Production Resources Resource group Resources group administration Edit resource group - robinfeng/beashelp GitHub Wiki
编辑资源组
Navigation: Production > Resources > Resource Groups > Resources group administration: Edit resource group No contents entries on this page Contents Field Description Group Group ID Description Description of the group Directly schedulable if enabled, each resource of this group can be scheduled separately. You can assign an ID to the scheduling. This setting allows a planning to the minute, but there are some risks. More details: Training unit Resource groups
Tab:
Resources: All resources of that group are displayed with corresponding cost rates. Field Description Resource Number of the resource Description Description of the resource Service/cost Enable, to consider the respective resource in scheduling Full cost rate Full cost rate deposited in master data of the resource Marginal cost rate Marginal cost rate deposited in master data of the resource Planned capacity According to factory calendar (hours per day) Ma | Empl. Number of machines/ | employee Group Group ID
Scheduling: the factory calendar with registered capacities of the resource group is opened.
Graphic: For each resource of the group the utilization is displayed.
Back to resource group administration
返回 主页