Concepts > Overhead costs - robinfeng/beashelp GitHub Wiki

费用成本


Overhead costs are referring to costs which are attributable to no productive activity such as meetings, repair, cleaning, etc.

If overhead costs are to be recorded with factory data capture (FDC) , the following approach is offered:

• Create a production order - preferably as document 1, Type: Overhead, enable overhead costs in the production order header (see production - work order) • Create a "pseudo-assembly" - any item - preferably without inventory management • Behind this assembly all overhead costs are stored as routing (repair, meeting, training, cleaning, etc.)

If there are many types of overhead costs, they can be distributed on different production positions

Now, if an employee wants to report overhead costs, he uses the overhead order. The operation sequences of a overhead order cannot be confirmed with time receipt.

The following reports are available for this:

FDC/ Reports:

Hours per project and cost center Hours per project and staff

⚠️ **GitHub.com Fallback** ⚠️