bond verification - nbonnand/ovs-toolbox GitHub Wiki
8.3 Bond verification
8.3.1 Bond configuration verification

- a Select bridge br1
- b You should now see a port "B1" with 2 subinterfaces p12a and p12b (c) attached to it.
- d Bond params you have chosen during B1 creation should be displayed.
8.3.2 network topology verification

- a Select plotnetcfg tab.
- b Enter keywords for plotnetfg elements that you want to hide
- c Press refresh
You can see that B1 from switch br1 and B2 from switch br2 are connected by 2 different paths
- d first path through veth pair p12a-p21a
- e second path through veth pair p12b-p21b