Design Specification ‐ MBR (Recipe and Process Instruction) - lucasgsantos/BIM GitHub Wiki
Manufacturing Execution System (MES) Design Specification
Focused on MBR, Recipe Design, Process Instructions, and Electronic Batch Record Execution
1. Introduction
This document outlines the design specification for a Manufacturing Execution System (MES). The focus areas include:
- Master Batch Record (MBR) Design
- Recipe & Workflow Design
- Process Instructions & Operator Guidance
- Execution of Electronic Batch Records (EBR)
2. Master Batch Record (MBR) Design
2.1. Objectives
- Define the digital framework for batch production records.
- Ensure compliance with FDA 21 CFR Part 11, EU Annex 11, and GAMP 5.
- Enable version control, audit trails, and electronic signatures.
2.2. Key Features
- Hierarchical MBR Structure:
- Header (Batch ID, Product, Version, Expiry)
- Materials (Bill of Materials - BOM)
- Equipment & Resources
- Process Steps (Phases, Operations, Sub-Operations)
- Quality Checks & In-Process Controls (IPC)
- Dynamic Adjustments:
- Conditional branching based on process parameters (e.g., if pH > X, then adjust).
- Scalable for different batch sizes.
- Compliance & Traceability:
- Full audit trail of changes.
- Electronic signatures (ESign) for approvals.
2.3. Data Model
Field | Type | Description |
---|---|---|
MBR_ID | GUID | Unique identifier |
Version | String | Semantic versioning (v1.0.0) |
Status | Enum (Draft, Approved, Retired) | Lifecycle state |
Effective Date | DateTime | When MBR becomes active |
BOM_Link | Foreign Key | Linked Bill of Materials |
3. Recipe & Workflow Design
3.1. Recipe Types
- Standard Recipe: Fixed steps for a product.
- Flexible Recipe: Adjustable parameters (e.g., mixing time, temperature).
- Parameterized Recipe: Uses formulas (e.g., scaling based on batch size).
3.2. Recipe Structure
- Header: Product, Version, Validity Period.
- Phases:
- Pre-Weighing → Dispensing → Mixing → Filling → Packaging
- Parameters:
- Critical Process Parameters (CPPs)
- Acceptable Ranges (Min/Max)
- Default Values
3.3. Workflow Engine
- State Machine: Defines transitions (e.g.,
Pending → In Progress → Completed
). - Dependencies: Equipment availability, material readiness.
- Exception Handling: Deviations trigger alerts or alternate paths.
4. Process Instructions & Operator Guidance
4.1. Instruction Types
- Text-Based: SOPs, warnings.
- Multimedia: Images, videos, PDFs.
- Interactive:
- Scan barcode to confirm material.
- Enter manual readings (e.g., pH, temperature).
4.2. Execution Rules
- Mandatory vs. Optional Steps: Some steps require sign-off before proceeding.
- Conditional Instructions:
- If
Temperature > 30°C
, show cooling instructions.
- If
- Real-Time Feedback:
- Equipment integration (e.g., SCADA, PLC) auto-captures data.
4.3. UI/UX Considerations
- Operator HMI: Touchscreen-friendly, minimal clicks.
- Alerts: Color-coded (Red = Critical, Yellow = Warning).
5. Electronic Batch Record (EBR) Execution
5.1. EBR Lifecycle
- Initiation: Batch created from MBR.
- Execution: Operators follow guided steps.
- Data Capture: Manual entries + automated (from PLCs, scales).
- Review: QA checks before release.
- Approval: Electronic signature by supervisor.
5.2. Key Requirements
- Data Integrity:
- No backdating, all changes logged.
- Deviations Management:
- Record out-of-spec (OOS) events.
- Attach investigations (CAPA).
- Reporting:
- Batch Summary Report (PDF/Excel).
- Trend analysis (e.g., yield, cycle time).
5.3. Integration
- ERP (SAP/Oracle): Material consumption, batch status.
- LIMS: QC test results.
- SCADA/PLC: Real-time process data.
6. Compliance & Validation
- 21 CFR Part 11: Audit trails, eSignatures.
- GAMP 5: Category 4/5 software validation.
- Data Backup & Recovery: Daily backups, disaster recovery.
7. Conclusion
This MES design ensures paperless batch execution, real-time process control, and regulatory compliance while leveraging best practices from top MES vendors.
Next Steps:
- Prototype MBR & Recipe in a sandbox.
- Conduct UAT with operators.
- Validate against GxP requirements.
Approval
Role | Name | Signature | Date |
---|---|---|---|
MES Architect | [Name] | [E-Sign] | [DD/MM/YYYY] |
QA Manager | [Name] | [E-Sign] | [DD/MM/YYYY] |
Version Control
Version | Date | Changes | Author |
---|---|---|---|
1.0.0 | [DD/MM/YYYY] | Initial Draft | [Name] |
This document provides a comprehensive, vendor-agnostic MES specification focusing on MBR, Recipe, Process Instructions, and EBR execution. Adjust based on specific industry needs (Pharma, Food, Chemicals).