Production Post calculation (final costing) - robinfeng/beashelp GitHub Wiki
后期计算
Using this function a post-calculation can be created including several work orders. Valuation method, period and much more can be set up.
Post-calculation - List Post-calculation - Master data Post-calculation - Results Post-calculation - Details on calculation Results profit centers Results detail
The list is adjustable, window settings and templates are supported.
Use button "results" to view the results of the above selected calculation.
Field description See Post-calculation - Master data
Authorization: For calculation / view the authorization Batch-post-calculation is required.
See Post-calculation - Concept
返回 上层