2024 08 21_meeting - lbl-srg/soep GitHub Wiki
Date: August 21, 2024, 8:15am-9am Pacific Times
The purpose of this meeting is to coordinate the Modelica integration for SOEP.
Join from PC, Mac, Linux, iOS or Android: https://lbnl.zoom.us/my/mwetter
Or iPhone one-tap (US Toll): +14086380968,6614042296# or +16465588656,6614042296#
- Or Telephone:
- Dial: +1 408 638 0968 (US Toll) or +1 646 558 8656 (US Toll) Meeting ID: 661 404 2296 International numbers available: https://lbnl.zoom.us/zoomconference?m=_h5BuJ686mPy3rWEyKf4NROxLaeOV5J8
- Previous action items
- AOP alignment
- OpenStudio integration
- Modelon
- Compiler integration
- Stuart: FMI-QSS
- Modelica Buildings Library
- Kyle, Michael: EnergyPlus-Modelica coupling.
- Other items
Draft specification at https://lbl-srg.github.io/soep/softwareArchitecture.html.
Kyle pushed 24.1.0 to a Buildings Library fork for testing.
Sequence
- 9.6.0
- 24.1.0 without auto-sizing (watch changes to CMake list)
- 24.1.0 with auto-sizing.
To be discussed next time for AOP 25 planning and current milestones.
No discussions.
No discussions.
Michael to organize separate meeting with Stuart and Modelon.
Backlog on fixing various issue.
PNNL has milestones for end of FY for heat pump water heater. Karthik works on slides to discuss HP curve determination.
ORNL has dehumidifier as deliverable end of this month. ORNL works on autotuning PID, waiting for Jianjun's comment. Heat exchanger documentation has been updated. Work on air filter model is ongoing (to support multiple contaminants).
Spawn related PR at https://github.com/lbl-srg/modelica-buildings/projects/2
Update to EnergyPlus 24.1.0, after fixes of some spawn issues below.
Issues are at https://github.com/lbl-srg/modelica-buildings/issues?q=is%3Aissue+is%3Aopen+label%3Aspawn
Next, work on https://github.com/lbl-srg/modelica-buildings/projects/2
OS compatibility matrix is at https://github.com/NREL/OpenStudio/wiki/OpenStudio-SDK-Version-Compatibility-Matrix
Autosizing added variables except for the coincident loads, which is hold up because of a refactoring of exchanged variables, and then picked up again, tentatively with a first implementation in 2 weeks.
None.
Think about priorities for FY25.
None.