Production > Resources - robinfeng/beashelp GitHub Wiki
See all available resources and the current status. Use the buttons below to manage the resources.
字段 | 说明 |
---|---|
Group | Name of the resource group |
Description | Free text |
Shift | Assigned shift from Shift schedule for resources |
Name | Employee |
From | Logged on since |
Interruption | Type of interruption |
Utilization | Display planned capacity grey ( according to resource scheduling ) currently dispatched capacity in green. The covered time period in utilization column is set up in: Configuration wizard – Production – Display – Structure view – Dispatching index: number of day to be considered |
按钮 | 说明 |
---|---|
Edit | Open master data of the selected resource Edit resource |
End | Close window |
New resource | Add a new resource |
Edit group | Open th screen "Edit resource group" |
New group | Add a new resource group |
Re-calculate | Recalculate the utilization |
Dispatches | Open the dispatches screen |
Graphic utilization display | Open graphic utilization display for the currently selected resource |
See: Resources (Concept) Dispatches Resource shift schedule Edit resource Graphic utilization display
返回 上层