Navigation: Production > Resources > Edit resource > Costs tab > Resource costs: concept of time types No contents entries on this page Contents In this chapter the concept of time types is described.

Up to 4 time types can be set up in the Configuration wizard. In the flowing example of use, the following time types are set up:

β€’ Machine β€’ Personnel processing costs β€’ Personnel setup costs β€’ Quality control

resourcet1

Important: Type "R" refers to the setup time. "A" refers to the main order time for which the number of pieces is then also reported.

All time types can now be activated in the resource (extend cost types to = 4) resourcet2

It is now possible to store a separate cost rate and cost element for each time type.

If this type of work sequence is logged in, the following login functions are available to the user: resourcet3

A person cannot report the person time and machine time for a work sequence simultaneously. Machines must therefore be reported using a different personnel number.

Approach: The machine is registered as personnel; a single personnel entry can also represent all machines resourcet4

In the personnel master of the employees, everything is then activated except the time type "Machine". resourcet5

If a login is now performed using the card number of the machine, the following selection is available, in addition to selection using the card number of a person. resourcet6 resourcet7

This method permits very accurate recording of all time types, including in work order and machine grouping - from precalculation to FDC through to costing analysis. However, as the machine must be logged in and out separately, the cost incurred for process time collection is high.

See Resource costs Time types Configuration wizard - time types Configuration wizard - Resources