, and the live route order still named the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle. - A fresh read-only Todoist
api/v1/sync(items, projects)full-item audit still showed enough route coverage (items=203,projects=2,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 18:05 JST actual-pull reread on April 1, 2026
- An actual-pull recheck at
2026-04-01 18:05 JSTaftermind-upload@9984d0b,EEG-DATA@5fc1df00f07, andauto-research-funds@d7092c8e9still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploaddeepens wearableOPM / MEGroute synchronization and measurement-stack clarification outside the current six,EEG-DATAadds a continuous-pursuit EEG BCI deep dive and now reportsmerged_unique=30873,high_confidence=28836, andaccess_counts_high.immediate=24486, its experiment-metadata report still covers18,312 / 28,832rows with at least one experiment-facing field (63.51%coverage), andauto-research-fundskeeps the same practical shortlist after the recent carry-forward scholarship refresh. - The route-safe access reading still stays narrow: the refreshed local
EEG-DATAcatalog keeps widening, but the current public route still readsD10as the only clear public-open primary anchor whileD03 / D02 / D01still stay gated-support anchors in public wording. - Browser-level live checks with a browser user agent still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the currentLast-Modifiedheader isWed, 01 Apr 2026 08:22:51 GMTon those public surfaces, and the liveissue.htmlparagraph still names the same six in the same order before this run's new addendum. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items)full-item audit still showed enough route coverage (items=203,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 17:06 JST actual-pull reread on April 1, 2026
- An actual-pull recheck at
2026-04-01 17:06 JSTaftermind-upload@c5a0550,EEG-DATA@82893f6ca6e, andauto-research-funds@ec6f7d068still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploaddeepens astrocyte PET route splits outside the current six,EEG-DATAdeep-dives the KMI EEG dataset and now reportsmerged_unique=30871,high_confidence=28834, andaccess_counts_high.immediate=24484, its experiment-metadata report still covers18,312 / 28,832rows with at least one experiment-facing field (63.51%coverage), andauto-research-fundsadds theMegachips 2026 scholarshipsnapshot plus a README-stat refresh without changing the practical shortlist. - The route-safe access reading still stays narrow: the refreshed local
EEG-DATAcatalog still showsD03 / D02as catalog-side immediate rows andD01as a mixed immediate/check-needed pair, but the live-access read remains stricter, soD10remains the only clear public-open primary anchor whileD03 / D02 / D01still stay gated-support anchors in public wording. - Browser-level live checks with a browser user agent still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the currentLast-Modifiedheader isWed, 01 Apr 2026 07:16:09 GMTon those public surfaces, and the liveissue.htmlparagraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items)full-item audit still showed enough route coverage (items=203,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 14:09 JST actual-pull reread on April 1, 2026
- An actual-pull recheck at
2026-04-01 14:09 JSTaftermind-upload@ccef40f2f7cf,EEG-DATA@deefd5f95c6d, andauto-research-funds@f5f76c485ccbstill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploadclarifies presynaptic release-machinery ceilings outside the current six,EEG-DATAdeepens Mendeley EEG metadata and now reportsmerged_unique=30869,high_confidence=28832, andaccess_counts_high.immediate=24482, its new experiment-metadata report now covers18,312 / 28,832rows with at least one experiment-facing field (63.51%coverage), andauto-research-fundsrefreshes repo-level stats without changing the practical shortlist. - The route-safe access reading still stays narrow: the refreshed local
EEG-DATAcatalog still showsD03 / D02as catalog-side immediate rows andD01as a mixed immediate/check-needed pair, but the live-access read remains stricter, soD10remains the only clear public-open primary anchor whileD03 / D02 / D01still stay gated-support anchors in public wording. - Browser-level live checks with a browser user agent still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the currentLast-Modifiedheader isWed, 01 Apr 2026 04:20:02 GMTon those public surfaces, and the liveissue.htmlparagraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle (March 31, 2026 at 12:00 JST). - A fresh read-only Todoist
api/v1/sync(items)full-item audit still showed enough route coverage (items=203,Kura=2,Nakatani family=11,Nakatani graduate scholarship=5,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 12:06 JST actual-pull reread on April 1, 2026
- A second actual-pull recheck at
2026-04-01 12:06 JSTaftermind-upload@9f4bc8e760b1,EEG-DATA@1324f9e1ae2b, andauto-research-funds@6548b1650535still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploadalready keeps the route-hold wording public-safe,EEG-DATAnow reportsmerged_unique=30867,high_confidence=28830, andaccess_counts_high.immediate=24480, andauto-research-fundsrefreshes funding reread documentation without changing the practical shortlist. - The route-safe access reading still stays narrow:
D10remains the only clear public-open primary anchor, whileD03 / D02 / D01still stay gated-support anchors because the live-access read remains stricter than the catalog label. - Browser-level live checks with a browser user agent still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html; the currentLast-Modifiedheader isWed, 01 Apr 2026 02:26:28 GMTon those public surfaces, and the liveissue.htmlparagraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, andSecom General Research Grantremains closed for the current cycle. - No new Todoist route was introduced in this reread. The latest canonical funding-shortlist audit still already covers the current practical lanes, and the official recheck did not surface a new current-cycle funder.
What still stays fixed after the 11:06 JST actual-pull reread on April 1, 2026
- A latest actual-pull recheck at
2026-04-01 11:06 JSTaftermind-upload@aa21ab9855c1,EEG-DATA@cccd137a3468, andauto-research-funds@3a691196cb9fstill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still deepen route support rather than the current claim surface:
mind-uploadalready keeps the route-hold wording public-safe,EEG-DATAdeepens repository-wide metadata and now reportsmerged_unique=30866,high_confidence=28829, andaccess_counts_high.immediate=24479, andauto-research-fundsrefreshes repo-level stats without changing the practical shortlist. - The route-safe access reading still stays narrow:
D10remains the only clear public-open primary anchor, whileD03 / D02 / D01still stay gated-support anchors because the live-access read remains stricter than the catalog label. - Browser-level live checks still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html;Last-Modifiedadvanced toWed, 01 Apr 2026 01:21:12 GMTforissue.html/u8-1andWed, 01 Apr 2026 01:21:13 GMTfor the two bridge pages, and the liveissue.htmlparagraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grant,Secom General Research Grant, andBrain Science Foundation research grantremain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist
api/v1/sync(items)full-item audit still showed enough route coverage (items=203,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 03:09 JST actual-pull reread on April 1, 2026
- A latest actual-pull recheck at
2026-04-01 03:09 JSTaftermind-upload@31835fcd8daa,EEG-DATA@12eef8ca4ef0, andauto-research-funds@040e5b8798fdstill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still widen route support rather than the current claim surface:
mind-uploadsplit temporal routes for invasive language BCIs outside the current public-six packet,EEG-DATAadded a semantic-text-relevance deep dive that widens language-related backup coverage without displacingD10 / D03 / D02 / D01, andauto-research-fundsrefreshedObayashi / Yokogakucards without changing the practical current shortlist. - Browser-level live checks at
2026-04-01 03:09 JSTstill returned200forissue.html,mind-upload-current-public-six-rq-brief.html,mind-upload-rq-solvability-bridge.html, andu8-1-closed-loop-delay-tolerance-route.html, and the liveissue.htmlparagraph still names the same six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grantandSecom General Research Grantremain closed/watch outside the current-cycle lane. - A fresh read-only Todoist
api/v1/sync(items)full-item audit still showed enough route coverage (items=203,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1,AI for Aging-Society Problem Solving=0), so no new task was added in this session.
What still stays fixed after the 01:06 JST live-source recheck on April 1, 2026
- A second no-op actual-pull recheck at
2026-04-01 01:06 JSTafter nestedmind-upload@8da02e2e48e0,EEG-DATA@e6013384fa01, andauto-research-funds@c6a383f07a7bstill leaves the public batch and the solve-first order unchanged. - The current
EEG-DATAhead still supports the same bounded route rather than replacing it: the current-six familyD10 / D03 / D02 / D01and the outside-current-six familyD11 / D08 / D05 / D20are all still present in the repo, and public-safe wording still keepsD10as the only clear public-open primary whileD03 / D02 / D01stay gated-support anchors because the live-access read remains stricter than the catalog label. - Browser-level live checks at
2026-04-01 01:06 JSTstill returned200forissue.html,mind-upload-current-public-six-rq-brief.html,u8-1-closed-loop-delay-tolerance-route.html, andmind-upload-rq-solvability-bridge.html, so this run still keeps the public batch fixed. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grant,Secom General Research Grant, andBrain Science Foundation research grantremain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist
api/v1/syncfull-item audit still showed enough route coverage (items=204,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1), so no new task was added in this session.
What still stays fixed after the 00:12 JST actual-pull reread on April 1, 2026
- A latest actual-pull recheck at
2026-04-01 00:12 JSTaftermind-upload@e53a50b1256d,EEG-DATA@48f4814db5da, andauto-research-funds@76145d0e3f4cstill leaves the public batch and the solve-first order unchanged. - The current
EEG-DATAhead still supports the same bounded route rather than replacing it: the current-six familyD10 / D03 / D02 / D01and the outside-current-six familyD11 / D08 / D05 / D20are all still present in the repo, but public-safe wording continues to keepD10as the only clear public-open primary whileD03 / D02 / D01stay gated-support anchors because the live-access read still remains stricter than the catalog label. - Browser-level live checks at
2026-04-01 00:15 JSTstill returned200forissue.html,mind-upload-current-public-six-rq-brief.html, andu8-1-closed-loop-delay-tolerance-route.html, so this run keeps the public batch fixed and adds only a short reread note to the supporting route pages. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grant,Secom General Research Grant, andBrain Science Foundation research grantremain watch-or-closed outside the current-cycle lane. - A fresh read-only Todoist
api/v1/syncfull-item audit still showed enough route coverage (items=204,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1), so no new task was added in this session.
What still stays fixed after the 21:09 JST post-pull reread on March 31, 2026
- A latest pull recheck at
2026-03-31 21:09 JSTaftermind-upload@ed6f8203e46d,EEG-DATA@20fbbad9959f, andauto-research-funds@77f189662745still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still widen support rather than the current public claim surface:
mind-uploadtightened dataset-benchmark object rules and clarified the FAQ RNA route split,EEG-DATAadded request-gatedHBUEDemotion-recognition coverage plus a continuous-pursuit online BCI metadata deep dive, andauto-research-fundsaddedTeraura Sayoko outbound scholarship,Gakusho scholarship, and README-stat refreshes, but none of those changes replace the currentD10 / D03 / D02 / D01family or the outside-current-six orderU7-1 -> U1-2 -> U4-2 -> U8-1. - Browser-level live checks at
2026-03-31 21:09 JSTstill returned200forissue.html,mind-upload-current-public-six-rq-brief.html, andu8-1-closed-loop-delay-tolerance-route.html, and the liveissue.htmlparagraph still names the current six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grant,Secom General Research Grant, andBrain Science Foundation research grantremain outside the current-cycle lane. - A fresh read-only Todoist
api/v1/syncfull-item audit still showed enough route coverage (items=205,Kura=2,Nakatani family=11,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1), so no new task was added in this session.
What still stays fixed after the 19:07 JST post-pull reread on March 31, 2026
- A latest pull recheck at
2026-03-31 19:07 JSTaftermind-upload@b7b6c0498ae1,EEG-DATA@24e85cc20f09, andauto-research-funds@0fddd53bd03cstill leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still widen support rather than the current public claim surface:
mind-uploadstrengthened the front-door human-proxy split,EEG-DATArefreshed the catalog tomerged_unique=30860,high_confidence=28823, andaccess_counts_high.immediate=24471, andauto-research-fundsrefreshed Kioxia/Takayanagi funding records, but none of those changes replace the currentD10 / D03 / D02 / D01family or the outside-current-six orderU7-1 -> U1-2 -> U4-2 -> U8-1. - Browser-level live checks at
2026-03-31 19:09 JSTstill returned200forissue.htmlandmind-upload-current-public-six-rq-brief.html, and the liveissue.htmlparagraph still names the current six in the same order. - Official window spot checks still keep the practical bridge narrow:
Kura Fund = 2026-02-02 - 2026-04-17 17:00,Nakatani Foundation graduate scholarship = 2026-04-01 - 2026-05-25 15:00,Kashinome Scholarship = 2026-01-14 - 2026-04-09, whileNakatani Foundation research grantandSecom General Research Grantare already closed for the current cycle. - A fresh read-only Todoist full-item audit still showed enough route coverage (
items=205,Kura=2,Nakatani family=11,Nakatani graduate scholarship=7,Kashinome=2,Secom=3,Brain Science Foundation=8,Okawa=2,Japan Industrial Science Research Institute=1), so no new task was added in this session.
What still stays fixed after the 17:06 JST post-pull reread on March 31, 2026
- A latest pull recheck at
2026-03-31 17:06 JSTaftermind-upload@4731680627ff,EEG-DATA@3e7a53d9ca8, andauto-research-funds@ef2924014a65still leaves the public batch and the solve-first order unchanged. - The newest
EEG-DATAadditions widen the support map rather than the current route: the NTU Dataverse adult-to-infant unidirectional neural-coupling raw/preprocessed releases are immediately downloadable and useful for future social-learning or paired-observer rows, while OpenNeurods007146adds a large auditory MEG/EEG/Ear-EEG record that still staysuncertain_publicbecause the visible public object tree does not yet verify the claimed raw EEG / Ear-EEG coverage. - Recounting the
### Ux-yheadings in the RQ-by-RQ dossiers still returns60, so this run does not widen the queue by collapsing rows together. - Browser-level live checks with a browser user agent still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html, andu8-1-closed-loop-delay-tolerance-route.html. - The practical reading therefore still stays narrow:
Kura Fund,Nakatani Foundation graduate scholarship, andKashinome Scholarshipremain the active bridge for the current six,Secom General Research Grantis already closed for the current cycle (March 31, 2026 at 12:00 JST) and stays only as a carried-forward watch record, and no new Todoist item was created in this session.
What still stays fixed after the 16:05 JST post-pull reread on March 31, 2026
- A latest pull recheck at
2026-03-31 16:05 JSTaftermind-upload@a11240d38415,EEG-DATA@f318ac8ce42d, andauto-research-funds@c95cc61fdfc9still leaves the public batch and the solve-first order unchanged. - The newest pulled deltas still do not widen the current public claim surface:
mind-uploadtightened the connectome / timing-state route cards,EEG-DATAadded anOSF eucqfdeep-dive refresh, andauto-research-fundsadded newTakeda / Nohkencard material, but none of those changes replace the currentD10 / D03 / D02 / D01family or the outside-current-six orderU7-1 -> U1-2 -> U4-2 -> U8-1. - Browser-level live checks in this run still returned
200forissue.html,mind-upload-current-public-six-rq-brief.html, andu8-1-closed-loop-delay-tolerance-route.html, so this run does not add new prose to the public site. - A fresh Todoist
api/v1/sync(items)full-item audit still shows the route families already covered (items=205,Kura=2,Nakatani family=11,Kashinome=2,Secom family=3), so no new task was added in this run. - The practical reading therefore stays unchanged:
Kura Fund,Nakatani Foundation graduate scholarship, andKashinome Scholarshipremain the active narrow bridge for the current six, whileSecom General Research GrantandNakatani Foundation research grantstay next-cycle watch routes only.
What stays fixed on March 31, 2026
-
A March 31 post-pull recheck at
2026-03-31 09:04 JSTaftermind-upload@8cc3379,EEG-DATA@715ecdf, andauto-research-funds@6166f60still leaves the public batch and the solve-first order unchanged. -
The newest pulled deltas widen the map but do not widen the current public claim surface: the astrocyte / SV2A route refinements, the
U1-2funding-sync packet, and theZenodo HEP ERPdeep-dive additions do not replaceD10or turnD03/D02/D01into immediate public anchors. -
The outside-current-six headline queue of four also stays unchanged:
U7-1remains the cleanest public-openA-tierfollow-up,U1-2remains the next narrow inverse-estimation packet,U4-2remains the minimal causal-intervention packet, andU8-1remains the bounded closed-loop delay-tolerance packet.U7-2now sits explicitly besideU7-1as the adjacent timing-metric support packet rather than as a headline-queue replacement. If you want the exact row packets, continue with the U7-1 route packet, the U7-2 route packet, the U1-2 route packet, the U4-2 route packet, and the U8-1 route packet. -
At
2026-03-31 00:04 JST, an overnight recheck still leaves the public batch and the solve-first order unchanged. -
A March 31 access audit at
2026-03-31 00:20 JSTstill leaves the batch unchanged, but it narrows the anchor reading:D10 3M-CPSEEDremains the only clearly public-open primary anchor in the current six. -
D03 Multimodal Fusion EEG + Eye-Tracking,D02 CSTE, andD01 Acquisition delay of wireless EEGcurrently resolve to IEEE DataPort pages that showLOGIN TO ACCESS DATASET FILESandSubscription Required, so public wording now keeps them only as subscription-gated support anchors rather than immediate public anchors. -
When the live access audit and the catalog auto-label disagree, this page follows the live access audit for public-safe wording and keeps the catalog label only as a planning hint.
-
Kura Fundremains open through April 17, 2026 at 17:00,Nakatani Foundation graduate scholarshipruns April 1, 2026 through May 25, 2026 at 15:00, andKashinome Scholarshipremains open through April 9, 2026. -
A March 31 official-window recheck at
2026-03-31 14:07 JSTleaves the practical lanes unchanged, but it does move one clock-sensitive item: theSecom General Research Grantis no longer a same-day watch in this run because the March 31, 202612:00 JSTdeadline has already passed, so it now stays only as a next-cycle watch record. -
A March 31
14:07 JSTTodoist full-item audit viaapi/v1/syncstill shows the current route already covered (items=205,Kura=2,Nakatani family=11,Kashinome=2,Secom family=3), so no new task was added in this run. -
Earlier March 30 notes on this page that treated
D03/D02/D01as immediate public routes should now be read as superseded by the March 31 access audit. -
A March 31 cross-repo synthesis also rechecked public-open alternative EEG families for the current six. Those alternatives remain useful as secondary support, but they still do not displace the current
D10/D03/D02/D01route family or raise the public claim ceiling. -
The current row packets now also expose one compact
first-pass KPI bundle + stop ruleper row, so readers can see what would stop the route before the claim widens. -
The public batch stays
U13-2 / U13-5 / U0-2 / U0-3 / U14-4 / U14-2. -
The execution order stays
U13-2 -> U13-5 -> U0-2 -> U0-3 -> U14-4 -> U14-2. -
D10 3M-CPSEEDremains the only clearly public-open primary anchor. -
D03 Multimodal Fusion EEG + Eye-Tracking,D02 CSTE, andD01 Acquisition delay of wireless EEGremain in scope only as subscription-gated support anchors. -
Kura Fundremains open through April 17, 2026,Nakatani Foundation graduate scholarshipruns April 1, 2026 through May 25, 2026 at 15:00,Kashinome Scholarshipremains open through April 9, 2026, andSecom General Research Grantis already closed for the current cycle (deadline: March 31, 2026 at 12:00 JST) so it stays only as a next-cycle watch record.
Row packets after the March 30 post-pull reread
The route is unchanged, but each active row now also carries one submission-ready title, one explicit reason why the present EEG anchor is enough for a first artifact, one compact KPI bundle, and one explicit stop rule that keeps the claim narrow.
| RQ | Submission-ready title | Why the current EEG anchor is enough now | Funding bridge that still fits | Why the public claim still stays narrow |
|---|---|---|---|---|
U13-2 |
Neural-contribution audit for imagined speech with a brain-minus-prior control |
D10 3M-CPSEED still gives a public OpenNeuro route with overt, silent-intended, and imagined speech inside one release, so a decoder can be tested against a bounded brain-minus-prior control family instead of a pure language prior. |
Kura Fund, then Nakatani Foundation graduate scholarship |
This can separate a narrow decoding artifact from a prior-only shortcut, but it does not establish preserved internal mechanism, preserved identity, or successful mind preservation. |
U13-5 |
Perception-to-recall transfer-gap benchmark for mimic separation |
D03 Multimodal Fusion EEG + Eye-Tracking still fixes the intended paired EEG + gaze planning route, but the visible IEEE DataPort metadata is a 55-student cognitive-load dataset with Chinese column guidance and no recall-specific label exposed on the public page, so this row stays only as a gated planning anchor plus an external recall-validity requirement. |
Kura Fund, then Nakatani Foundation graduate scholarship |
A shared decoder route can support a bounded transfer-gap note, but it does not by itself justify a stronger preserved-mechanism reading. |
U0-2 |
Temporal-validity-aware identity drift audit with offset, jitter, and state-feature collapse |
D02 CSTE still fixes the intended cross-session / cross-task biometric floor, but the current IEEE DataPort page is subscription-gated, so public wording treats it as a gated support anchor rather than an immediate public anchor. |
Nakatani Foundation graduate scholarship, then Kashinome Scholarship |
This can audit timing and state-feature failure, but it does not settle legal, philosophical, or normative identity continuity. |
U0-3 |
Task-specific threshold stability and overfit-exclusion benchmark for identity drift |
The same D02 anchor still fixes the intended threshold-governance floor, but public wording now keeps it only as a subscription-gated support anchor rather than a public-open anchor. |
Nakatani Foundation graduate scholarship, then Kashinome Scholarship |
A stable threshold can still remain only a bounded benchmark artifact, not a sufficient condition for personhood continuity or branch-identity resolution. |
U14-4 |
Card-integrated reproducibility contract for the current public batch |
D01 Acquisition delay of wireless EEG still marks the intended latency/disclosure floor, but the visible package is a latency-and-synchronization dataset rather than a rerun benchmark by itself, so the row stays only as a gated support route and needs D13 before stronger public reproducibility wording. |
Kura Fund; Nakatani Foundation research grant as next-cycle watch |
Filled card fields can improve disclosure discipline, but they do not by themselves demonstrate field-wide reproducibility, deployment readiness, or standards adoption. |
U14-2 |
Fixed-split rerun contract for exploration versus confirmation |
The same D01 route still marks the intended latency-first split boundary, but the visible package is delay/synchronization-heavy, so public wording keeps it only as a gated support anchor and still needs D13-backed rerun examples before stronger confirmatory wording. |
Kura Fund; Nakatani Foundation research grant as next-cycle watch |
A fixed split and negative-case trail can bound rerun discipline, but they do not license confirmatory wording for exploratory outputs or broad rerun-robustness claims. |
Current public six at a glance
| RQ | Current question focus | Current anchor | First artifact to close next | Current funding bridge | Keep outside the public claim |
|---|---|---|---|---|---|
U13-2 |
Connect hallucination / inconsistency checking to neural decoding evaluation. | D10 3M-CPSEED (10.18112/openneuro.ds006465.v2.0.0, immediate) |
Brain-minus-prior control table and mimic-separation note |
Kura Fund, then Nakatani Foundation graduate scholarship |
Preserved internal mechanism, preserved identity, or successful mind preservation |
U13-5 |
Freeze where performance branches between perception and recall under a shared decoder. | D03 Multimodal Fusion EEG + Eye-Tracking (10.21227/6106-6120, subscription-gated support) |
Perception-to-recall degradation note and transfer-gap table | Kura Fund, then Nakatani Foundation graduate scholarship |
Any stronger mechanism-preservation reading |
U0-2 |
Fix the timing budget before identity-like wording absorbs measurement error. | D02 CSTE (10.21227/j162-nh61, subscription-gated support) |
Offset/jitter distribution and state-feature collapse audit | Nakatani Foundation graduate scholarship, then Kashinome Scholarship |
Legal, philosophical, or normative identity continuity |
U0-3 |
Fix threshold stability only after the timing floor is bounded. | D02 CSTE (10.21227/j162-nh61, subscription-gated support) |
Threshold-stability note and overfit-exclusion rule | Nakatani Foundation graduate scholarship, then Kashinome Scholarship |
Treating a stable threshold as sufficient for personhood continuity |
U14-4 |
Turn card fields into a concrete rerun checklist. | D01 Acquisition delay of wireless EEG (10.21227/dv1p-vq18, subscription-gated support) |
Filled Model Card / Dataset Card examples | Kura Fund; Nakatani Foundation research grant as next-cycle watch |
Field-wide reproducibility, deployment readiness, or standards adoption |
U14-2 |
Make the exploration / confirmation split operational. | D01 Acquisition delay of wireless EEG (10.21227/dv1p-vq18, subscription-gated support) |
Fixed-split rerun contract and negative-case trail | Kura Fund; Nakatani Foundation research grant as next-cycle watch |
Presenting exploratory outputs as confirmatory evidence |
How to deepen this batch without flattening it
U13-2 -> U13-5is still the speech-side contribution stack: first keepbrain-minus-priorhonest onD10, then ask where the transfer route breaks when the row moves from perception to recall.U0-2 -> U0-3is still the identity-drift floor: first bound timing error on theD02route, then ask whether the threshold survives once the timing floor is fixed. The least-distorting public-open stress tests remainds004148andds007216, but they still stay backup-only.U14-4 -> U14-2is still the reproducibility-contract stack: first turn disclosure fields into filled cards on theD01floor, then freeze the exploration-versus-confirmation split.D13remains the first public-open rerun family those two rows would need next.U7-1 -> U7-2 -> U1-2now sits just outside the batch as the public-open infrastructure floor:D11keeps the synchronization contract readable in public, the adjacentU7-2packet fixes which timing errors become release-block metrics on that sameD11family, andD08keeps the inverse-uncertainty route grounded without forcing a batch switch.
First-pass KPI bundle and stop rule sync
This run does not widen the batch. It only makes the current public six explicit enough that each active row now has one KPI bundle and one stop rule before the route is widened or moved into stronger wording.
| RQ | First-pass KPI bundle | Stop rule before the row can widen |
|---|---|---|
U13-2 |
semantic alignment, brain-minus-prior gap, misalignment rate |
Stop if the brain-minus-prior gap collapses toward a prior-only baseline or if misalignment rate stays unstable across sessions. |
U13-5 |
perception-to-recall degradation point, transfer gap, control-condition stability |
Stop if the degradation point and the transfer gap fail to stay ordered after the control-family rerun. |
U0-2 |
clock-offset p95, jitter p95, state-feature collapse rate |
Stop if re-synchronization does not shrink the drift floor or if state-feature collapse rate remains above the bounded ceiling across sessions. |
U0-3 |
session-out AUC, threshold stability, overfit-exclusion rate |
Stop if the threshold order flips across sessions or if accepted models remain split-specific after the overfit screen is applied. |
U14-4 |
required-card fill rate, rerun success rate, leak-audit coverage |
Stop if fuller cards do not improve rerun traceability or if leak-audit fields remain missing in negative-case examples. |
U14-2 |
fixed-split compliance rate, rerun success rate, explore-to-confirm carryover gap |
Stop if split violations remain necessary to preserve the result or if the explore-to-confirm carryover gap collapses on rerun. |
What each row can and cannot solve with EEG right now
| RQ | EEG-DATA fact that keeps the row real | What EEG can close now | What still needs outside support | Submission wording that stays honest |
|---|---|---|---|---|
U13-2 |
D10 still gives 20 participants x 4 sessions, overt / silent-intended / imagined speech, raw BIDS, and phase-split derivatives inside one public release. |
A bounded brain-minus-prior audit plus a mimic-separation note. |
An external language-evaluation layer, a broader leak-control family, and any claim about preserved mechanism or identity. | Neural-contribution audit for imagined speech with a brain-minus-prior control |
U13-5 |
D03 still fixes the intended paired EEG + gaze planning route, but the visible IEEE DataPort metadata is a 55-student cognitive-load dataset with Chinese column guidance and no recall-specific label exposed on the public page, so the row now stays only as a gated planning anchor. |
A perception-to-recall degradation note and a transfer-gap table. | An external recall-validity layer, a public-open EEG+ET backup family, and any stronger mechanism-preservation wording. | Perception-to-recall transfer-gap benchmark for mimic separation |
U0-2 |
D02 still fixes the intended cross-session / cross-task biometric floor, but the current IEEE DataPort page is subscription-gated, so public wording keeps it only as a gated support anchor. |
An offset / jitter distribution plus a state-feature collapse audit. |
Longer-horizon timing logs, larger cohorts, and any legal or philosophical continuity interpretation. | Temporal-validity-aware identity-drift audit |
U0-3 |
The same D02 route still fixes the intended threshold-governance floor, but the current IEEE DataPort page is subscription-gated, so public wording keeps it only as a gated support anchor. |
A threshold-stability note and an overfit-exclusion rule. | A session-external rerun pack, cohort extension, and any personhood-continuity reading. | Task-specific identity-threshold stability study |
U14-4 |
D01 still marks the intended latency/disclosure floor, but the visible package is a latency-and-synchronization dataset rather than a rerun benchmark by itself, so the row now stays only as a gated support route. |
Filled Model Card / Dataset Card examples for the current batch. | D13-backed rerun examples, leak-audit exemplars, and any field-wide reproducibility or standards-adoption wording. |
Disclosure-first reproducibility contract package |
U14-2 |
The same D01 latency-first route still marks the intended split boundary, but the visible package is delay/synchronization-heavy rather than a stand-alone rerun family, so the row now stays only as a gated support route. |
A fixed-split rerun contract and a negative-case trail. | D13-backed split-violation examples across richer public benchmarks and any stronger confirmatory-readiness claim. |
Exploration-confirmation split contract for reruns |
Best public-open support family when the main anchor is gated
These support families do not replace the current gated-support planning anchors. They only show the cleanest public-open backup family for readers who want to inspect what can still be stress-tested without access-gated datasets.
| RQ | Best public-open support family | Why it helps | Why it still does not replace the current planning anchor |
|---|---|---|---|
U13-5 |
D10 3M-CPSEED, ChineseEEG-2, ZuCo 2.0, SparrKULee, and spoken + imagined robot-speech EEG |
D10 keeps the speech-side control family public-open, ChineseEEG-2 adds a maintained reading/listening semantic-alignment family, ZuCo 2.0 restores a public EEG+ET paired-stream family, SparrKULee adds a larger auditory-only decoding benchmark, and the robot-speech route keeps overt/imagination stress tests inspectable without a gated page. |
None of them exposes a clean recall-labeled branch point on the public route, so they remain backup-only until recall validity is fixed. |
U0-2 |
A test-retest resting and cognitive state EEG dataset, then A multi-session simultaneous EEG-fMRI dataset with online experience sampling |
They give the strongest public-open retest ladder and the strongest public-open multi-session provenance ladder. | They are strong stress-test families, but they do not replace the direct cross-session / cross-task biometrics framing that keeps D02 primary in planning. |
U0-3 |
A test-retest resting and cognitive state EEG dataset, then A multi-session simultaneous EEG-fMRI dataset with online experience sampling |
They give the cleanest public-open rerun ladder for checking whether the threshold rule survives outside one session or one preprocessing path. | They still do not match the intended identity-drift floor as directly as D02, so they remain support rather than replacement. |
U14-4 |
D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications, then D08 Simultaneous human intracerebral stimulation and HD-EEG |
D13 is the first required public-open rerun family before stronger disclosure wording, and D08 is the clearest grounded validation-field family after that. |
They are useful only after the first latency/disclosure floor is fixed; neither replaces D01, but D13 is the support family the row would need next. |
U14-2 |
D13 A New Benchmark Dataset Towards Ubiquitous P300 ERP-based BCI Applications, then D08 Simultaneous human intracerebral stimulation and HD-EEG |
D13 is the first required public-open split-violation example family, and D08 gives a stronger validation-style failure family after that. |
They help widen rerun examples later, but they do not replace the latency-first split boundary that keeps D01 primary in planning. |
Row-by-row brief
U13-2
- Question focus: whether hallucination and consistency checks can be connected to neural decoding evaluation without treating decoder success as a mind-preservation result.
- Why
D10stays the strongest anchor: the local mirror still exposes a public OpenNeuro route with20 participants x 4 sessions, overt, silent-intended, and imagined speech inside the same release, plus raw BIDS and phase-split derivatives. - What this anchor is strong enough to close now: a
brain-minus-priorcontrol family, a narrow mimic-separation note, and a bounded inconsistency audit. - Submission wording that stays honest:
Neural-contribution audit for imagined speech with a brain-minus-prior control. - What still needs outside support: an external language-evaluation layer and a broader leak-control family before any stronger mechanism wording is allowed.
- What still stays outside the claim: preserved internal mechanism, preserved identity, and any stronger mind-upload wording.
- If you need the row-specific anchor-choice rationale, read the U13-2 route packet.
U13-5
- Question focus: where a shared decoder begins to fail when the route moves from perception to recall.
- Why
D03remains only a gated support route: the intended paired EEG + eye-tracking target is still useful for the row, but the visible IEEE DataPort metadata is a55-student cognitive-load dataset with Chinese column guidance and no recall-specific label exposed on the public page, so public wording must stay narrower than an immediate-public-anchor reading. - What this anchor is strong enough to close now: a perception-to-recall degradation note and a transfer-gap table that stay explicitly narrow.
- Submission wording that stays honest:
Perception-to-recall transfer-gap benchmark for mimic separation. - What still needs outside support: an external recall-validity layer and a public-open speech/EEG+ET backup family before any shared-mechanism reading is attempted.
- What still stays outside the claim: any statement that a shared decoder demonstrates a shared preserved internal mechanism.
- If you need the row-specific anchor-choice rationale, read the U13-5 route packet.
U0-2
- Question focus: how to keep identity-like wording from collapsing into unbounded measurement error.
- Why
D02remains only a gated support floor: the intended dataset is still explicitly cross-session and cross-task and stays tied to10 participants, but the current IEEE DataPort page is subscription-gated, so public wording cannot treat it as an immediate public anchor. - What this anchor is strong enough to close now: an
offset / jitterdistribution plus astate-feature collapseaudit. - Submission wording that stays honest:
Temporal-validity-aware identity-drift audit. - What still needs outside support: longer-horizon timing logs and larger cohorts before the row can be read as anything more than a bounded drift benchmark.
- What still stays outside the claim: legal, philosophical, or normative continuity claims.
- If you need the row-specific anchor-choice rationale, read the U0-2 route packet.
U0-3
- Question focus: how to make threshold stability interpretable only after the timing route is already bounded.
- Why the same
D02anchor stays in scope only as gated support: threshold stability remains meaningful only when it sits on the same intended cross-session / cross-task floor asU0-2, but the current IEEE DataPort page is subscription-gated, so public wording must stay narrower than an immediate-access reading. - What this anchor is strong enough to close now: a threshold-stability note and an overfit-exclusion rule that stay benchmark-like and narrow.
- Submission wording that stays honest:
Task-specific identity-threshold stability study. - What still needs outside support: a session-external rerun pack and cohort extension before this row can carry anything stronger than a bounded biometric threshold claim.
- What still stays outside the claim: treating a stable threshold as sufficient for personhood continuity or branch-identity resolution.
- If you need the row-specific anchor-choice rationale, read the U0-3 route packet.
U14-4
- Question focus: how to make disclosure fields concrete enough to matter for reruns.
- Why
D01is still useful only as a bounded entry point: the visible package is a wireless delay and synchronization dataset rather than a rerun benchmark by itself, but it is still enough to force latency and measurement fields into a real Model Card / Dataset Card example without claiming field-wide standardization. - What this anchor is strong enough to close now: filled card examples for the current public batch.
- Submission wording that stays honest:
Disclosure-first reproducibility contract package. - What still needs outside support:
D13-backed rerun benchmarks and leak-audit exemplars before any broader reproducibility claim is made. - What still stays outside the claim: organizational adoption, field-wide standards uptake, or a broad reproducibility victory statement.
- If you need the row-specific anchor-choice rationale, read the U14-4 route packet.
U14-2
- Question focus: how to make the exploration / confirmation split operational instead of aspirational.
- Why the same
D01anchor still works: the latency-first measurement route is enough to freeze a fixed split plus rerun boundary, but it still needsD13as the first public-open rerun family before stronger confirmatory wording is attempted. - What this anchor is strong enough to close now: a fixed-split rerun contract and a negative-case trail that remain explicitly narrow.
- Submission wording that stays honest:
Exploration-confirmation split contract for reruns. - What still needs outside support:
D13-backed split-violation examples across richer public benchmarks before the row can be read as broader confirmatory readiness. - What still stays outside the claim: broader rerun robustness claims or confirmatory wording for exploratory outputs.
- If you need the row-specific anchor-choice rationale, read the U14-2 route packet.
What this page does not do
- It does not replace the wider
60RQmap. - It does not expand the public batch beyond the current six.
- It does not move theory, law, neurorights, or full identity questions into an EEG-only solved state.