Navigation: Production > Work order general > WO structure: WO structure operation No contents entries on this page Contents Lower level in work order, entries in green.
Right mouse button on operation Function Meaning Operation edit The currently selected operation is edited Create Operation Insert new operation Operation delete Deletes the operation Create Time Receipt Creates an FDC time receipt Dispatches graphical view Displays the graphical overview on utilization Dispatches Shows all planned time reservations for this resource, which are deposited behind the operation Search for structure see above
Click an entry to edit.
If a tool is assigned to the operation, it is displayed below
Icon meaning ferttool Tool menu_opportunuties Reference: receipt from production is linked to a sales order or to a WO item tool7 Tool with enabled switch determines lead time
Right click on tool Function Meaning Edit operation position Edit currently selected operation Modify tool Open tool master data Activate tool hmtoggle_plus1 The tool is activated for this operation Activate or de-activate the tool. All rules are considered as:
- determines lead time
- only one tool active See Tool management
Note: If there are several tool entries which affect lead time, only one tool can be activated. In case of activation, all time values stored in the tool, are transferred to routing position. Empty values in operation are not changed.
Tool entries, in which"determines lead time" was not enabled, can be activated in parallel.
User events With the following Userevents you can manipulate the bahavior: windowevent pretoolactivate before activation/De-activation. The process is canceled with "return failure". In variable "e_activ" you store, whether the toll will be activated (=1) or de-activated (=0).
hmtoggle_plus1 Example: Only user "manager" is allowed to change: windowevent pretoolactivate if <> manager then return failure end if end event
windowevent posttoolactivate is called after the process (beas9.0-000-003-036)
The structure view is dynamic, depending on the function ( BOM, material postings, QC-order) different information is displayed. But the column header remains the same. Operations are displayed in green. Overview on operation types
The following information is displayed in the line of an operation Column Description Sales order Icon Operation type right to it position number, resource ID Name Activity description From Start of processing time (without idle time, transfer) To End of processing time Colors: Date grey: operation already closed or outside the period Date red: operation in the past (too late) WO will not be finished on time Plan Planned time Actual Scheduled plan time Drawing number Show dispatches of the related resource Type/Scrap reported yield and scrap quantity for this position For external operations the sum of all goods receipts is displayed Match code Pool info: active or inactive. "optional" for operations, which do not need to be reported.
Below the operation, several changes can be displayed.
Icon Meaning operation_parallel parallel operation fertalternativ alternative resource
alternative operation sequence with alternative resource
Right click above in the window (below the title line) opens the window settings for the structure view. See Configuration of WO structure view