Production > Work order general > Work order document > WO document items > Edit work order item > Routing tab > Production routing > External operation_opsequ - robinfeng/beashelp GitHub Wiki

委外工序


Navigation: Production > Work order general > Work order document > WO document items > Edit Work Order Item > Routing tab > Production Routing: External operation (operation sequence) No contents entries on this page Contents Work order item Edit work order item
Operation MS-Project Routing Edit routing External operation General Costs Scheduling Extended Tool Utilities Parallel Alternative Attachments

The "External Operation" tab is only visible if an external operation has been selected as a resource. An external operation can consist of a pure service (the entry is then on this page only) and / or possess a proprietary lead time and can load capacity to a resource, as well as allow costs to arise (entry in General tab)

For more information, see routing - external operation (master data)

Field Meaning Supplier Default supplier see Routing - external operation Item The service item is specified here. This is a non-inventory-managed item, as it is a pure service. If no unit price is specified, pricing is carried out for this item. Unit price Service price per price factor. see external operation - unit price Price factor Unit price is stored per the value entered here Minimum price The minimum price is specified here. If the total unit price is below the minimum price, the value specified here is used. Transport price The transport price price per transport lot size. Transport lot size The quantity specified here can be sent per transport. See transport price Currency Specifies the currency in which the amounts are expressed. If no currency is used, the home currency is used.

back to Production operation sequence