What have been your major achievement since this week?
By the ninth week of the workshop, we have basically determined the design of our design. Through the feedback data obtained from the second interview, we conducted analysis and research. We will transcribe the interview, and then find out the insights through the Affinity Diagram to analyze and summarize the data in detail, and determine how we should arrange our control panel.
What has each person done to contribute to that?
For a while before, because our current main task is to determine the arrangement of the control panel, we concentrated most of our energy on the interview. That is to say, the main person of each of us is interviewing. This work is the same. Each of us has interviewed 2 people. After the interview, we transcribed the content of the interview and made it into the form of text. Then we chose a day to hold the group meeting, we sat together to analyze the interview data, that is, to organize the insights and make the Affinity Diagram.
What are the key things you need to achieve before week11?
Because there is still a period of time from 11 weeks, our next task is to start making prototypes. We plan to make a paper prototype by the 11th week, and then we will find as many participants as possible to test and investigate our paper prototypes. We hope to take advantage of the data collected through paper prototypes, user feedback on the operator interface, and feedback on some details of the experience. Because this time the paper prototype will be the first time we show our concept concrete, this step is especially important, the collected data is also very meaningful, and the production of our next final prototype is crucial. important.
What is each person going to do contribute to that?
Everyone in our group has made an important contribution in this process. In the work before the ninth week, everyone in our group found participants to interview. Then, after integrating the information collected in the interview, we discussed the data analysis together, so at this step, the work we did was very important and played an important role in the progress of the group project.
What are the big concerns moving forward?
As of now, the progress of our team project is going smoothly. At present, our only concern is to hope that the information collected through the paper prototype test and collected will be efficient and useful.