Meeting 8 of 352 - bounswe/bounswe2025group5 GitHub Wiki
Details
📅 Date: 16/03/2025
📍 Location: Zoom
🕐 Duration: Evening
📝 Note Taker: Yusuf Onur Öksüz
👥 Attendees
- Uygar Apan
- Abdurrahman Arslan
- Serdar Bahar
- Ahmet Mert Balcı
- Ahmet Çağdaş Girit
- Abdülkerim Kasar
- Yusuf Onur Öksüz
- Cengiz Bilal Sarı
- Yüksel Eren Şen
- Ahmet Ege Tanrıverdi
- Osman Yusuf Tosun
Agenda
- Sequence Diagrams
- Waste logging logic
- Block-unblock/follow-unfollow/ban system
- Feedback on Moodle
Discussion Items
- We discussed about how to handle the sequence diagrams.
- Agreed on asking the customer what percent of it should be finished until what deadline.
- Discussed how to share which diagrams are going to be drafted by who.
- The use case diagram is split into subsets to be distributed later.
- We discussed about if the waste logging are goal specific.
- Discussed how would our choice on this effect our requirements and what do we want our app to do.
- Agreed on if someone wants to pursue several goals for waste reduction they need to log them seperately.
- Agreed the badges and the leaderboards are also going to be tracked for every specific goal.
- We discussed that if we want to have a user follow system.
- Discussed follow/unfollow block/unblock system between users.
- Discussed ban system (my moderator) and report system (a user should be considered for the ban after a number of reports).
- We decided to ask the details to the customer.
- Concluded implementing this new systems will update our use case and class uml drafts.
- We discussed the feedbacks given on Moodle.
- 1.2.3.1 : We concluded we want to keep the leaderboards depending on points accumulated.
- 1.1.5.4 : We concluded the system should give the points and keep track of it.
- 1.1.3.2 : We concluded we want to users to earn points per weight reduced
- Since leaderboards and waste reduction goals are tracked seperately this won't cause a problem.
- 1.2.2.3 and 1.1.2.5 : We concluded there was a typo and the user should "view" the charts and graph that are generated by the system
Action Items
# | Details | Assignee(s) | Deadline |
---|---|---|---|
1 | Distributing the decided subsets in the meeting on use case diagrams to group members for drafting sequence diagrams | Ahmet Ege Tanriverdi | 17.03.2025 |
2 | Creating sequence diagram drafts for the assigned use case subsets | Uygar Apan, Serdar Bahar, Ahmet Mert Balcı, Ahmet Çağdaş Girit, Abdülkerim Kasar, Yusuf Onur Öksüz, Yüksel Eren Şen, Ahmet Ege Tanrıverdi, Osman Yusuf Tosun, Abdurrahman Arslan, Cengiz Bilal Sarı | 20.03.2025 |
3 | Asking the customer about the follow system and the sequence diagram | Abdülkerim Kasar | 17.03.2025 |
4 | Checking if our drafts on Class UML diagrams are handling our requirements | Abdurrahman Arslan, Yusuf Onur Öksüz | 17.03.2025 |
5 | Make the changes as discussed in the meeting for the feedbacks of Suzan Hoca | Yusuf Onur öksüz | 18.03.2025 |