Production > Capacity planning > APS > Graphic view > Alternative operations - robinfeng/beashelp GitHub Wiki
Navigation: Production > Capacity Planning > APS > Graphic View: Alternative Operations No contents entries on this page Contents Alternative operations can be defined in the routing.
In this case, for position 10, resource 5113, an alternative position was created for external processing - resource 1800. This alternative position has its own throughput time.
planung_alternativ1
In this structure view, you can right-click to activate the alternative operation. The same is also possible in APS. If you click on this routing position, the alternative operation is displayed in the menu. A utilization display appears simultaneously: Dispatches at planned capacity for the next 8 days (configurable).
planung_alternativ2
To switch to this alternative, click on the bitmap to the right of this. The resource is swapped and the previous operation is added as a possible alternative. The utilization is displayed immediately, and the position selected, making it possible to initiate a re—calculation immediately. planung_alternativ3
help-hinweisWhat is the difference from alternative resources? Alternative external operations are operation-related, i.e. you can define precisely which alternative resources may be used (e.g. based on the item to be produced). In addition, a different throughput time can be specified for an alternative operation, which is important, e.g. if the alternative resource is not working very productively and so requires a longer throughput time.