Production Factory data capture Production time administration Production time administration - robinfeng/beashelp GitHub Wiki

生产工时管理


Navigation: Production > Factory Data Capture > Production Time Administration: Production Time Administration No contents entries on this page Contents Existing time receipts can be deleted, edited, or re-registered. By default, display by day. Switch between days using the buttons "back" and "forward". If a filter is changed via buttons "Search" the day view is deactivated and all results are shown depending on the selected filter.

Window settings and Templates are supported.

Field Meaning Type Picture Color coding time type: grey default. Other colors deposited in time type Type Name Name of time type Document Production document Position Production position of the selected document Op.sequ. Operation to be confirmed Closed Hooklet, if closed Start Reported start time End Reported end time Time from to Duration calculated automatically - depending on the settings in Configuration wizard - Production - FDC - time linking Duration Duration, can be changed after being calculated Personnel Employee number First name First name Surname Surname Yield quantity Produced quantity, free from defects in assembly units (see units) Scrap quantity Scrap quantity in reporting units Yield quantity (RE) Produced quantity, free from defects in reporting units Scrap quantity (RE) Scrap quantity in reporting units Resource description Resource, on which the work was done Resource location Where is the resource located Resource Type Type of resource Factor Conversion factor of reporting unit Unit Quantity unit of the item Time factor Time distribution key for parallel time receipt External costs Description of external costs Canceled Hooklet, if canceled Reason Reason of cancellation Activity Description of activity Cost center cost center to be charged (Business performance) Batch Batch (temporary batch for reported quantity) Order Order number Document date Date of document Customer Customer ID Name Customer name Item Item of work order Project Project info Time protocol Detailed protocol, of how the duration was computed (beas9.0-004-068-000)

back to production times administration

Detailed Information on some fields and impact see report production times

Button Meaning Search Search for entry Edit Edit selected entry End Close screen New Register new order time Delete For more information see time receipt - delete Backward Scroll backward Forward Scroll forward