Calendar - team806/KnowledgeBase GitHub Wiki

DRAFT (living document esp. during 2026 season)

Dates are written with respect to events (e.g., SR + 7 is one week after Season Reveal, T1 - 1 is moving night of first tournament)

  • SR = Season Reveal
  • SC = subsystem completion (subsystem considered substantially built, but still can have modifications not altering fundamental structure and operation)
  • RC = robot completion (robot considered substantially built, but still can have modifications not altering fundamental structure and operation)
  • T1, ..., TL = practice date of 1st, ..., last tournament (e.g., T1 + 1 is
  • P1, ..., PL = ? date of 1st, ..., last post-season tournament
By We Should
SR + 1 Have basic structure of subsystems matching initial proposal
SR + 7 Subsystems implementation complete
SC + 7 Subsystem and commands coded, PID controllers tuned, offsets determined
T1 - 3 Code complete