Navigation: Production > Capacity Planning > APS > Graphic View: Gantt Display No contents entries on this page Contents A production order is displayed in the graphical view from left to right.
The production order receives a totals bar (first gray bar at the top edge). The individual assemblies in turn have their own bar (bar below this).
The individual work sequences are linked together by an arrow and represent the processing sequence in the time chart. Lastly, the delivery date is indicated by a red dot.
darstellung1 Example: Throughput of a production order
Structure of a work sequence
The timeline of a work sequence is subdivided into three parts:
- Transfer time, which is stored in days in the resource
- The job time, based on set-up time and job time x number of units as per work sequence
- The idle time as per work sequence.
darstellung3
In the graphical view, there are other symbols or color displays that indicate e.g. the status of the production order.
darstellung_fag External operation (orange background) darstellung_ag Normal operation consisting of transfer time, setup + processing time (green range) and idle time darstellung_angemeldet Work sequence currently logged in darstellung_teilgemeldet There has already been a partial login to this work sequence darstellung_gedruckt Normal work sequence, position has already been printed darstellung_parallel Parallel resource darstellung_werkzeug Resource of type Tool lock Production order is marked as "Planned" darstellung_liefertermin Delivery date darstellung_liefertermin2 Delivery date cannot be met darstellung_fixiert Work sequence is fixed to a deadline. This is considered in forward scheduling. darstellung_markiert Marked work sequence. In the event of rescheduling, all production orders in which a work sequence is marked are recalculated. darstellung_ueberschneidung Overlapping: The following work sequence was fixed and its start is BEFORE THE END of the previous work sequence. In this case, red shading is applied.