Production Work order general WO structure WO structure material postings - robinfeng/beashelp GitHub Wiki

生产工单结构物料过账



Navigation: Production > Work order general > WO structure: WO structure Material postings No contents entries on this page Contents On material level information on batches and serial numbers, the material requirement, postings and reservations is displayed. Double click on the posting line opens the posting document (user needs authorization "MW Journal")

Status icons for material Icon Meaning item_batchnumber Batch (incoming, or outgoing) item_serialnumber Serial number resource1 reservation_100 reservation_120 Reservation: Grey: goods reserved, but planned quantity not reached Green: required planned quantity reserved Red overflown: too much reserved

Below the material posting the journal entry is displayed

Postings Icon Meaning item_receipt An assembly has been posted already. If this is a batch or serial number related assembly batch or serial number related material can be linked to it. see Batch tracing, Serial number tracing, Linking batches / serial numbers item_issue Material has been charged off already. journal_header All journal entries for this work order (user needs authorization (Journal entries) See Journal journal_line %PROGRAMNAME%> Journal. Entry displayed below the barreljournal_header. See Journal journal_sap SAP-account movement (Journal) displayed below the barrel journal_header => journal_line ◙ Right to planned quantity: a value was entered in "Issue batch remains..."

Right click on posting entry Function Meaning Cancel: xxx open the Cancellation screen

This function is displayed at material issue or at posting in assemblies. A posting document, a serial number or a batch posting can be canceled.

Notes: Correct WIP accounting works only using the cancellation feature, as well as a correct valuation of later postings.

hmtoggle_plus1 Post in assemblies Only possible with single postings. The cancellation feature is only available, clicking on the batch or serial number. Then, the issue screen is opened in a special cancellation mode.

hmtoggle_plus1 Charge-off material For material postings, the complete document can be issued at once. A special cancellation screen is opened. See Cancellation screen

Batch tracing For batch items: open batch tracing

Depending on window settings in structure view, a simple variant of that feature is available. That means, posting entries are displayed right below the batch. For restrictions see: integrated batch tracing Provision For provision parts: open linked provisions External production goods receipt Open goods receipt for external production items

Right click above in the window (below the title line) opens the window settings for the structure view. See Configuration of WO structure view


返回 主页