Navigation: Production > Work order general > Work order document > WO document items: Field description extended No contents entries on this page Contents Possible additional columns in production document.

Field Description Document No Production document number (internal, unique, not changeable) Pos Production position number Structure-Pos Structure position number. Sorting by this number, the work order is displayed in the correct structured order To Pos For sub-assemblies there is shown to which main assembly they belong To BOM Pos Reference to BOM item of the main assembly Order quantity Quantity according to customer order in warehouse units Quantity consumption Production quantity in consumption units Quantity storage Production quantity in warehouse units Unit warehouse Warehouse unit Conversion Conversion from consumption unit to warehouse unit Finished Quantity reported as completed in consumption units Manually finished Quantity reported manually as completed. see assembly tab - master data tab - column "ready") Quantity finished Completed quantity in warehouse units. Sum of postings of this assembly, less cancellations, plus the value from "manually finished" Deliv. Date Delivery date of the item = delivery date of customer order less the entered number of work days Closed Position closed? Start time Calculated start time of item End time Calculated end time of item Actual time Previously reported actual time printed Printed production document Additional text Free text Barcode Barcode printed on the routing card. Structure yyyyyyxxx where y is the document number and x the item number Sales price Can be entered manually - required for planned - actual post calculation Last post-calculation When was the last post-calculation performed for this work order and a price determined? Mat marg cost plan Material overhead costs at marginal costs and full costs as per default Mat marg cost act Actual marginal and full costs according to postings LMC marg cost plan Labor+machine costs marginal or full LMC marg cost act Actual marginal and full costs according to time receipts from FDC COGS marg full plan Calculated costs of goods sold as per default COGS marg full act Actual costs of goods sold Time plan Calculated planned minutes Time act Calculated actual minutes

back to document position


返回 主页

⚠️ **GitHub.com Fallback** ⚠️