Firedrake meeting 2024 12 11 - firedrakeproject/firedrake GitHub Wiki
Date and time 2024-12-11 1600 UTC
Action Items
- Pick Chair and Minuter (CW to pick)
- ALL: (ongoing) triage the open issues and confirm if they are indeed still open (and perhaps provide labels)
CW (formerly JB): Move TSFC to firedrake and move FInAT to FIAT(Done)- ALL: do things with SV's branches
- DH: Email to Andreas to have 2 (+ others!!!) loopy PRs merged TODO: FIND OUT WHICH PRS THESE ARE
- DH: Get Firedrake a docker open source account (link here)
- DH: Talk to GregVernon about PR#2116.
- JB: Enable merge queues (minutes)
- LC: Try to merge RNH' PR: Movable VOM
ANY: Add Python 3.13 to PyOP2, TSFC, FIAT, FInAT CI (and others?)(Done)- PB: Profile and speed up some tests (minutes, minutes)
- RK: sort out Firedrake USA details and website before Christmas time
- CW: fix PyOP2+TSFC failing tests
- CW: Fix artefactsv3 issue
Minutes
Present: CW (minuter), SM, RK, PB, IM, KS, DD, DH
Apologies: JHC
RCK: Firedrake USA'25
-
I have a PR with the Web page that's approved, but it's failing CI tests for seemingly unrelated things like PyOP2 and TSFC.
-
Update: we have a travel support request form, are waiting on a business office person to give us a registration link.
-
Merged.
CW: Testing strategy
Someone just reported that Firedrake fails with an int64 build. Since we don't test it we didn't notice. My proposal:
-
We should have a set of smoke tests that target a large surface where we encounter issues (e.g. libsupermesh, VoM, parallel, ...). This should take ~5 minutes to run (and we can even call it
make check
). -
We can run a larger number of possible Firedrake configurations whenever we merge to master (e.g. int64, OpenMPI?, etc). We can also run them if we apply a sensible label like we do for MacOS (
ci:macOS
,ci:int64
, etc). Using pip it only takes about 30 minutes for a workflow to run. -
DH: Tentative approval.
-
Action point CW make this happen.
Merge PRs
Note that PRs put in this section should either be trivial or already have been reviewed. Discussion-worthy PRs should be separate agenda items.
RCK: Firedrake conference
- Merged.
KS:restricted function space with extrusion
- Merged
DD: Enable measure options for Riesz representation
- This would be better exposed via
form_compiler_parameters
. PR is not required.
DD: Ensemble reduced functional arguments
- Merged.
DD: Document the Reduced functional args (pyadjoint)
- Merged.
DD: Options for Riesz represention solver (pyadjoint)
- DD to revisit in light of #3911 feedback.
Date of next meeting
1600 UTC 2025-01-08