119 |
Auslieferungsversion 2nd Generation |
Release |
|
157 |
New certificate, 0 degree pass-through |
Release |
20.03.2024 |
160 |
Parallel communication ( MQTT ) |
Release |
30.04.2024 |
163 |
Charge and discharge at the same time |
Release |
09.05.2024 |
|
|
|
|
200.1 |
Temporary-cancel low current restart |
Release |
30.05.2024 |
208 |
New certificate, 0 degree pass-through |
Release |
16.04.2024 |
210.26 |
New parallel machine ( MQTT ) and cancellation of small current |
Release |
04.06.2024 |
211.1 |
Temporary minor version 6.4 |
Beta |
|
212.18 |
Optimize NEP |
Release |
27.06.2024 |
214.2 |
Return to pass-through |
Release |
09.07.2024 |
215.1 |
Testing AP Micro-inverter |
Beta |
16.07.2024 |
215.3 |
Parallel connection ( MQTT ) is lost, restart to search |
Beta |
19.07.2024 |
215.4 |
beta |
beta |
08.08.2024 |
200.5 |
Test package cutting failure for customers |
Beta |
08.08.2024 |
215.5 |
Test CT for customers using microinverters with rated power other than 800W |
Beta |
15.08.2024 |
216.17 |
Forced charging, CT search, AP compatibility |
Release |
16.08.2024 |
217.21 |
Packets cannot be cut when fully charged. Determine the dod before searching for the CT channel. |
Beta |
21.08.2024 |
217.22 |
1. When all packages are fully charged, package cutting is not allowed. - 2. Before searching for the CT channel, if the current packet undervoltage or dod situation occurs, the CT channel cannot be searched for; there are two ways to relieve it: a. Exit the CT mode.b. Charge the device input until the dod is released. - 3. Use mqtt high-frequency access to modify the correct channel voltage value. |
Beta |
28.08.2024 |
217.23 |
Eliminate secondary overcharge protection detection |
Beta |
03.09.2024 |
217.24 |
Solved the problem that the output power is lower than the setting according to customer feedback |
Beta |
04.09.2024 |
217.25 |
Set single-channel output when power is less than half of the rated power of the micro-inverter |
Beta |
06.09.2024 |
218.7 |
1. Change the output backflow judgment voltage from 16V to 30V 2. Increase the time period to 5 segments 3. Support OTA upgrade with power supply package |
Release |
11.10.2024 |
220.11 |
TBD |
TBD |
22.11.2024 |
220.12 |
TBD |
TBD |
29.11.2024 |
221.1 |
TBD ( Transitionspaket: 220.x -> 221.1 ( 222.1 ) -> 224.x ) |
Beta |
12.01.2025 |
224.3 |
Add support for more Smart Meters (CT002, CT003, Shelly Pro 3EM, Shelly EM Gen3, Shelly Pro EM50) |
Beta |
17.01.2025 |
224.5 |
Small fixes for Smartmeter support |
Beta |
26.02.2025 |
224.8 |
TBD |
TBD |
11.03.2025 |
224.14 |
TBD |
TBD |
24.03.2025 |
226.5 |
new crypto layer, like hmj-108+ |
TBD |
18.04.2025 |