Production Work order general Work order document WO document items Edit work order item Bill of materials tab Edit BOM position - robinfeng/beashelp GitHub Wiki
编辑 BOM 位置
Navigation: Production > Work order general > Work order document > WO document items > Edit Work Order Item > Bill of Materials tab: Edit BOM position No contents entries on this page Contents
Work orders Work order document Work order item Edit work order item
MS Project
BOM
Edit BOM
Routing
Calculation
The current item is always displayed at the top, even if switching to the lower tabs.
Field Meaning Position Position number Item Item can be selected. Click on the drop down icon to open the selection window. Right click: you can pre-select only purchase parts or only in-house production, to narrow down the item range. Recylce remains, Recursion: See Master data - BOM Description Item description Drawing number optional
Tabs General Extended Costs Right click menu
General tab Field Meaning Quantity Required quantity per assembly to be produced according to column "per" All entries in BOM item are given in warehouse units. See: Quantity units
In contrast to master data quantities in consumption units are converted directly to consumption units. Quantities in consumption units are not taken into account in production BOM position.
After changes, the price is revalued. Previous pricing (planned costs) is overwritten. per Column "per" refers to "per" assembly to be produced. A value of 0 means, the given quantity is a fixed value, the total quantity is independent of the assembly quantity see master data - Edit BOM Fixed quantity surcharge fix surcharge for this operation. Example: qty 3, qty per 10, fixed qty 5 100 pieces are produced material requirement arises: 3 * 100 : 10 + 5 = 35 pieces Calculated scrap hmtoggle_plus1 Calculated from scrap values This value is calculated when the work order is created, it can not be changed. It is a one time surcharge. (Assembly quantity * BOM quantity) + "calculated scrap" If the assembly quantity is changed, the "calculated scrap" does not change. To re-calculate, a work order update is required.
See
- scrap factors in routing, see routing - material scrap
- scrap of superordinate assembly or phantom assembly, see scrap
- offcut factor of superordinate assembly or phantom assembly, see offcut factor
For purchase parts additionally
- scrap as per master data, see scrap
- off-cut factor as per item master, see offcut factor
Note: If in BOM position "Do not post scrap" is activated, scrap will not be determined.
See: Master data - edit BOM Offcut Option consider offcut
Rounding type Select from rounding types See Rounding types Rounding Dec Number of decimals for rounding Routing-position At which routing position the material is required see master data - edit BOM Warehouse hmtoggle_plus1 Warehouse, from which by default material is issued Warehouse can be indicated already in BOM setup. If there was nothing entered, the warehouse is determined automatically when the work order is created. In Production - BOM item the warehouse is mandatory, it cannot be deleted. L Item length W Item width H Item height Additional text free text Closed Hooklet, if closed. Right "reactivate" to re-open.
Extended tab Field Meaning Matchcode optional Material group selected material group Raw material selected raw material Density density Project Project link. Display from work order item. Read only. Task Refers to project tasks. Can be used to link the material item to a project task. Delivery date Planned delivery date. Only info. Barcode hmtoggle_plus1 Unique Bar code for this BOM item Using this bar code, the item is determined. In various posting screens the BOM item can be selected directly using this number. See manual receipt Variant Variant (from assembly) Configuration Configuration ID (from assembly) Issue remains Charge-off batch stock from a quantity of See item - edit BOM Only reservation Post only reserved items See item - edit BOM Image Stored Image Color Stored Color Receipt already posted quantity Issue already posted quantity
Costs tab Field Meaning Material costs hmtoggle_plus1 Material costs for this BOM item Used as reference for planned costs
Pricing: See Configuration wizard - Pre-calculation - Material pricing If the work order is created from a pre-calculation, prices from pre-calculation are used.
If changing the supplier or the quantity, a new pricing is performed. If special price lists are to be considered, these have a higher priority see Configuration wizard - Pre-calculation - Material pricing
Surcharge marginal costs Surcharge from master data (changeable) See Material group Surcharge full costs Surcharge from master data (changeable) See Material group
Right click Function Meaning New Create new work order item Copy Create new BOM item for work order item Delete Delete work order item Reports Open list of stored reports Journal Open journal Inventory history Open inventory history for the item Change log Change log for this work order Position reactivate Re-open the work order item if it had been closed Formula allocation for active input Formula allocation: use to assign a formula or table to the active field Formula list List of all formulas stored in this operation.
back to manufacturing position BOM tab
返回 主页