Developer Brief Digital File Library - digitalspace/eagle-demi GitHub Wiki
Digital File Library (DFL)
Developer Planning Brief
DEMI Initiative β Environmental Assessment Office (EAO)
Version: Working Draft β April 2026
Status: Pre-Walkthrough Distribution
How to Read This Document
This document is your pre-read for the DFL walkthrough session. It is not a technical specification and does not define your architecture. Its purpose is to give you enough business context, scope clarity, and working-rule grounding that you can arrive at the walkthrough with informed questions and a basis for roadmap planning.
What this document gives you
What this document does not give you
The business problem the DFL must solve and the strategic context it sits in The confirmed v1 scope boundary: what is in, what is deferred, and why The core business rules that must shape the data model (status, visibility, source precedence, intake) A locked minimal metadata contract (Β§16) that ETL and migration can proceed on, independent of the IA workstream The provisional role and permission model A set of suggested work packages to seed your roadmap A project artifact register (Appendix C) identifying every planning and delivery document this project needs to produce
A finalized metadata schema β Β§16 is the ETL floor; the full schema comes from the IA workstream A confirmed technology stack β confirmed at the walkthrough A finalized permissions matrix β provisional roles are described here; the full matrix is a named delivery artifact (Appendix C) Approved KPIs or acceptance criteria β draft success measures are in Β§23; pending EAO sponsor review A migration runbook or cutover checklist β named delivery artifacts to be produced during Work Package 2
Artifacts that will follow this document:
This planning brief is the first DFL-specific document after the DEMI strategic plan. The project will produce a defined set of downstream artifacts. See Appendix C for the full artifact register with owners and sequencing. Key artifacts include: Permissions Matrix, Minimal Metadata Contract (locked in Β§16), Migration Runbook and Cutover Checklist, and Test and Acceptance Plan.
This document is the business-aligned planning brief that should guide your architecture decisions, backlog creation, milestone planning, and phased delivery. It is not a final technical specification.
The DFL sits at the centre of DEMI β the EAO's digital ecosystem modernization initiative. It is the EAO's future single, authoritative repository for operational project files. EPIC.centre is the primary internal and partner-facing interface. EPIC.eagle and EPIC.public surface public files. SharePoint remains the place for collaboration and drafting, not the long-term file of record.
Post-launch operational ownership of all DEMI components transfers to the Digital Services Team (DST).
2. Strategic Context and Business Problem
The EAO's project records are currently spread across multiple systems: EDRMS, EPIC holdings, the I:/ Drive, SharePoint, Teams, and legacy paper records. This fragmentation makes it hard to find the right file, slows down operational work, creates duplication, and increases risk in records management, public access, Freedom of Information response, and long-term continuity.
DEMI was created to address this by building a unified digital ecosystem. Within DEMI, the DFL is the official file-of-record repository for operational project files. It holds final authoritative copies, supports consistent metadata and retention rules, enables internal and public discovery, and reduces dependence on fragmented legacy repositories.
The plain-language goal The DFL is where the EAO should be able to say, with confidence: "this is the file of record."
Note on paper records: The EAO holds an estimated 27,000 physical paper records in offsite storage that will undergo scanning, OCR, and AICT classification as a separate future project. DEMI β including the DFL and AICT β is a dependency of that scanning project, not the reverse. The paper records workstream is out of scope for DFL v1 but must not be foreclosed by v1 architecture decisions.
3. Product Vision
The Digital File Library will be a secure, scalable, cloud-based repository for the EAO's operational project files. It will store authoritative digital files across project lifecycles, support metadata and retention management, preserve version lineage, and allow files to be surfaced appropriately to staff, government users, and the public. See Appendix B for the full DEMI component relationship diagram.
Component
Role
DFL (this system)
Central file-of-record repository and storage layer
EPIC.centre
Primary interface for EAO staff and government partner users
EPIC.eagle
Legacy public-facing service; being replaced by EPIC.public over time
EPIC.public
Modern public-facing service surfacing DFL files marked for public release
EPIC.submit
Intake channel for externally submitted project files
ETL pipelines
Migration and ingestion from legacy source systems
SharePoint / Teams
Collaboration and drafting only β not the file of record
EDRMS / I:/ Drive
Legacy sources; to be migrated into DFL over time
EPIC.engage
Out of scope for DEMI v1 and v2; may contribute files in v3 or later
Architecture note for the walkthrough A conceptual architecture diagram showing the DFL at the centre, with inflows from EPIC.submit and legacy sources, and outflows to EPIC.centre and EPIC.public, will be presented at the walkthrough session. See Appendix B. The specific technology stack β including storage platform β will be confirmed at that session.
4. Business Ownership and Governance
The day-to-day business owner for the DFL is Geoff McDonald. Until the Information Architecture and EPIC.centre permissions work are fully complete, Geoff acts as the escalation point for business-rule interpretation and exception decisions. Post-launch operational ownership of all DEMI components transfers to the Digital Services Team (DST).
Role
Person / Group
Notes
Product Owner
Geoff McDonald
Business-rule interpretation and exception decisions
Geospatial project linkage and spatial metadata authority
Privacy / Security Representative
TBD β must be assigned before design begins
Privacy impact and security sign-off
Records Management Advisors
To be identified
ORCS, retention, and disposition decisions
Post-launch operational owner
Digital Services Team (DST)
All DEMI components; effective at go-live
Developer liaison: During delivery, developers liaise day-to-day with Geoff McDonald and Alyd Llewellyn.
5. What the DFL Is, and Is Not
5.1 What the DFL Is
The DFL is the authoritative repository for the EAO's operational project record. It is specifically for files that form part of the operational record of a project, not a general repository for every file that mentions one.
Bucket
Description
Decision-path materials
Anything necessary to reach a project decision: files submitted to, created by, or considered by the EAO.
Project communications
Communications about the project (within government and externally) that form part of the operational record.
Other non-administrative project materials
Other materials relevant to the project that are not merely administrative records.
5.2 What the DFL Is Not
The DFL is not intended to hold:
General administrative records governed under ARCS
Indigenous Knowledge files
Compliance and Enforcement investigation materials
Purely administrative support records (travel receipts, unrelated internal administration documents)
Business rule: Upload blocking in v1 The system must not hard-block uploads based on content type in v1. The DFL uses a light-touch model, relying on policy, training, guidance, and AI flagging. Mixed-content or questionable records are handled case-by-case.
6. File-of-Record Rule
Admission and file-of-record rule During Metadata Verification Hold, the file may be physically stored in a staging area within the DFL platform, but it is not admitted as a DFL record (file of record) until verification is completed. Admission is the moment the record becomes searchable (per permissions), receives its final visibility, and is governed by the DFL status/visibility model.
A file becomes a file of record when it enters the DFL through an accepted intake path, provided it is a legitimate government-held version and not an erroneous or inappropriate submission. A file does not need to be fully approved in the everyday business sense. What matters is whether it has entered the operational record properly.
~65,000 files; first ETL and cutover stream. These files are the primary AICT training corpus.
1B (v1)
Additional EPIC.eagle public files (gap fill)
Est. 65,000β75,000 digital records total across 1A and 1B
2 (v1)
EPIC.submit
Ongoing intake integration
3 (v1)
EPIC.centre manual upload
In v1 scope
4 (post-v1)
EDRMS
Legacy migration; authoritative source β EDRMS wins on conflict
5 (post-v1)
I:/ Drive
Legacy migration
6 (post-v1)
SharePoint
Legacy migration
7 (post-v1)
MS Teams
Legacy migration
9. Source Precedence and Conflict Resolution
Default precedence rule EDRMS wins unless manually overridden. Where the same historical file exists in both EPIC.eagle and EDRMS and the two do not match, EDRMS is the authoritative source. Some EPIC.eagle files were fragmented or altered to meet older technical limits (e.g., broken into 10MB chunks), reinforcing the need for caution during reconciliation. AICT must never override source-precedence decisions made by ETL.
Override authority:
The OpsDiv Executive responsible for the project decides which version of a conflicting file enters the DFL. The DEMI team will work with EAO Executive on these decisions. Override decisions are executed by DFL SuperUsers acting on that direction.
Required v1 system behaviour:
Automated duplicate detection (matching algorithm and confidence thresholds defined in the Migration Runbook β Appendix C)
Candidate matching logic sufficient to support human review
No automated overwrite of authoritative historical records
Human business review must remain part of the override path at all times
All override decisions must be logged (who, when, which version chosen, reason)
10. User Roles for v1
Role
Description
Project Team Member
Team-level access to files for their specific project
EAO Staff
Broader internal access across projects
DFL SuperUser
Advanced operational permissions across all non-admin roles. ~6β10 in v1. Can change file status, manage visibility, resolve conflicts, edit protected metadata, and manage exception cases.
System Administrator / Developer
Full system-level access for administration and support
Permissions matrix: open item The full permissions matrix by role and action is a named delivery artifact (see Appendix C). It is a dependency that must be resolved before public-facing cutover. In the interim, default visibility rules per intake type (see Β§13) govern what SuperUsers and staff can and cannot expose.
11. Visibility Model for v1
Visibility defines which audience group can see a file. It is one of two independent dimensions governing file access β the other is Status (Β§12). Changes must be controlled and logged.
11.1 Visibility Levels
Standard paragraph: Intended vs effective visibility rule During hold, intended visibility may be captured but is not effective. On admission, default visibility is Project Team Only unless a permitted user explicitly sets a different visibility.
Visibility Level
Description
Project Team Only
Used for unapproved or in-progress operational records. Accessible only to project team members. Default on admission.
All EAO
Used for approved internal records. Accessible to all EAO staff.
All IDIR
Used for records intended for broader government sharing. Accessible to all BC Government IDIR users.
Public
Used for records released through EPIC.public / EPIC.eagle. Accessible to the general public. Requires explicit permitted human action and logging.
11.2 Status Γ Visibility Interaction Matrix
Status \ Visibility
Team Only
All EAO
All IDIR
Public
Active
Yes
Superseded
Yes
Rare
No
Transitory
Yes
Rare
No
Retracted
Yes
Rare
Redacted only
Legend
Meaning
Yes
Normal and expected combination
Rare
Technically possible but uncommon; requires explicit justification
No
Not a supported combination in v1
Redacted only
File may appear publicly only if it carries a formal Redacted flag
12. Status Model and File Lifecycle
Status defines the current standing of a file within the operational record. It is one of two independent dimensions governing file access β the other is Visibility (Β§11).
12.1 Status Values
Status
Meaning
Notes
Active
The current valid file of record.
Default status on entry through any accepted intake path.
Superseded
An older version replaced by a newer valid version.
Remains in the record unless disposition rules determine otherwise.
Transitory
A file that should not remain in the enduring record.
Must include a reason. May be flagged for culling through records management tools.
Retracted
A file no longer primary for use or sharing.
Must include a reason. Retraction withdraws the file from EPIC.public unless officially redacted.
12.2 Status Change Permissions
Status changes may be applied by members of the team that posted the file, or by DFL SuperUsers.
12.3 Status Presentation
Superseded and retracted records must remain understandable in context. Users must be able to see that a file was once primary and is no longer primary, and why.
13. EPIC.submit Intake Rules
The three types below correspond to existing EPIC.submit process classifications.
Type
Enters DFL
Default Visibility
Version Behaviour
Type 1
At submission
Project Team Only
May be managed through EPIC.centre as part of the operational record if it joins the decision path.
Type 2
At submission
Project Team Only (broadens after staff confirmation)
Visibility expands once a staff member confirms the file is the expected item.
Type 3
Each version at submission
Project Team Only
Earlier versions marked Superseded. A SuperUser may later apply ORCS rules to determine if superseded versions are Transitory.
14. Public Release Model
The DFL holds the file. EPIC.public / EPIC.eagle displays files marked "share to public."
14.1 When a File May Be Flagged for Public Access
At upload through EPIC.centre
At approval through EPIC.submit
At any time later through the share/access interface in EPIC.centre
14.2 Publishing Behaviour
Once marked for public access, the file must appear in EPIC.public near real-time. Target: 30 seconds or less.
14.3 Withdrawal from Public View
EPIC.public shows nothing, unless the file has been officially redacted.
If officially redacted, EPIC.public displays the file name with a Redacted flag.
Security dependency The must-not-fail condition "no exposure of internal-only files" depends directly on the permissions matrix being locked before any public-facing cutover. This is a hard gate. See Appendix C.
15. Search Requirements for v1
The confirmed top-five search priorities for DFL v1:
Priority
Search Requirement
1
Find all files for a specific project
2
Find the current file of record for a document type within a project
3
Find all public files for a project
4
Find all files of a given file type across all projects
5
Find all files with a given topic metatag across all projects
Performance target Search results must appear within 10 seconds or less. A visible progress indicator is required where results take more than 2 seconds. Load profiles and SLOs will be defined in the Test and Acceptance Plan (Appendix C).
16. Metadata and Information Architecture
Metadata is foundational to the DFL. All files must carry common tags and ORCS-linked attributes. The AI Classifier (AICT) applies curated tags and retention-related metadata using controlled vocabularies that are maintainable by EAO staff and re-runnable against backfiles.
Status: LOCKED for migration purposes This contract is locked and independent of the IA workstream. ETL and migration may proceed on these fields. If the full IA metadata schema is delayed, this contract is frozen as-is and migration proceeds on it. The full enterprise metadata model extends these fields but does not replace them.
Required fields β all 12 must be populated on every ingestion:
Field
Type
Cardinality
Controlled Vocabulary / Example
record_id
string (UUID)
1
System-generated. e.g., dfl-uuid-1234
title
string
1
Human-readable title of the file
project_id
string
1
EAO canonical project code
file_type
string
1
pdf β docx β geotiff β zip β msg
creator
string
1..*
Person or organization; name (ORCID/email optional)
Active β Superseded β Transitory β Retracted
visibility
string
1
ProjectTeam β AllEAO β AllIDIR β Public
retention_class
string
1
ORCS tag or schedule reference. e.g., ORCS:Operational-7yrs
Optional but strongly recommended fields:
Field
Type
Notes
checksum
string (SHA-256)
File integrity verification; critical for migration validation. Treat as effectively required for Priority 1A.
file_size
integer (bytes)
Required for storage planning and upload validation
mime_type
string
IANA media type; e.g., application/pdf
keywords/tags
string[]
Topic metatags; enables top-5 search priority #5
public_flag
boolean
Explicit flag indicating public release status
redaction_flag
boolean + reason
Indicates official redaction; drives EPIC.public display behaviour
16.2 IA Workstream Dependency
The full enterprise metadata model β controlled vocabularies, extended attributes, and AI classifier configuration β is coming from the IA workstream and must be delivered before Work Package 6 begins. The minimal contract above is the build floor until then.
v1 must support a metadata structure extensible without redesign
AI-assisted enrichment must be supported where possible
Protected metadata editing must be available to SuperUsers
17. File Types, Size, and Security
For v1, the DFL must support all file types, including: PDF, Word/Excel/PowerPoint, images, video and audio, GIS and spatial files, zipped packages, email message files, and very large application packages.
Requirement
Detail
Maximum file size
Potentially gigabytes. Validate average and distribution from EPIC.eagle and EDRMS during design.
Malware / virus scanning
Standard security controls required on every upload.
Upload performance target
Normal single-file upload within 20 seconds.
18. Minimum Logging and Traceability for v1
Full enterprise audit capability is not required on day one. The following minimum operational log must be preserved from the start:
Event
What to Log
File upload / staging
Who uploaded, when, source system
File admission (verification completion)
Who completed verification, when, intended vs effective visibility set
Visibility change
Who changed visibility, from what level to what level, when
Retraction
Who retracted the file, when, reason
Version supersession
Which version superseded which, and when
Source precedence override
Who made the decision, which version was chosen, reason given
Public publication
Date and time of publication to EPIC.public
Public withdrawal
Date and time of withdrawal from EPIC.public, reason if applicable
19. Environments, Release Path, and Cutover
The DFL follows a standard DEV β TEST β PROD release path.
v1 rollout sequence:
Complete build and integration in DEV
Validate in TEST (intake rules, classifier behaviour, visibility changes, load handling)
Execute Priority 1A ETL migration into the DFL
Perform cutover
Make the DFL-backed EPIC.public path live
Priority 1A is the critical first migration stream. Public continuity is a core cutover condition. A Migration Runbook and Cutover Checklist will be produced during Work Package 2 and must be signed off before go/no-go. See Appendix C.
20. Operational Ownership After Launch
Post-launch operational ownership of all DEMI components transfers to the Digital Services Team (DST).
Function
Owner
Day-to-day administration
OpsDiv
User support
Digital Services Team (DST)
Metadata and rules maintenance
DST
Retention and disposition decisions
Records Management
21. Non-Functional Requirements for v1
Requirement
Target
Storage infrastructure
Secure, government-approved cloud infrastructure
File volume and size
Large file volumes; very large individual files (potentially GBs)
Metadata model
Extensible without redesign
Integration
Compatible with EPIC.centre, EPIC.submit, and EPIC.public
Traceability
Minimum log defined in Β§18, operational from day one
Migration resilience
Stable operation during migration and cutover windows
Security scanning
Malware and virus scanning on every upload
Search response
10 seconds or less
Single file upload
20 seconds or less
Public publishing
30 seconds or less
Availability
5% or less acceptable downtime
Visibility controls
Controlled, logged state transitions
22. Risks and Must-Not-Fail Conditions
22.1 Key Risks
Misalignment with EPIC release schedules
Metadata drift: migrating with provisional tags creates inconsistent search and retention behaviour
Security exposure: undefined permission mapping combined with automated ETL risks accidental public exposure of internal files
SuperUser capacity: 6β10 SuperUsers may be insufficient for manual conflict resolution at scale during Priority 1A
IA dependency: delayed metadata contract blocks Work Package 6 and may require freezing the Β§16 floor earlier than planned
Over-engineering before IA and permissions work is settled
22.2 Must-Not-Fail Conditions for v1 Cutover
These are hard gate criteria. They must be built into testing, migration validation, and the Cutover Checklist. No go/no-go decision may proceed without sign-off on all four. 1. No public file loss 2. No interruption to EPIC.public document availability 3. No exposure of internal-only files to public channels 4. No broken project-to-file relationships
Must-not-fail condition #3 has a direct dependency: the permissions matrix must be locked and tested before any public-facing cutover can proceed.
23. Success Measures for v1
Success will be judged by: repository consolidation, discoverability, metadata quality, reduced duplication, and more efficient operational use.
EPIC.eagle public files are successfully moved into the DFL without loss
Public document access continues without disruption
Staff can reliably find current versions of project files
New submitted files flow into the DFL correctly
Visibility controls work for EAO staff
Duplicate repositories begin to reduce
Draft KPI candidates β PENDING EAO sponsor review The following are working candidates only. They have not been reviewed or approved by EAO project sponsors and must not be treated as acceptance criteria. Formal acceptance criteria β with measurement methods, owners, data sources, and pass/fail thresholds β will be defined in the Test and Acceptance Plan (see Appendix C). β’ 100% of Priority 1A files migrated with validated file counts and project links β’ 0 confirmed incidents of internal-only files exposed publicly at cutover β’ Public-facing document availability maintained during and after cutover β’ 95%+ of test search tasks completed successfully by pilot users β’ 95%+ of new EPIC.submit files routed correctly to the DFL during pilot β’ Measurable reduction in ongoing use of duplicate storage for pilot projects
24. Open Items and Controlled Assumptions
These items are in progress. They are not blockers to roadmapping, but each will constrain specific design decisions as it resolves. See Appendix C for the artifact register that tracks resolution ownership and sequencing.
Open Item
Current Assumption
Blocks
Full metadata schema and controlled vocabularies
Β§16 minimal contract is the ETL floor until IA delivers
Work Package 6
Permissions matrix by role and action
Provisional role model in Β§10; default intake visibilities in Β§13
Public-facing cutover (hard gate)
Technology stack / storage platform
Azure strongly expected (BC GOV Microsoft contract)
Confirmed at walkthrough
EPIC.centre search and share interface design
Top-5 search priorities defined in Β§15
Work Package 4 detailed design
Privacy and security advisor assignment
TBD β must be assigned before design begins
Work Package 7 and cutover security sign-off
Disposition automation rules
ORCS baseline tagging only for v1
Post-v1 phase
Exception handling for mixed-content / sensitive records
Case-by-case; SuperUser + policy guidance
Operational policy document; before launch
KPI and acceptance criteria sign-off
Draft candidates in Β§23
Test and Acceptance Plan; before testing phase
25. Recommended Developer Work Packages
These work packages seed your roadmap. Each maps directly to the v1 scope defined in Β§7. Effort sizing, sprint assignment, and detailed ownership will be established at and after the walkthrough session.
Work Package
Description
v1 Scope Note
Key Dependency
WP1: Core repository and data model
Build the DFL storage model, file entity structure, status model, visibility model, version lineage, and minimum logging.
Fully in v1 scope
Β§16 metadata contract (locked)
WP2: Priority 1A migration and reconciliation
Design and implement ETL for EPIC.eagle public S3 files, including duplicate detection, project linking, validation, and cutover readiness. Produce the Migration Runbook and Cutover Checklist.
Fully in v1 scope. Priority 1B follows.
Β§16 metadata contract; permissions matrix
WP3: EPIC.submit integration
Design submission intake pathways, type-based file handling, version behaviour, and permission state transitions for all three submission types.
Fully in v1 scope
WP1 complete
WP4: EPIC.centre internal interface
Enable search (top-5 priorities), manual upload, metadata display, visibility control, and status handling for internal and government users.
Fully in v1 scope
WP1 complete; permissions matrix
WP5: EPIC.public publication path
Enable near-real-time public surfacing of DFL files based on public-share flags, including redaction behaviour.
Fully in v1 scope
Permissions matrix (hard gate before go-live)
WP6: Metadata and AI integration
Implement the baseline metadata contract and prepare for AI classifier enrichment and ORCS tagging.
Partially in v1 scope. Full enterprise metadata model and advanced disposition deferred.
IA workstream metadata contract; falls back to Β§16 floor if delayed
WP7: Security, operations, and support readiness
Implement upload security controls (malware/virus scanning), monitoring, support handoff, and operational admin functions.
The Digital File Library is the foundational repository layer for DEMI. It is the mechanism by which the EAO will establish a single, authoritative operational project record across internal, government, and public contexts.
The first release should focus on a practical, high-value outcome: move the current EPIC.eagle public file base into the DFL safely, preserve continuity of public access, enable proper intake from EPIC.submit, provide internal search and visibility control, and establish the core rules for status, versioning, metadata, and source precedence.
Next step Bring your questions from this document to the walkthrough session. The walkthrough will confirm the technology stack, walk through the architecture, and give you the opportunity to identify gaps, raise risks, and align on the planning approach before roadmapping begins. After the walkthrough, priority artifact production is: Permissions Matrix, Migration Runbook and Cutover Checklist, and Test and Acceptance Plan. See Appendix C.
Appendix A β Canonical Terms / Glossary
The terms below are canonical across all four DEMI developer planning briefs. Use these definitions wherever the terms appear.
Standard paragraph: Admission and file-of-record rule During Metadata Verification Hold, the file may be physically stored in a staging area within the DFL platform, but it is not admitted as a DFL record (file of record) until verification is completed. Admission is the moment the record becomes searchable (per permissions), receives its final visibility, and is governed by the DFL status/visibility model.
Standard paragraph: Intended vs effective visibility rule During hold, intended visibility may be captured but is not effective. On admission, default visibility is Project Team Only unless a permitted user explicitly sets a different visibility.
Term
Definition
Notes
Admission
The moment a staged file becomes a DFL record. At admission the record becomes searchable (per permissions), receives effective visibility, and is governed by the DFL status/visibility model.
See standard paragraphs above
AICT
AI Classifier Tool. An assistive metadata enrichment and classification service. AICT never makes business-critical decisions autonomously.
DFL
Digital File Library. The authoritative repository and storage layer for EAO operational project files.
DFL record / File of record
A file admitted into the DFL through an accepted intake path, governed by DFL metadata, status, visibility, and logging rules.
EDRMS
Electronic Document and Records Management System. The BC Government-sanctioned system of record. EDRMS files take precedence over transformed or fragmented counterparts in other systems.
Effective visibility
The visibility level that actually controls access to a record. Begins at admission.
EPIC.centre
The internal and government-partner operational interface for search, upload, metadata verification, and visibility management.
Canonical spelling: 'centre'
EPIC.eagle
The legacy public-facing service and historic upload pathway, being replaced by EPIC.public over time.
EPIC.engage
An EPIC.system application not in scope for DEMI v1 or v2. May contribute files to the DFL in v3 or later.
Out of scope β v3+
EPIC.public
The modern public-facing service that surfaces publicly accessible DFL files.
EPIC.submit
The invitation-only external intake portal for Proponents and Certificate Holders. Files enter the DFL after AICT verification and EPIC.submit approval.
EPIC.system Integration
The DEMI workstream delivering EPIC.centre changes for DFL search, upload, verification, and visibility management. Informally: EPIC Integration.
ETL
Extract, Transform, Load. The pipeline process for migrating files from legacy source systems into the DFL.
File ETL
The DEMI workstream migrating legacy files from EDRMS, EPIC.eagle, I:/ Drive, SharePoint, Teams, and other sources into the DFL.
Intended visibility
A visibility selection captured during Metadata Verification Hold. Not effective until admission.
Metadata Verification Hold
A workflow hold state (informal: pause). File is staged but not yet admitted and not broadly searchable.
Not a DFL Status value
Public surfacing
A DFL record with Public effective visibility displayed in EPIC.public. Requires explicit permitted human action; logged.
Status (DFL)
The lifecycle state of a DFL record: Active, Superseded, Transitory, or Retracted.
Visibility (DFL)
The audience access level of a DFL record: Project Team Only, All EAO, All IDIR, or Public.
Appendix B β DEMI Component Relationship Map
The diagram below shows the full DEMI ecosystem: intake channels that bring files into EPIC.centre and the ETL pipelines, the AI Categorizer (AICT) that enriches them, the Digital File Library that stores authoritative records, and the public and operational interfaces through which files are surfaced.
Note on EPIC.engage: EPIC.engage is an EPIC.system application not in scope for DEMI v1 or v2. It appears in this diagram for completeness. In a future version (v3 or later), files collected in EPIC.engage may flow into the DFL. No developer action is required in the current scope.
Appendix C β Project Artifact Register
This register identifies every planning and delivery document the DFL project needs to produce. Owners, dates, and sequencing will be confirmed at and after the walkthrough session.
This document in context This Developer Planning Brief is the first DFL-specific document after the DEMI Strategic Plan. All artifacts listed below are downstream of this brief.
Artifact sequencing legend:
Phase 1: Pre-build / design (must exist before build begins)
Phase 2: During build (produced as part of delivery)
Phase 3: Pre-cutover (must exist and be signed off before go/no-go)
Phase 4: Post-launch (operational and ongoing)
Artifact
Description
Phase
Owner
Status
DFL Developer Planning Brief (this document)
Business context, scope, business rules, minimal metadata contract, work packages.
1
Geoff McDonald
DRAFT β pre-walkthrough
Permissions Matrix
Full mapping of roles to actions, including visibility transition rights, status change rights, and protected metadata access. Hard gate before public cutover.
1
Geoff McDonald + Alyd Llewellyn
NOT STARTED
Full Enterprise Metadata Model
Extended metadata schema, controlled vocabularies, AI classifier configuration. Delivered by IA workstream.
1
IA Workstream
IN PROGRESS
Information Architecture (IA) Document
Full IA including taxonomy, metadata schema, controlled vocabularies, and EPIC.centre integration points.
1
IA Workstream
IN PROGRESS
Privacy and Security Assessment
Privacy impact assessment and security review for DFL design and public surfacing path.
Matching algorithm detail, confidence thresholds, human-review queue design, SLA for manual review, and audit log requirements.
2
WP2 Lead + Geoff McDonald
NOT STARTED
EPIC.submit Integration Spec
Detailed intake rules for Type 1/2/3 files, including state transitions, visibility defaults, and version handling.
2
WP3 Lead + Geoff McDonald
NOT STARTED
SuperUser Operational Playbook
Quick reference for SuperUsers: how to retract, supersede, redact, resolve conflicts, and log decisions.
2
Geoff McDonald + OpsDiv
NOT STARTED
Test and Acceptance Plan
Formal acceptance criteria for each KPI. Covers migration validation, security validation, search validation, and operational readiness.
3
Geoff McDonald + Alyd Llewellyn
NOT STARTED β pending sponsor KPI sign-off
Cutover Checklist
Step-by-step cutover sequence with named approvers and go/no-go gate criteria. Must include must-not-fail conditions from Β§22.2.
3
WP2 Lead + Geoff McDonald
NOT STARTED
Security Sign-off
Formal security clearance for public-facing cutover. Covers permissions matrix testing and internal/public file separation.
3
Privacy/Security Advisor
BLOCKED β advisor not yet assigned
Operational Runbook
Day-to-day operational procedures for OpsDiv and DST: administration, user support, metadata maintenance, incident escalation.
4
OpsDiv + DST
NOT STARTED
Retention and Disposition Rules
Formalized ORCS-aligned disposition rules for DFL records. Extends the v1 ORCS baseline.
4
Records Management
NOT STARTED
Immediate priorities after the walkthrough 1. Assign the Privacy and Security Advisor β unblocks WP7 and the Security Sign-off 2. Begin the Permissions Matrix β hard gate for public-facing cutover 3. Confirm KPIs with EAO sponsors β unblocks the Test and Acceptance Plan 4. Begin the Migration Runbook β Priority 1A ETL design cannot be finalized without it
Appendix D β Key External Dependencies
The following are external inputs or approvals that the DFL development team must design to accommodate. These are not open architecture questions β they are dependencies with named owners and timing requirements.
Dependency
Required for
Owner / Source
Timing
Information Architecture workstream β controlled vocabularies and extended metadata model
Final metadata field contract; vocabulary grounding for AICT
IA workstream (EAO)
Must precede Work Package 6
BC Government ORCS manual and retention schedules
ORCS and retention tagging
BC Government / GIMO
Must be in hand before ORCS classification development
Permissions Matrix (full role-to-action mapping)
Public-facing cutover gate
Geoff McDonald + Alyd Llewellyn
Hard gate before EPIC.public go-live
Privacy and Security Advisor assignment
Privacy Impact Assessment and security sign-off
EAO / Ministry
Must be assigned before design begins
MISO approval β EPIC.public corpus as AI training data
AICT model training
Ministry Information Security Officer
Must be confirmed before AICT training commences
EPIC.track β First Nations names list
First Nations name classification input for AICT
EPIC.track / EPIC.system team
Must be available before AICT goes to production
Test and Acceptance Plan