Production Milestones - robinfeng/beashelp GitHub Wiki
里程碑
Navigation: Production: Milestones No contents entries on this page Contents In the operation, routing, production scheduling and in the calculation, milestones can now be added. These are predefined in Production - Basic data – Milestones. In Operation type the hooklet "Milestone" is required. In the production routing, a date for the milestones can also be entered.
2 tabs are available: Tab Meaning Master data Input of a milestone Milestones List of milestones stored in the routing positions This list can be used for an analysis, exported to Excel, and filtered and sorted as necessary. This can be set up using the window settings.
Field description of the Milestones tab Field Meaning Milestones Milestone flag Description Milestone description Document Document Position Assembly position WO Stat. Position Resource Resource ID Activity Activity description Milestone date Specified milestone date in the routing sequence (in the work order) Plan date Planned start date of the routing position Last Message Last time receipt for this routing position Closed Routing position closed? Work Order Work order - order number Customer Name Customer Name Additional Text Additional text in work order Item Item number of the assembly to be produced Item Description Item description of the assembly to be produced Drawing Number Drawing number of the assembly to be produced DIN DIN Raw Material Raw Material Match Code Match Code Material Group Material Group Date of Print Print date of the work order Date closed Date the production position was closed Project Project ID
see event control
返回 主页