2019 01 30_meeting - lbl-srg/soep GitHub Wiki

SOEP Coordination meeting

Date: January 30, 2019, 8:15am-9am Pacific Times

The purpose of this meeting is to coordinate the Modelica integration for SOEP.

Meeting information

Join from PC, Mac, Linux, iOS or Android: https://lbnl.zoom.us/my/mwetter

Or iPhone one-tap (US Toll): +14086380968,6614042296# or +16465588656,6614042296#

Or Telephone:
Dial: +1 408 638 0968 (US Toll) or +1 646 558 8656 (US Toll) Meeting ID: 661 404 2296 International numbers available: https://lbnl.zoom.us/zoomconference?m=_h5BuJ686mPy3rWEyKf4NROxLaeOV5J8

Agenda

  1. Previous action items.
  2. Kyle, Michael: Refactoring room air heat and mass balance.
  3. Michael: Specification for controls I/O.
  4. Michael/Hubertus: Specification for FMI-QSS.
  5. Stuart: FMI-QSS.
  6. Antoine: CI testing (funnel)
  7. Michael: CI testing with JModelica
  8. Kyle, Michael: Optimica license protection.
  9. Michael: JSON representation for OS front-end to Modelica
  10. Other items

Participants

Brian Ball
Kyle Benne
Yan Fei
Antoine Gautier
Jianjun Hu
Stuart Mentzer
Amir Roth
Bo Shen
Michael Wetter
Kun Zhang

Minutes

Refactoring room air balance

See https://github.com/lbl-srg/modelica-buildings/issues/1129#issuecomment-393285857 for open tasks.

Kyle worked on packaging on gitlab. New package was uploaded yesterday to https://gitlab.com/kylebenne/spawn.

Next is Michael to try if new build works (simulation test is failing). EnergyPlus dll and Buildings dll should be in same directory as specified by Modelica annotation.

EnergyPlus I/O variables

Review specification https://github.com/lbl-srg/soep/issues/43

Next is for Kyle to review the specification, in particular what is marked as "todo", and also review side effects if the new parameter sampleAtZoneTimeStep is set to false.

FMI-QSS Specification

Review specification https://github.com/lbl-srg/soep/issues/44

Stuart is fine with new specification.

Waiting for feedback from Modelon.

FMI-QSS

No major activity, waiting for subcontract.

CI testing (funnel)

Antoine works on test cases for funnel and on integration testing for different operating systems.

CI testing (JModelica)

Set up BuildingsPy to simulate with JModelica. Next is to do more testing, add it to the master, and then integrate the funnel from above.

Optimica license protection

Kyle to set up calls with Modelon.

JSON representation for OS front-end to Modelica

Jianjun finished graphical svg output. Next is to clean up html and work on json schema.

Other items

None.

New action items

Michael to test new envelope model.

Kyle to review controls I/O specification.

Previous action items

Jianjun to work on JSON representation for Modelica HVAC that could become the basis for a schema-driven editor.

Michael/Hubertus/Stuart to finalize subcontracts.

Michael/Modelon to finalize FMI-QSS API specification.

⚠️ **GitHub.com Fallback** ⚠️