Production > Work order general > Work order document > WO document items > Edit work order item > Routing tab > Production routing > Tool_opsequ - robinfeng/beashelp GitHub Wiki
Navigation: Production > Work order general > Work order document > WO document items > Edit Work Order Item > Routing tab > Production Routing:
Tools
No contents entries on this page
Contents
Work order item
Edit work order item
Operation MS-Project
Routing
Edit routing
External operation
General
Costs
Scheduling
Extended
Tool
Utilities
Parallel
Alternative
Attachments
The tools required for the operation.
Field Meaning Position Consecutive number, but not a primary key. The list output is sorted by this number. Tool Tool key (selection from master data / tools) Active Checked, if entry is active Description Designation of the tool (cannot be changed) Determines lead time If checked, entry determines lead time. Setup time setup time Machine / operation time per unit Job time
master data settings for tools: edit tools
back to external operation op.sequ.
返回 主页