Administration System initialization Configuration wizard Quality Control Production - robinfeng/beashelp GitHub Wiki

生产


Name Description Create QC-Order automatically when A QC plan can be stored in a work sequence. Choose at which moment the QC order should be created:

Manually: Only manual creation At time receipt: Creating during the first "Time receipt" At login to work order: Creating during the first logon (not the first time receipt) Production create: At new creation of a work order (beas9.0-000-003-001)

External operations if dealing with an external operation, the option is supported At order logon: creating a purchase order At time receipt: creating goods receipt Note: for external operations, there is no link from QC order to purchase or goods receipt. Only a link to operation. That means, there is always only one QC order per operation, with any number of samples. A dependency from external operation-goods receipt cannot be created.

See Routing Production - operation sequence Quality control order (Variable fert_qsanlage, m (default) = manually, r = at time receipt, s = at order logon, c=at new creation)


返回 主页