Inventory > Item master > Calculation > Calculation view - robinfeng/beashelp GitHub Wiki
Navigation: Inventory > Item master > Calculation: Calculation view No contents entries on this page Contents In item master a calculation can be called up. This is only a view, the calculation cannot be changed. Use the orange arrow to open the calculation. Before the calculation starts a screen is opened, to set up parameters.
Field Description Calculation schema Which calculation schema to use for this item Lot size calculation Predefined lot site in warehouse units Material valuation Value material at which costs Default according to option in Configuration wizard - Pre-calculation Setting has no effect on External operation - Valuation of services Single step If active, only the upper level of the BOM is brokwn down. Sub-assemblies are valued according to the selected method. If this option is not selected, the complete BOM structure will be broken down. Display per Set up display. See Calculation - view and lot size Warehouse hmtoggle_plus1 Determines, for which warehouse to perform the calculation Field is only visible, if in SAP Business Onebasis initialization "Price per warehouse" was set up.
See Pre-calculation - Material - purchase price I-Version hmtoggle_plus1 Which item version costing should be created This fields is visible only, if Item version control was activated. Then, this field is used to determine the BOM and routing to be used.
See Item master - I-Version Item version control Variant If using variants, select one here (A-Z) Product configuration Select a product configuration if existing BOM hmtoggle_plus1 BOM to be used for breakdown Here, the BOM is proposed, to be used for breakdown of the assembly. It is stored in the item or item version. This fields is visible only, if Item version control was activated. Routing hmtoggle_plus1 Routing to be used for breakdown Here, the Routing is proposed, to be used for breakdown of the assembly. It is stored in the item or item version. This fields is visible only, if Item version control was activated. This field can be edited only at new creation and with enabled option Routing directly selectable
See Pre-calculation - call up Pre-calculation Item Master - calculation tab
返回 主页