The majority of the risks the team will face is in the prototype stage since one minor failure in the components may lead to a catastrophic failure in the entire design. These risks include:

  • The device must not fail at any circumstances since this may lead to catastrophic outcomes.
  • The device must be waterproof, as a major aspect of our design invlovles its submersion in water. All components of the design must be waterproof so the device does not malfunction.
  • The device must be eqipped with a battery that enables at least a full day's worth of function.

Our team communicated with Thales to refine our project after the first audit to ensure the team follows the right path. Risks and constraints stated from the past audit have been significantly altered to represent a refined idea of the project.