Week 24 - lglik/Portfolio GitHub Wiki

02/18/19 - 02/22/19

Day One:

No school.

Day Two:

Absent.

Day Three:

Today I finally was able to come back to engineering after having been sick for over a month. I was only here part of the day since I was not fully recovered. I familiarized myself with what I was working on before I left and what the next steps would be. I also checked in on what the other students were working on and what the current projects were. When I was last at school, I had just finished the first version of a new schematic for the wiring for the batteries on the project. I will need to finish that schematic and then make those changes to the actual wiring.

Day Four:

Absent.

Day Five:

All of the wiring for the batteries that I would be modifying is all at the bottom of the project. I realized that working on something thats on the floor for many weeks probably would not be very comfortable or healthy. I have bad knees, so crouching for weeks would be a very bad idea for me. I unplugged and powered down the whole project. I cleaned off some stands for fastener cabinets and used the as blocks to put under the project to elevate it. Besides, being more comfortable, having the wiring higher up means that it will be easier to reach farther into the project to change and swithch out wires.