Production > Post calculation (final costing) - robinfeng/beashelp GitHub Wiki

后期计算



Using this function a post-calculation can be created including several work orders. Valuation method, period and much more can be set up.

Post-calculation - List Post-calculation - Master data Post-calculation - Results Post-calculation - Details on calculation Results profit centers Results detail

The list is adjustable, window settings and templates are supported.

Use button "results" to view the results of the above selected calculation.

Field description See Post-calculation - Master data

Authorization: For calculation / view the authorization Batch-post-calculation is required.

See Post-calculation - Concept


返回 上层

⚠️ **GitHub.com Fallback** ⚠️