Production Work order general WO structure WO structure BOM - robinfeng/beashelp GitHub Wiki
生产工单结构BOM
Navigation: Production > Work order general > WO structure: Bill of Materials No contents entries on this page Contents In work order structure the lowest level - material entries in blue.
Bill of materials and operation sequences
Icon Meaning item_bom BOM position See Production - BOM item tool-box-abg BOM position - confirmed - manually or by confirmation with full backflushing quantity item_bomA BOM position with posting ID "automatic" : posted automatically (backflushed) item_bom10 BOM position is assigned to a operation sequence. The number refers to the operation sequence. In combination with the posting ID A: the material is posted automatically, at the moment a time receipt is created for this operation.
A violet dot indicates, that this BOM position was created from a phantom assembly. (in master data - tree view the dot means, the BOM position is a phantom item ( of typ phantom assembly) item_goods negative BOM position See negative BOM position menu_opportunuties Link: production receipt is linked to a customer order or to a work order position ferttool Tool See Tools tool7 Tool with activated switch "determines lead time" operation_parallel Parallel operation (in structure view marked with parallel lines additionally) See Production routing: Parallel Resource fertalternativ alternative resource See Production routing: Alternative Resource clip0001 alternative operation sequence with alternative resource mlagerverwaltung Allocation in right click menu. Allocated goods are displayed in the structure with reservation_plan icon
resource1
reservation_100
reservation_120 hmtoggle_plus1 Reservations existing In BOM item row the reservation icon is displayed: Grey barrel: goods reserved, but planned quantity not yet reached
Green barrel: required quantity reserved
Red barrel overflown: too much reserved
If reservation entries exist, the BOM item can be expanded. Below, the single positions are displayed, with warehouse, bin location, batch, reservation number and quantity. See Reservatiojn system
Right mouse button on bill of materials position Function Meaning BOM Item edit The selected position is edited See Production - BOM item New BOM item Inserts a new bill of materials position BOM Item delete Deletes the selected bill of materials position. If impossible due to existing time receipts or postings, the program offers to close the position. Items for which this is possible, are deleted, the others are closed. Open time receipts are deleted as well (only logged on but not finished) New Operation Inserts new operation Item edit Edit the selected item (master data) Material issue Charges off the material of the current BOM position, see manual entries Material receipt Posts in the material of the current bill of materials position Reservation Open the Reservation screen for this position Material requirement Open the Material requirement list Allocation open the Allocation screen for this item Invent. history Opens Inventory history Search for structure see above
Double click a line to open the screen to edit the BOM item. Changes in BOM for this work order do not affect the master data. Right click above in the window (below the title line) opens the window settings for the structure view. See Configuration of WO structure view
back to work order item
返回 主页