Meeting 7 of 451 - bounswe/bounswe2025group5 GitHub Wiki

Details

📅 Date: 14 / 10 / 2025
📍 Location: Lab Session
🕐 Duration: 15.00-17.00 📝 Note Taker: Yüksel Eren Şen


👥 Attendees


Agenda

  1. Demo scenario and scope discussion
  2. Planning for milestone 1 and milestone 2 tasks
  3. Challenge and waste goal implementation
  4. Mobile–Web synchronization and frontend adjustments

Discussion Items

  • Demo Scenario Props:
    The demo may include the following flows:

    • Post: comment and like features
    • Profile page
    • Challenge page
    • Waste goal
    • Waste log
    • Register and login (to be shown quickly)
    • Colorblind mode and language support
  • Backend Logging & Challenge Implementation (Milestone 1):
    Backend endpoints for challenge and waste features will be integrated.
    Logging mechanisms for API requests will be added for monitoring.
    HTTPS configuration will be finalized.

  • Frontend Updates:

    • Homepage will show only Login and Register.
    • Feed page will include posts with comments and likes.
    • Profile page will be shown for milestone 1.
    • Challenge page will display existing challenges and logs according to backend.
    • Waste goals and logging will be displayed dynamically.
  • Challenge Creation Approval:

    • Challenge creation will be implemented in milestone 1,
      but approval flow will be postponed to milestone 2,
      since moderators are not yet implemented.
  • Mobile vs Frontend Display:

    • Mobile and web do not need to show exactly the same content.
    • Mobile will show full-screen images for rendered posts.
    • Aim: Ensure data synchronization so that
      • posts created on mobile are visible on web,
      • and challenges created on web are visible on mobile.
  • Demo Flow:

    • The demo will be narrated first-person style.
    • Emphasis will be on smooth flow between registration, login, posting,
      challenges, and waste tracking.
  • Next Steps:

    • Frontend and mobile teams will hold a joint meeting on Friday to align.

Action Items

# ## Details Assignee(s) Deadline
1 1 Finalize backend logging and HTTPS configuration Backend Team 17.10.2025
2 Implement post interactions (comment, like) and feed page Frontend Team 18.10.2025
3 Integrate challenge and waste goal endpoints into frontend Frontend Team 18.10.2025
4 Ensure mobile will render fullpage images Mobile Team 19.10.2025
5 Prepare demo flow and rehearse first-person narration All Members in lab 14.10.2025
6 Conduct joint mobile–frontend sync meeting Frontend & Mobile Teams 17.10.2025