Production Work order general WO structure Window setting WO structure view - robinfeng/beashelp GitHub Wiki
生产工单结构视图窗口设置
Navigation: Production > Work order general > WO structure: Window settings WO structure view No contents entries on this page Contents Can only be accessed via right click menu in work order structure view - 3. tab
linktraining Video: Window settings work order screen
Function Field Meaning Open search window first hmtoggle_plus1 Query before opening the list
If this option is enabled, a selection screen opens first.Then, the work order can be selected.
Advantage: faster selection with many work orders in data base.
Variable auftr_str_suchmaske, Standard N Extended status display hmtoggle_plus1 Visibility of icons indicating work order status
In work order structure right to the work order icons are displayed, indicating whether postings or time receipts have been created.
For large databases this can lead to low performance. Use this switch to disable the display.
Variable fertstructur_estatus, Standard J Integrated batch tracing hmtoggle_plus1 Activate integrated batch tracing
If this option is enabled, click on a batch in work order structure to view all related transaction documents displayed right below the batch (posting in the batch or from which other batch this batch derived)
Note: max. 50 transactions are displayed per batch
If a single batch is moved very often, the overview can be lost. For this reason, this option should not be activated in such cases. Better use the function "batch tracing"
Serial number related items are also affected.
beas9.0-000-003-051, Variable ftstr_tracer Standard: N
View
Bill of Materials
Field
Meaning
BOM multiple postings
Clicking on a BOM item, generally the function „material issue" instead of „Item x issue“ is displayed.
For collective posting action (eg. click on assembly, work order or at multiple selection) „material issue“ is displayed, by which several BOM items can be charged off at once.
BOM single posting
Click on a BOM item, the feature „issue item x“ is displayed (downward compatibility)
Routing Field Meaning Routing structure view times per Enables dispatch display in work order structure view Routing: enable dispatch display Activate the utilization display in structure view Dispatch display: consider days Defines number of calendar days, considered in dispatch display
SQL-extensions for the structure view - BOM / routing In structure view only a few customizations are possible. With these settings the designation for Work order position, BOM and routing can be changed. see customization of WO structure view Field Meaning SQL templatefield1 SQL-fragment to fill templatefield1 SQL templatefield2 SQL-fragment to fill templatefield2 Description Data window command line to display the "description" field of a work order position, routing or BOM item
Allocation Field Meaning Allocation Defines, which allocation function will be made available Standard: allocation function introduced in beas8.8. Only available with activated reservation system. beas2009:old allocation function Only available for compatibility reasons. It is not recommended to us for new installations. This list has the following restrictions:
- no allocation of batch and serial number related items
- no support of bin locations
- no pre-allocation feature This function is doing a transfer per work order item. The transfer is linked directly to the material and displayed in the work order list. That why this function can be used without reservation. Disadvantage: Because the goods on the allocation warehouse are not reserved they can be accessed by other work orders. Buttons: quick allocation: all entries having a quantity are allocated Allocation: the "transfer manually" screen opens. This is used for batch or serial number related items. The list has two types of display: Compressed: total requirement per item Broken down: every material position is shown separately
no: no allocation
Reports Field Meaning Reservation Enable reservation function? Material requirement Defines, which material requirement list is available Standard: material requirement list introduced in beas 8.8 beas2009: „old“ material requirement list no: no reservation Multi level display for assemblies
hmtoggle_plus1 Allows a multi level display for material requirement lists Affects Reservation function, the default Material requirement list, Material issue and Allocation. If this option is enabled, and you right-click on a BOM item, selecting one of the above mentioned features, not only the material requirement of the current BOM item is considered, but also the material requirement of its sub-structure. Material requirement with purchase Available only for compatibility reasons. Material requirement list, from which a purchase order can be created. The created purchase order is not work order related.
back to work order structure
返回 主页