Icon Meaning tool-folder-ungedruckt Production document not yet printed tool-folder Production document - printed tool-baugruppe Assembly. Click on the small + to expand BOM and routing. Click on the sign left to the + to display the associated sub-assemblies.. famarked Position has been selected. All selected positions can be printed at once, different parameters (eg. material requirement ) can be evalued.

Item master data set (assembly, purchase part) blocked item_assembly_red One of the following settings is disabled in item master : capacity/material planning, login to work order, material posting.

Right click opens the following menu:

Right click on Assembly 1. Basic functions Function Meaning Assembly edit Edit the assembly Alternative Item Opens selection of alternative items for this position ( if deposited) Print opens the print menu (macro) New Assembly Add an assembly to this work order. When saving all order related sub-assemblies ( marked with green clip) are also included. Stock related sub-assemblies are only inserted as BOM items. Copy Assembly The assembly is marked as "to be copied" and can then be inserted below another assembly or into another work order. Insert Assembly xx The assembly selected before to be copied is inserted below this assembly.

A BOM position is created inside this assembly and the copied assembly is inserted at this position.

The new BOM position receives the quantity of the original assembly. The inserted assembly receives the BOM quantity multiplied with the quantity of the superordinate.

Note: The entire assembly structure including BOM, routings and tools is copied.

Alternatively, the assembly can also be inserted directly in the work order. See WO Structure Work order New Bill of Mat. Position Create new bill of materials position for the selected production position Create Operation Create new position for the production position [Assembly] receipt Assembly is posted in see Manual entries [Assembly] issue Assembly is charged off Material requirement for structure If an assembly has a large number of sub-assemblies, then the material requirements for the selected assembly and all dependent sub-assemblies can be determined with this feature. Allocation structure for pos Opens the list of allocations for this position Material requirement for assembly Opens the material requirement report Invent. History Open the Inventory history Expand all see above Search for structure see above

Right click on Assembly 2. Extended functions Function Meaning Update Assembly Quantity If the work order is revised manually and the quantities are changed for BOM entries, for example, then the quantity specifications of the sub-assemblies that depend on the BOM positions are not automatically updated, since an automatic update is not required in this case. This function is used to adjust the quantities of the sub-assemblies to the BOM quantities. Split assembly The assembly is split into two assemblies. Only the current level is split, substructures are not split.

hmtoggle_plus1 Example of use Due to partial manufacture scrap, the remaining parts have to be manufactured separately. A new assembly is created for these. The quantity of the new assembly is entered into the consumption unit. This must be smaller than the quantity of assemblies to be split. The scrap quantity is not counted towards this. The entered quantity is subtracted from the assembly that is to be split. Closed maintenance sequences and BOM items are also closed in the copied assembly. Values that are already entered remain in the assembly that is to be split. The scrap quantity in new assemblies is always set to 0 and remains unchanged in the assembly that is to be split. Production lots are not observed. Existing material reservations are deleted. Existing serial number reservations are split. A selection screen opens, the last entries are pre-selected. Clear WIP account The account for Work in Progress is cleared

Click in structure view on an assembly line, opens the screen work order item Right click above in the window (below the title line) opens the window settings for the structure view. See Configuration of WO structure view