Day In the Life Testing - spacecraft-design-lab-2019/documentation GitHub Wiki
Testing Plan:
See below for most updated test plan:
https://docs.google.com/document/d/11R6fdOSXOyNj1tuCXO6cz3kYzjBOOEA4g61e3QUaVng/edit
Deliverables:
- Data on the status of the testing 'ground station'. Final numbers on attenuation.
- Possible useful contingencies to test.
- Updates/final results on sun lamp effectiveness.
- Exact app to use to measure magnetorquer.
Zac's Thoughts 2/1/2020:
- Release the kill switches, turn it on. Verify that satellite deploys and does the things after waiting.
- Verify deployment and beacon packets.
- Fake ground station that does the commands.
- Sun lamp to each panel independently.
- Leave running?
- Yes attenuation and ask for details.
- Compass app on the phone, moment in the right direction. There's an app for this.
- Get some lamps and IR filters from solar. They are coming at some point?!? IR mirror and lamps.
Links and Resources:
Magnetometer App: https://apps.apple.com/us/app/tesla-metal-detector-and-magnetic-field-recorder/id990674516