In this section, the setup options of the configuration wizard for post-calculation are described.
See Post-calculation - Concepts
View Field Description Display times per Display times in pre-calculation in hours or minutes See: WO-post-calculation Decimals: Quantity, price, time Because in post calculation summed values are displayed, the number of decimals can be set up separately for the post-calculation. Enter decimals separately for display of quantities, prices and times. See: WO-post-calculation
Field Description Valuation to Purchasing price for material valuation See Pricing types This option is deactivated if "Material costs always at planned costs" was activated. (Variable naka_bewertung, Standard B) Value planned costs to When making a planned/actual comparison, the planned price reference (= planned costs) can be specified, i.e. this does not necessarily have to correspond to the preliminary costing price. A change makes sense, for example, to “entry price” if the evaluation of an assembly is supposed to value the current entry price, not only of the actual entered material, but also the planned material. This option has a direct effect on the assembly valuation, if this is set to costing analysis price to target value. See Pricing types (Variable matsollbewertung, Standard V=Vorkalkulation) Value assemblies If active, all receipts and issues of assemblies are fully valued. Since these are normally received and issued in the same quantity, thus behaving neutrally in terms of valuation, they do not necessarily have to be valued. (Variable naka_baugruppe_bewertung J/N, Standard N)
hmtoggle_plus1 Explanation
see Post-calculation Plan = actual, if no confirmation If active, all operations not yet having a time receipt are valued at the actual values. help-achtungUse caution in costing analyses when specifying a valuation period, since a time receipt might be outside of the period and will then be valued at actual costs. (Variable bdeohnezwangbewertung J/N, Standard=N) Material costs always to planned costs If this option is enabled, when calculating the actual costs, the planned costs are always taken as reference. The value from column "planned material costs " is taken, which was multiplied by the total planned quantity. Material, which had been posted already as well as any actual values are ignored. Pricing always to planned costs. This option makes sense only if the production costs, but not the material costs are recognized, ie if the material is not posted. hmtoggle_plus1 Example Producing amount of 10, single price of material 5 € / piece Post in: 1: Planned value as per post-calculation is 10 * 5 ie 50 € Assembly of 1 is posted in at 50 € The second assembly would be posted in at 0 € (50 planned value - less the already posted 50 = 0)
(Variable nakamatplan J/N, Standard = N) Sub-assemblies valuation hmtoggle_plus1 Determines the valuation of sub-assemblies at post-calculations Affects only single stage post-calculations and sub-assemblies (single stage) or storage related sub-assemblies (multi-stage valuation)
Standard How is the material valued (see above Valuation to) This is standard setting (S) Last Pre-calculation Uses the result of the last batch-calculation, for which "Standard price" was activated.
Material price, L+M costs, and material surcharges are taken into account separately. Other surcharges or values from calculation schema are not used. Costs of external operation, work order times and costs types are not taken into account.
Note If posting in the assembly the valuation method "Planned costs" or "Post-calculation costs" was selected, this can have effects, for example if l+m costs according to calculation schema are posted to the WIP account. In this case a double posting can arise. Then, this valuation method may not be used.
If no pre-calculation is found, the standard valuation method is used.
See Batch-calculation Batch-calculation - Standard costs Batch-calculation - single step
(beas900-000-002-005) (Variable onelevelcalc, Standard=S)
See WO Post-calculation Post-calculation