Tools and Materials needed
Workbench
5 planks + 1 BBP book
Step ladder kit
10 planks + 10 nails
Kits
3 planks + 3 nails (in the workbench UI)
Large wall
Frame = 10 nails + 5 planks
T1 wood = frame + 10 nails + 2 logs
T1 planks = frame + 10 nails + 6 planks
T2 metal = frame + T1 built + 4 sheet metal + 10 nails
T3 concrete = frame + 3 concrete bricks + 1 mortar mix (shovel)
Small wall
Frame = 10 nails + 3 planks
T1 wood = frame + 10 nails + 1 logs
T1 planks = frame + 10 nails + 3 planks
T2 metal = frame + T1 built + 2 sheet metal + 10 nails
T3 concrete = frame + 2 concrete bricks + 1 mortar mix (shovel)
Large half-wall
Frame = 10 nails + 3 planks
T1 wood = frame + 10 nails + 1 logs
T1 planks = frame + 10 nails + 3 planks
T2 metal = frame + T1 built + 2 sheet metal + 10 nails
T3 concrete = frame + 2 concrete bricks + 1 mortar mix (shovel)
Small half-wall
Frame = 5 nails + 2 planks
T1 wood = frame + 5 nails + 1 logs
T1 planks = frame + 10 nails + 2 planks
T2 metal = frame + T1 built + 1 sheet metal + 5 nails
T3 concrete = frame + 1 concrete bricks (shovel)
Large door
Frame = 10 nails + 5 planks
T1 wood = frame + 10 nails + 2 logs
T1 planks = frame + 10 nails + 5 planks
T2 metal = frame + T1 built + 3 sheet metal + 10 nails
T3 concrete = frame + 3 concrete bricks + 1 mortar mix (shovel)
T1 door = frame + 10 nails + 5 planks
T2 door = frame + T1 door built + 15 nails + 5 sheet metal
T3 door = frame + 15 nails + 5 sheet metal + 5 planks (can not be built if you have a T1 or T2 door built)
Small door
Frame = 10 nails + 3 planks
T1 wood = frame + 10 nails + 1 logs
T1 planks = frame + 10 nails + 3 planks
T2 metal = frame + T1 built + 2 sheet metal + 10 nails
T3 concrete = frame + 1 concrete bricks + 1 mortar mix (shovel)
T1 door = frame + 10 nails + 5 planks
T2 door = frame + T1 door built + 15 nails + 5 sheet metal
T3 door = frame + 15 nails + 5 sheet metal + 5 planks (can not be built if you have a T1 or T2 door built)
Large slope wall (R/L)
Frame = 10 nails + 5 planks
T1 wood = frame + 10 nails + 2 logs
T1 planks = frame + 10 nails + 5 planks
T2 metal = frame + T1 built + 3 sheet metal + 10 nails
T3 concrete = frame + 2 concrete bricks + 1 mortar mix (shovel)
Large floor/roof
Frame = 10 nails + 5 planks
T1 wood = frame + 10 nails + 8 planks
T2 metal = frame + T1 built + 3 sheet metal + 10 nails
T3 concrete = frame + 2 concrete bricks + 1 mortar mix (shovel)
Small floor/roof
Frame = 5 nails + 3 planks
T1 wood = frame + 5 nails + 3 planks
T2 metal = frame + T1 built + 1 sheet metal + 5 nails
T3 concrete = frame + 1 concrete bricks (shovel)
Large hanger roof (R/L)
Frame = 10 nails + 5 planks
T1 wood = frame + 24 nails + 16 planks
T2 metal = frame + T1 built + 4 sheet metal + 20 nails
T3 concrete = frame + 3 concrete bricks + 1 mortar mix (shovel)
Large slope roof
Frame = 10 nails + 5 planks
T1 wood = frame + 10 nails + 8 planks
T2 metal = frame + T1 built + 3 sheet metal + 10 nails
T3 concrete = frame + 2 concrete bricks + 1 mortar mix (shovel)
Large triangle floor/roof
Frame = 10 nails + 3 planks
T1 wood = frame + 10 nails + 5 planks
T2 metal = frame + T1 built + 2 sheet metal + 10 nails
T3 concrete = frame + 1 concrete bricks + 1 mortar mix (shovel)
Large floor/roof hatch
Frame = 10 nails + 5 planks
T1 wood = frame + 10 nails + 6 planks
T2 metal = frame + T1 built + 3 sheet metal + 10 nails
T3 concrete = frame + 2 concrete bricks + 1 mortar mix (shovel)
Stair = 5 planks + 10 nails
T1 hatch = frame + 10 nails + 5 planks
T2 hatch = frame + T1 hatch + 10 nails + 4 sheet metal
T3 reinforced hatch = frame + 5 planks+ 4 sheet metal + 20 nails
Foundation/triangle foundation
Frame = 10 nails + 2 logs
T1 wood floor = frame + 10 nails + 8 planks
T2 metal floor = frame + T1 built + 3 sheet metal + 10 nails
T3 concrete = frame + 2 concrete bricks + 1 mortar mix (shovel)
Large gate (R/L)
Frame = 10 nails + 4 planks
T1 wood = frame + 24 nails + 16 planks
T2 metal = frame + T1 built + 4 sheet metal + 20 nails
T3 concrete = frame + 3 concrete bricks + 1 mortar mix (shovel)
Double garage door
Frame = 10 nails + 4 planks
T1 wood door (x2) = frame + 12 nails + 8 planks
T2 metal door (x2) = frame + T1 door + 10 nails + 2 sheet metal
T3 concrete (x2) = frame + 1 concrete bricks + 1 mortar mix (shovel)
Single garage door
Frame = 10 nails + 4 planks
T1 wood = frame + 24 nails + 16 planks
T2 metal = frame + T1 built + 4 sheet metal + 20 nails
T3 concrete = frame + 3 concrete bricks + 1 mortar mix (shovel)
Large window
Frame = 10 nails + 5 planks
T1 log = frame + 10 nails + 2 logs
T1 plank = frame + 10 nails + 8 planks
T2 metal = frame + T1 built + 4 sheet metal + 10 nails
T3 concrete = frame + 3 concrete bricks + 1 mortar mix (shovel)
T1 hatch = frame + 5 nails + 2 planks
T2 hatch = frame + T1 hatch + 5 nails + 2 sheet metal
T3 reinforced hatch = frame + 5 planks + 3 sheet metal + 10 nails
Small window
Frame = 10 nails + 3 planks
T1 log = frame + 10 nails + 1 logs
T1 planks = frame + 10 nails + 3 planks
T2 metal = frame + T1 built + 2 sheet metal + 10 nails
T3 concrete = frame + 1 concrete bricks + 1 mortar mix (shovel)
T1 hatch = frame + 5 nails + 2 planks
T2 hatch = frame + T1 hatch + 5 nails + 2 sheet metal
T3 reinforced hatch = frame + 5 planks + 2 sheet metal + 5 nails
Barbwire barrier
T1 frame = 10 nails + 2 logs
Barbwire = 10 nails + 1 barbwire
Chain link fence
Frame = 10 nails + 2 sheet metal
T2 fence = 10 nails + 2 sheet metal
Barbwire = 10 nails + 1 barbwire
Chain link gate
Frame = 10 nails + 2 sheet metal
T2 gate (x2) = 10 nails + 1 sheet metal
Barbwire = 10 nails + 1 barbwire
Metal floor mesh
Frame = 10 nails + 1 sheet metal
T2 floor = 10 nails + 2 sheet metal
Metal stairs
Metal stair = 10 nails + 1 sheet metal
Railing (x2) = 3 nails + 1 sheet metal
Tall pillar
Wood = 5 nails + 2 planks
Concrete = 1 concrete bricks
Short pillar
Wood = 5 nails + 1 planks
Concrete = 1 concrete bricks
Large stair
Wood = 10 nails + 5 planks
Small stair
Wood = 5 nails + 5 planks
Large ramp
Wood = 15 nails + 8 planks