Production Work order general WO structure Issue Reservations screen Issuing provision parts edit - robinfeng/beashelp GitHub Wiki

供应部件发料修改


Navigation: Production > Work order general > WO structure > Issue / Reservations screen: issue provision parts - Edit No contents entries on this page Contents In this screen, the material assigned in work order is issued from external manufacturing warehouse.

Screen structure Header Functions in header Requirement list

Inventory list

selected material

hmtoggle_plus1 Scanner support The active field is always the entry field in the lowest line. This can be used for registration via scanner. There are two settings: Production - Material posting - Backflushing - Material posting with scanner

Active: A matching batch or serial number is searched. If an entry is found, it will be used and the required quantity is accepted. If no entry is found, an error message is issued: no entry found. If the entry is blocked, (batch status, blocked bin location) the entry is not accepted, a message is issued.

Inactive: beas searches for the following entries: Batch number: field is selected, the cursor is set to quantity field Serial number: quantity is accepted immediately Item: entry selected, cursor is set to quantity field

If no matching entry was found and the entry is numeric, the current entry is accepted including the quantity. Error messages are issued in no case.

See Configuration wizard - Material posting with scanner Reservation Material issue Allocation External operation Allocation External operation issue

beas9.0-000-003-006, beas9.0-000-002-024, fert_scanbatchqty (J)

Buttons Functions Meaning All pre-allocate Under consideration of withdrawal rules and reservations the quantity to be charged off is proposed. Material is withdrawn only from the external warehouse selected in the purchase order. Extended rules Extended rules can be stored in the function workordermanagement.setres_supply() For further information see Extended rules Pre-allocation delete All selected entries are deleted. Booking issue material for all selected positions. After booking, only remaining items yet to be posted are displayed. The screen is not closed. Operation sequence part receipt Part receipt for the external operation. Next operation is released in pool. If this is the last operation,the assembly is posted in. Operation sequence confirm completion Complete time receipt for the external operation. Next operation is released in pool. If this is the last operation,the assembly is posted in. The operation is closed.

Field Meaning Document Document Date Document date Supplier Supplier of the external operation Delivered qty Delivered quantity Scrap Scrap quantity Assembly Assembly Activity Operation Item Item Supplied Already ordered Requirement Requirement Issued Already issued Stock Current stock issue Entry field: quantity to issue now UoM Unit of measurement

back to external operation


返回 主页