Production Resources - robinfeng/beashelp GitHub Wiki
资源
See all available resources and the current status. Use the buttons below to manage the resources.
| 字段 | 说明 |
|---|---|
| Group | Name of the resource group |
| Description | Free text |
| Shift | Assigned shift from Shift schedule for resources |
| Name | Employee |
| From | Logged on since |
| Interruption | Type of interruption |
| Utilization | Display planned capacity grey ( according to resource scheduling ) currently dispatched capacity in green. The covered time period in utilization column is set up in: Configuration wizard – Production – Display – Structure view – Dispatching index: number of day to be considered |
| 按钮 | 说明 |
|---|---|
| Edit | Open master data of the selected resource Edit resource |
| End | Close window |
| New resource | Add a new resource |
| Edit group | Open th screen "Edit resource group" |
| New group | Add a new resource group |
| Re-calculate | Recalculate the utilization |
| Dispatches | Open the dispatches screen |
| Graphic utilization display | Open graphic utilization display for the currently selected resource |
See: Resources (Concept) Dispatches Resource shift schedule Edit resource Graphic utilization display
返回 上层